A district judge has ruled that two roads are of so little use to the public that the London Borough of Barnet need not adopt them.
Bellway Homes and Taylor Wimpey Homes had applied under s37 of
the Highways Act 1980 to have the roads adopted. Section 37 allows
the developer to construct roads and complete the development
without the need for a formal road agreement with the Highway
Authority. Provided the roads are considered to be of
"sufficient utility to the public" and have been
constructed to an acceptable specification, the Highway Authority
will usually accept the notice of proposed dedication and following
a 12-month maintenance period the roads will become maintainable at
the public expense.
The London Borough of Barnet argued that the two roads, with no
through route, were not of "sufficient utility to the
public" to justify them becoming maintainable at public
expense under s37(2). The roads did not have a wider use than
simply providing access to residential properties and by applying
its highway adoption criteria policy (and presenting similar
criteria used by other highways authorities before the court) it
successfully argued that they did not reach this threshold.
The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.