UK: FIDIC and BIM

Last Updated: 11 April 2017
Article by Jeremy Glover

One of the reasons FIDIC are amending the 1999 Rainbow Suite is to help ensure that the contracts meet current international best practise. This was no doubt one of the reasons why FIDIC was the primary organiser of the recent Regional Conference: the Road to Smart Infrastructure in Belgrade1.   Indeed, one of the key themes of the conference was the use of Building Information Modelling, better known as BIM.

How is FIDIC likely to address BIM?

Now, there is no mention of BIM in the pre-released second edition of the 2017 Yellow Book. That is not to say that FIDIC has neglected BIM.  Far from it: at least three of FIDIC's committees2 have been asked to consider how best to deal with BIM.  One particular difficulty for FIDIC is that it is an international form of contract. It is designed for use throughout the many different jurisdictions and cultures that the engineering and construction industry operate. There is far from being any uniform or standard approach. This is why any particular amendment to the Rainbow Suite itself is not expected. FIDIC's approach is more likely to be in the form of a Guidance Note or perhaps a Protocol for use with the FIDIC form.

This would be valuable, not least given FIDIC's engineering background. It would also be of assistance because BIM means so many different things to different people and organisations. Not only was this clear from the Belgrade Conference, but it is also something which has been highlighted by King's College, London, who have prepared an excellent BIM Research Report which was published online on 1 July 2016.3

These differences in understanding and the application and use of BIM need to be understood by anyone putting together a project.  The definition of terms, something which is also important on a cross-border project, becomes ever more important with something as new as BIM. Who is the BIM Information Manager? The BIM Co-ordinator? Are they, in fact, one and the same? What do they do?

Remember that BIM is more than simply digital working. The NBS in the UK has said this:

"BIM is an acronym for Building Information Modelling. It describes the means by which everyone can understand a building through the use of a digital model. Modelling an asset in digital form enables those who interact with the building to optimise their actions, resulting in a greater whole life value for the asset ... BIM is a way of working..."4

This is a helpful definition because it brings together the two main features of BIM.  Yes, it is a form of digital tool which will help optimise output, both in terms of working practices as well as the whole life value of the building or asset, but it is also a project management tool. And it is very likely that BIM, alongside other technical advances, will change the way projects are run.  It may change the risk profile of a project. But it will not change what you need to bear in mind when considering that risk profile.

Contract Risk Management

Contract risk management never changes, whether using BIM or not:

  • No matter what contracts, protocols, guidance notes or otherwise are required on a particular project, it is important to understand your obligations, liabilities and limitations within each document;
  • If the contract documents do not align with each other and/or are not considered sufficiently in detail, this can lead to ambiguity and uncertainty;
  • Make sure you understand what you are being asked to do as, depending on the terms of your contract, these could be binding documents with obligations contained therein which you need to understand and be alert to.

The use of BIM may well add some additional levels of responsibility, so check the detail.

BIM has many advantages as a project management tool. The graphics or animation enable the project participants to understand and visualise the scope of the project, right at the outset. This may negate the need for costly changes or variations halfway through as an employer realises they actually wanted something slightly different, or the engineer or contractor comes to understand that there is a more efficient way to design and/or construct the building.  This is an example of one of the likely changes in the way we work: early contractor (and supplier) engagement. It might also be an example of collaboration, parties working together to make the construction process more efficient and so rewarding.

It is important that your contract as a whole contains a clear set of obligations as to how the engineer or contractor will be expected to implement BIM. These obligations do not require any amendment by FIDIC to the main contract form, but it is important to be clear as to when these obligations start.  Ideally, this would be with the project procurement process, but does it also continue into post-completion operations? In the UK, we have the Government Soft Landings Policy or GSL The essential principle behind the government's GSL philosophy is that the ongoing maintenance and operational cost of a building during its lifecycle far outweighs the original capital cost. If this is recognised through early engagement in the design process, then there is greater scope to achieve both savings and increased functionality.

What might FIDIC be thinking about? 

Certainly, it is already clear from the pre-released second edition 2017 Yellow Book that FIDIC is looking to embrace collaborative principles. Dispute avoidance is a clear priority.  The introduction across the Rainbow Suite at sub-clause 8.3 of early warning is another such example. The use of BIM may assist with this, as it may result in parties realising, at an earlier stage in the process, that there might be a problem.

This increased access through BIM to the design of others might affect the common law duty to warn of errors or problems, and parties will need to bear in mind the extent of their potential legal duty to consider those designs.

There are two key related documents that FIDIC will be considering: the use of a Protocol and the BIM Execution Plan. They may also be considering the role of the BIM Information Manager.

The BIM Protocol

Effectively, the BIM Protocol explains who does what, when and how? A protocol should take the following into account:

  • Definitions;
  • Establish priority of the contract documents;
  • Set out the obligations of the Employer;

    • Put a Protocol in place for everyone?
    • Appoint the Information Manager?
  • Clearly define the duties of the BIM Information Manager
  • Establish the obligations of project team members;

    • Produce the specified models as agreed;
  • Provide a framework for collaborative working practice;
  • Electronic Data Exchange: interoperability: making sure the data can talk to each other
  • Mandate use of Information Management standards;
  • Use of models;

    • Who by?
    • Copyright
    • Licences related to permitted purposes
    • Limitations on liability associated with models.

The UK CIC Protocol

In the UK, there is the CIC Protocol. The purpose of the Protocol is to integrate BIM Level 2 with standard form contracts. Essentially, the way it works is to provide a series of supplementary contract documents to be signed by the employer, engineer, contractor, and (ideally)  subcontractors, suppliers and anyone else who will be making design contributions. Of course, if using a protocol (or any other bespoke document which attempts to provide a similar role), it is important to understand what the protocol attempts to do in terms of each party's contractual obligations, liabilities and associated limitations.

The CIC Protocol is designed to take precedence in the event of conflict or discrepancy with any contract (clause 2.2). A FIDIC BIM Protocol ought to do the same. Care must, however, be taken, as there remains a risk that interpreting the wording of the Protocol alongside the contract provisions, in particular standard form contracts which are not amended, will be problematic. Clients/employers should note that clause 3 of the CIC Protocol makes it an absolute obligation on them to secure protocols in substantially the same form from all project team members.

The UK JCT Form of Contract currently tries to deal with this issue in this way in the JCTDB 2016. The contract provides a new entry for the identification of a BIM Protocol, and the BIM Protocol is included within the definition of a Contract Document. Clause 1.3 states that the Conditions shall override any other Contract Document (i.e., the BIM Protocol) and clause 1.4.6 incorporates the BIM Protocol's information (in a form or medium conforming to that protocol) where 'documents' are referred to throughout the contract. The JCTDB 2016 then integrates this defined term, BIM Protocol, throughout the contract.5

The CIC Protocol includes limitations on a project team member's liability. Clause 5 provides that the project team member does not warrant the integrity of electronic data transmission, and clause 6.4 provides the right for a project team member to revoke or suspend a licence to use their models in the event of non-payment. Furthermore, clause 4.1.2 provides that the obligation on project team members to deliver models and comply with Information Requirements is limited to "reasonable endeavours". This duty of care is lower than the more typically accepted "reasonable skill and care". Under the FIDIC form, design obligations are subject to a fitness for purpose obligation.

Indeed, parties to the project should ensure that they understand what effect the use of BIM will have on their specific duties in respect of not just the design, but costing, programming and construction too. Also, given the current widespread variance in knowledge and experience, does everyone understand what level of BIM experience and expertise everyone has, and the level that everyone has agreed to provide?

However, regardless of whether the CIC Protocol or your own bespoke protocol is used, all parties need to understand where obligations and duties of care are either heightened or diluted from the industry norm. In addition, with numerous documents setting out the BIM procedures and standards for the project, parties need to ensure they are aware of their obligations within each document and understand how they all fit together, both in terms of priority as well as process. For example, time and deadlines in terms of model production and otherwise are not dealt with in the CIC Protocol, but are left to the BIM Execution Plans.

BIM Execution Plan

The BIM Execution Plan should provide the detail of who does what and when. This will set out the programme and confirm the applicable standards. It should always be a project specific document.  It should be prepared by lead designer and should, if this detail is not provided for elsewhere, deal with:

  • Model origin, purpose and orientation;
  • File naming convention – make sure everyone uses the same terms and abbreviations;
  • Templates;
  • Authorisation and information approval process;
  • Software versions, file and exchange formats;
  • Electronic Document Management Systems;
  • Who does what, when?

The BIM Execution Plan would not be a part of the sub-clause 8.3 FIDIC programme, but is best viewed as being in addition to but aligned with the Construction Programme and the Design Programme. It was suggested at the Belgrade Conference6 that FIDIC could consider making the agreement of a BIM Execution Plan a pre-condition to commencement under sub-clause 8.1. An interesting idea, which rightly highlights the importance of this document, but one which for the time being is perhaps best left to the parties as a particular condition.

BIM Information Manager

Finally, there is the role of the role of the BIM Information Manager.  Essentially, the BIM Information Manager is there to co-ordinate the use of BIM on a project. They will be:

  • Responsible for preparing and implementing the BIM Execution Plan;
  • Responsible for the model management;
  • Responsible for integration of individual designs (populating the model);
  • Responsible for user access to the BIM Model;
  • Data security;
  • Maintain a data archive;

Usually, the BIM Information Manager has no design responsibility. They are responsible for the management of information, information processes and compliance with agreed procedures, not the coordination of design. If the BIM Information Manager is to have design responsibility then this must be dealt with in the BIM Protocol – otherwise a potential conflict arises as regards to design and design coordination roles.

What is the NEC doing?

The NEC announced at the beginning of March 2017, that they were releasing the new NEC4 on 22 June 2017. This deals with BIM in another way.  Their new contract will includes a new secondary option specifically to support the use of BIM. This, the NEC have said will provide "the additional contract clauses required to support the production of information for BIM." As well as dealing with issues such as the Model, ownership and liability, under the new BIM option, the Contractor will be required to an Information Execution Plan either for incorporation in the contract from the outset, or within a period defined by the Client.

Conclusion

There are other issues which FIDIC and others may need to consider, but the key is establishing how the use of BIM can sit alongside the FIDIC form of contract.  As noted at the outset, FIDIC's approach is more likely to be in the form of a Guidance Note or perhaps a Protocol for use with the FIDIC form. This would have the advantage of being capable of adaption to suit the environment of the particular project in question.

But whatever FIDIC do, it is important not to be seduced by the technological advances BIM is capable of.  BIM is only as good as the people who use it.  BIM can certainly offer successful design, procurement delivery and operation of projects, but this is only provided the project team work together. This is why it was once said by Dale Sinclair7 that BIM should actually be known as BIM(M): BIM(M) Building Information Modelling and Management.  There is considerable sense in that.


  • 1. Organised jointly by FIDIC, ACES and EFCA, 9-10 March 2017.
  • 2. Contracts, Capacity Building and Business Practice
  • 3. This is a valuable source of information for anyone interested in reading more about the adoption of BIM.   http://www.kcl.ac.uk/law/research/centres/construction/about.aspx 
  • 4. www.nbs.com.  The NBS website is an excellent research tool.
  • 5. In terms of any discrepancies, the JCTDB 2016 Guide states that the "JCT considers that its contracts give sufficient latitude to BIM Protocols so that a conflict should not arise; in any event, it also considers that unqualified overriding provisions of this type are not appropriate in such protocols". Time will tell if this is an issue.
  • 6. By Roger Ribeiro
  • 7.  Introduction to the RIBA BIM Overlay: http://www.ribabookshops.com/uploads/b1e09aa7-c021-e684-a548-b3091db16d03.pdf [Accessed 16 March 2017]

International Quarterly is produced quartely by Fenwick Elliott LLP, the leading specialist construction law firm in the UK, working with clients in the building, engineering and energy sectors throughout the world.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Jeremy Glover
 
In association with
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Check to state you have read and
agree to our Terms and Conditions

Terms & Conditions and Privacy Statement

Mondaq.com (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

Use of www.mondaq.com

You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about Mondaq.com’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.

Disclaimer

Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.

Registration

Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.

Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

If you do not want us to provide your name and email address you may opt out by clicking here .

If you do not wish to receive any future announcements of products and services offered by Mondaq by clicking here .

Information Collection and Use

We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to unsubscribe@mondaq.com with “no disclosure” in the subject heading

Mondaq News Alerts

In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.

Cookies

A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

Log Files

We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.

Links

This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

Surveys & Contests

From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.

Mail-A-Friend

If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.

Security

This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to webmaster@mondaq.com.

Correcting/Updating Personal Information

If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to EditorialAdvisor@mondaq.com.

Notification of Changes

If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

How to contact Mondaq

You can contact us with comments or queries at enquiries@mondaq.com.

If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at problems@mondaq.com and we will use commercially reasonable efforts to determine and correct the problem promptly.