United States:
Technical Evaluation Of The Gold King Mine Incident Released
30 October 2015
Smith Gambrell & Russell
To print this article, all you need is to be registered or login on Mondaq.com.
The DOI and the U.S. Army Corps reported yesterday that the EPA
Animas River spill was caused by failure to recognize and assess
hydraulic forces built up as a result of remediation activity. A
copy of the report can be found at HERE.
The content of this article is intended to provide a general
guide to the subject matter. Specialist advice should be sought
about your specific circumstances.
POPULAR ARTICLES ON: Environment from United States
California Lists BPS On Prop 65
Exponent
On Dec. 29, the California Office of Environmental Health and Hazard Assessment (OEHHA) formally added bisphenol S (BPS) as a reproductive toxicant under the Safe Drinking Water and Toxic Enforcement Act of 1986, commonly known as Prop 65.