A case study of Goh Eng Lee Andy v Yeo Jin Kow [2016] SGHC 110

Overview

Is a lump sum contract a feature of a "design and build" contract? This was the central issue that the High Court had to decide in the recent case of Goh Eng Lee Andy v Yeo Jin Kow [2016] SGHC 110. After examining the features and reasons behind "design and build" contracts, Judicial Commissioner (JC) Kannan Ramesh unequivocally held that a "design and build" contract, in the absence of any terms to the contrary, necessarily incorporates a lump sum contract.

This case is noteworthy to both construction professionals and stakeholders in the building and construction industry as it illustrates the legal consequences of using the term "design and build" in a building contract and demonstrates the importance of having formal documentation in a commercial relationship.

Background

Goh (plaintiff) wanted to build a new house on a piece of land which he had purchased with his wife. He approached his friend Yeo (defendant), a building contractor, for this purpose. The defendant provided three quotations in total for the construction work, the last of which contained the term "design and build" in an acknowledgement section. The plaintiff accepted this last quotation, but refrained from executing it until the construction drawings were finalised. In this regard, the construction drawings were prepared by TAS Design Studio (TAS), an architectural firm engaged by the defendant, in collaboration with JAL Atelier (JAL). JAL was retained by TAS as the project architect. The total contract price for the second quotation was S$841,300 while the total contract price for the last quotation was S$934,500.

The salient terms and conditions in the last quotation were as follows:

"Terms and conditions:-

1.) All construction price including workmen com. Site coordinator, site safety supervisor & technical controller.

2.) [Resident Technical Officer] to be engage[d] by developer owner.

3.) If there are substantial design changes after the completion of design and/or during construction, additional fees shall be chargeable and decided on a case by case basis.

...

7.) Any other works not mentioned in this contract shall not be included and fee involved shall be borne by client."

Work then commenced on the project in March 2012 and it was stated that the "estimated completion date" was March 2013. About 17 months later, in September 2013, the plaintiff took the view that the defendant had abandoned construction and, by a notice dated 11 October 2013, terminated the contract. Thereafter, the plaintiff appointed replacement contractors who completed the construction work.

The plaintiff then sued the defendant for breach of contract and the defendant counterclaimed for the cost of variation works supposedly undertaken by him. As the counterclaim was bifurcated, JC Kannan only had to address the issue of liability in this case.

The plaintiff's arguments

In support of his case, the plaintiff made the following arguments:

  1. The contract was both a "design and build" contract as well as a lump sum contract which the defendant agreed to undertake for the sum of S$934,500;
  2. There was no basis for the defendant's counterclaim for design services as additional or variation works carried out;
  3. The delay in the completion of the works was solely attributable to the defendant;
  4. The defendant's abandonment of the works entitled the plaintiff to terminate the contract.

The defendant's arguments

In response, the defendant made the following arguments:

  1. The contract was not a "design and build" contract;
  2. The defendant had to undertake substantial variation works which caused the time for completion of the contract to be set at large;
  3. The plaintiff had not made prompt payment, which contributed to the delay in the completion of the works;
  4. There was no abandonment or repudiation of the contract and therefore the plaintiff's termination of the contract was wrongful.

"Design and build" contracts

JC Kannan then examined the salient features of "design and build" contracts.

A "design and build" contract is a contract where the functions of design and construction are integrated and entrusted primarily to the contractor. The essential feature of such a contract is that the employer does not employ his or her own professional advisers to produce the complete or final design of the building or project which he or she requires.

In "design and build" contracts, since the contractor is in charge of both the design and the construction of the project, this may make the design and construction process more efficient, which generates costs savings. Also, as the contractor is the only point of contact for the delivery of the project, this creates convenience and accountability.

As the main dispute between the parties centred on whether the contract was a "design and build" contract as well as a lump sum contract, JC Kannan had the opportunity to examine the relationship between "design and build" contracts and lump sum contracts. In doing so, he made the following observations:

  1. A lump sum contract is a contract to complete a whole work for a lump sum;
  2. Both "design and build" contracts and lump sum contracts share the common feature that the contractor has to do all that is necessary to achieve the contractual scope of the works without an adjustment in price;
  3. However, "design and build" contracts have the additional feature that the contractor is also responsible for formulating and implementing the design of the project and engaging professionals for this purpose;
  4. Therefore, a "design and build" contract, in the absence of any terms to the contrary, necessarily incorporates a lump sum contract and is a subset of lump sum contracts.

JC Kannan concluded his observations by stating the following:

"In short, by entering into a "design and build" contract without more, the owner and the contractor have agreed on a lump sum payment by the former in return for the construction and delivery of a project by the latter that is in accordance with an agreed design which has been formulated by the contractor."

In light of the features of a "design and build" contract, and the relationship between "design and build" contracts and lump sum contracts, JC Kannan held that the implications of finding that the contract between the plaintiff and the defendant was a "design and build" contract were that:

  1. The defendant had no basis to counterclaim for professional fees where these fees concerned the design of the property, unless this was specially provided for;
  2. The defendant cannot claim for additional payment for variation work unless such work was extraneous to the work contemplated under the contract.

Was the contract a "design and build" contract?

Turning to the question of whether the contract between the parties was indeed a "design and build" contract, JC Kannan explained that this was a matter of contractual interpretation. He added that in interpreting the contract, the court will adopt a contextual approach and consider all of the objective evidence.

Importantly, JC Kannan explained that the term "design and build" is a legal term of art carrying a defined meaning in law. Thus, the inclusion of such a term in the contract is prima facie evidence that the parties intended to, and did enter into, a contract having the relevant rights and obligations under a "design and build" contract.

On the facts, JC Kannan held that the parties intended to, and did enter into, a "design and build" contract.

He provided the following reasons:

  1. The term "design and build" was expressly referred to in the last quotation, which establishes the prima facie position that the parties intended a "design and build" contract;
  2. The plaintiff deliberately refrained from accepting the last quotation until he was satisfied with the construction drawings, which showed that he intended to enter into a contract where both design and construction were handled by the contractor;
  3. The defendant entered into a contract directly with TAS and this contract stated that the defendant would be responsible for all direct coordination with the plaintiff, which was consistent with the defendant being the sole point of contact, a key feature of "design and build" contracts;
  4. The defendant dealt with other professionals such as structural consultants and soil investigators in preparing to execute the design and construction of the property, even agreeing that the plaintiff would not have recourse for defective work against them. This was a hallmark of a "design and build" contract;
  5. The prices for the individual items in the last quotation such as the construction of the swimming pool and the lift were marked-up when compared to the second quotation, which suggested that the parties had taken into account the defendant's responsibility as a "design and build" contractor.

Breach of the contract

Having established that the contract was a "design and build" contract, JC Kannan held that the defendant had breached the contract by failing to complete the works by 31 March 2013 notwithstanding that this date was stated in the last quotation to be a mere "estimated completion date". This was because the evidence showed that both the plaintiff and the defendant had intended for 31 March 2013 to be the completion date for the construction works. One of the progress claims stated that the completion date was March 2013, and the defendant had also arranged for, inter alia, insurance, noise monitoring and pest control on the basis that the works would be completed by March 2013.

JC Kannan added that even if the parties did not intend for 31 March 2013 to be the exact completion date, the term "estimated" would have given the defendant leeway for at most a 6- to 7-month delay, given that the contract period itself was only 12 months long. Since the works were not completed even by September 2013, the defendant was clearly in breach of the contract.

Although the defendant had argued both that the time for completion was set at large because of the variation works which he had to carry out and that the plaintiff had breached the contract by failing to make timeous payments, JC Kannan rejected these arguments easily as they were premised on the contract not being of the "design and build" variety. Since the JC had earlier found that the contract was a "design and build" contract, there was simply no basis for these arguments. In any case, the evidence showed that no variation works were carried out and that the plaintiff had made prompt payment.

Finally, JC Kannan examined the evidence, which showed that the defendant was principally responsible for the delay in the completion of the construction, and that he had abandoned the works in October 2013. The JC then held that this abandonment was a clear repudiation of the contract, which entitled the plaintiff to validly terminate the defendant's services.

Defendant's counterclaims

With regard to the defendant's counterclaims, JC Kannan held that:

  1. The defendant could not claim for additional payment for variation work as none of these counterclaims for variation work were extraneous to, or deviated from, the work contemplated under the "design and build" contract;
  2. The defendant could not claim for "profit and attendance" fees as such fees were part of the contract price in a "design and build" contract;
  3. The defendant could not claim for his expenses in travelling to China to secure construction materials as this was part of his responsibility under a "design and build" contract;
  4. The defendant was allowed to claim for the installation of a gate at the plaintiff sister's house since this work did not fall within the scope of the contract.

Quantification of damages

Having dealt with the liability of the defendant and his counterclaims, JC Kannan moved on to the quantification of contractual damages. He reiterated the following basic principles:

  1. Contractual damages are generally intended to place the party who sustained the loss in the same situation as if the contract had been performed;
  2. An innocent party to a breach of contract is required in law to mitigate his losses;
  3. The burden of proof is on the defaulting party to show that the innocent party failed to mitigate and this burden is an onerous one;
  4. The defaulting party must specifically plead that the innocent party had failed to mitigate.

He then allowed the plaintiff's claims for the costs of paying the replacement contractors, the cost of storing the construction materials, and the cost of renting accommodation after the intended completion date. However, the JC did not allow the plaintiff to claim for the cost of appointing an independent quantity surveyor since the surveyor's report did not play a role in the formulation of the scope of works for the replacement contractors.

Conclusion

The writer notes that the essence of the dispute was whether the defendant could claim extra payment for providing design services. It was not in dispute that the design was provided by the defendant (or more accurately, design professionals who had been engaged by the defendant). Therefore, in truth, there was no disagreement that the contract in this case was ultimately a "design and build contract". The dispute was whether the contract price agreed by the parties initially was for both design and construction or just for construction (such that design services could be claimed as a variation). The defendant sought to say it was excluded because the makeup of the prices in the final quotation that was accepted by the plaintiff did not specify design services (in contrast to an earlier quotation which did). However, the use of the phrase "design and build" in the final quotation was a key factor which persuaded the court to find that the contract price included provision of design services.

The High Court's decision is welcomed as it provides clarity on "design and build" contracts. This decision is probably the clearest statement by the Singapore courts on what "design and build" contracts are where hitherto, lawyers had to resort to textbook definitions and descriptions. The term "design and build" has been clearly recognised as a legal term of art carrying a defined meaning in law. In turn, this meant that certain consequences would flow if the term "design and build" were included in a contract. The inclusion of such a term in a building contract would establish a prima facie position that the parties intended a contract which required the contractor to provide both design and construction services for a fixed price.

The author acknowledges and thanks Ng Jun Chong for his contribution in the writing of this article.

About Dentons

Dentons is the world's first polycentric global law firm. A top 20 firm on the Acritas 2015 Global Elite Brand Index, the Firm is committed to challenging the status quo in delivering consistent and uncompromising quality and value in new and inventive ways. Driven to provide clients a competitive edge, and connected to the communities where its clients want to do business, Dentons knows that understanding local cultures is crucial to successfully completing a deal, resolving a dispute or solving a business challenge. Now the world's largest law firm, Dentons' global team builds agile, tailored solutions to meet the local, national and global needs of private and public clients of any size in more than 125 locations serving 50-plus countries. www.dentons.com.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Events from this Firm
23 Aug 2017, Seminar, Singapore, Singapore

Collective Sales, or what is popularly known as Enbloc Sales, is making a strong comeback in the property market in Singapore with ten significant collective sale deals inked in the past 12 months.

25 Aug 2017, Seminar, New York, United States

Join us as Senior Partner Lee Liat Yeang shares on his experience in this area of real estate practice, and discusses the legal pitfalls and experiences in recent cases.

13 Sep 2017, Workshop, New York, United States

Your innovative product is gaining market share. Established players are starting to take notice. Access to capital is key to accelerating your business forward and pulling away from the competition.

 
Some comments from our readers…
“The articles are extremely timely and highly applicable”
“I often find critical information not available elsewhere”
“As in-house counsel, Mondaq’s service is of great value”

Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Check to state you have read and
agree to our Terms and Conditions

Terms & Conditions and Privacy Statement

Mondaq.com (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

Use of www.mondaq.com

You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about Mondaq.com’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.

Disclaimer

Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.

Registration

Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.

Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

If you do not want us to provide your name and email address you may opt out by clicking here .

If you do not wish to receive any future announcements of products and services offered by Mondaq by clicking here .

Information Collection and Use

We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to unsubscribe@mondaq.com with “no disclosure” in the subject heading

Mondaq News Alerts

In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.

Cookies

A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

Log Files

We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.

Links

This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

Surveys & Contests

From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.

Mail-A-Friend

If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.

Security

This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to webmaster@mondaq.com.

Correcting/Updating Personal Information

If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to EditorialAdvisor@mondaq.com.

Notification of Changes

If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

How to contact Mondaq

You can contact us with comments or queries at enquiries@mondaq.com.

If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at problems@mondaq.com and we will use commercially reasonable efforts to determine and correct the problem promptly.