United States: D.C. Circuit Vacates And Remands FERC Approval Of Southeast Market Pipelines Project

Last Updated: September 1 2017
Article by Mark R. Haskell, Lamiya Rahman and Brett Snyder

Most Read Contributor in United States, August 2018

On Tuesday, August 22, 2017, the U.S. Court of Appeals for the District of Columbia Circuit vacated and remanded an order by the Federal Energy Regulatory Commission (“FERC”) authorizing the construction and operation of the Southeast Market Pipelines Project (the “Certificate Order”).1  Although the court rejected several of the claims raised by environmental and landowner groups seeking judicial review of the Certificate Order, a divided panel held that FERC’s environmental review of the project failed to adequately consider the downstream effects of greenhouse gas emissions resulting from increased power generation.  In reaching this conclusion, the court distinguished this case from three 2016 D.C. Circuit decisions upholding FERC’s National Environmental Policy Act (“NEPA”) review of liquefied natural gas (“LNG”) facilities2—finding that whereas FERC is not the “legally relevant cause” and thus not required to review the indirect effects of increased natural gas exports, FERC is required to evaluate the indirect effects of increased power generation served by an interstate natural gas pipeline, at least when the pipeline has stated that power generation is one of the primary purposes of the project.  The D.C. Circuit vacated the Certificate Order and directed FERC on remand to prepare an Environmental Impact Statement (“EIS”) consistent with the court’s decision.  Judge Brown filed a partial dissent, agreeing with the court’s decision in all aspects except for its findings with respect to FERC’s review of greenhouse gas emissions.

The Southeast Market Pipelines Project involves three separate interstate natural gas pipelines currently being constructed in Alabama, Georgia, and Florida.  Although the pipelines have different owners, the project’s overall aim is to serve the growing natural gas demand of Florida’s power plants.  As the court’s decision points out, the two major natural gas pipelines already serving the state are nearly at capacity, and Florida utilities require the additional natural gas provided by the project to generate enough power to meet electricity demands.  FERC treated the three pipelines as one project for purposes of its review under the NEPA and Natural Gas Act (“NGA”), preparing a single EIS and issuing the Certificate Order for all three pipelines on February 2, 2016.

Two sets of challenges were filed against the project with the D.C. Circuit: (1) Environmental groups Sierra Club, Flint Riverkeeper, and Chattahoochee Riverkeeper (collectively, “Sierra Club”) filed a petition for review in Case No. 16-1329, which the court granted in part; and (2) landowners filed petitions in Case No. 16-1387, which the court denied.

Environmental Arguments

Both Sierra Club and the landowners raised several challenges to FERC’s NEPA review.  The court upheld FERC’s EIS against each of these claims, except for the greenhouse gas issue.

Environmental Justice Review

Sierra Club’s first challenge was that, for various reasons, FERC’s review of the project’s effects on low-income and minority populations (“environmental justice communities”) was insufficient.  As a preliminary matter, the court explained, NEPA requires an agency to adequately consider and publicly disclose the environmental impact of its actions, but does not direct an agency to reach any particular result.  Accordingly, FERC was required to take the requisite “hard look” at environmental justice issues but was “not required to select the course of action that best serves environmental justice.”3  The court upheld the sufficiency of FERC’s environmental justice review, finding the EIS indicated that 83.7% of the proposed route would cross through or near environmental justice communities, and that FERC evaluated various alternatives, identified relevant environmental justice communities, and adequately considered cumulative impacts.  The court further noted that FERC took commenters’ concerns on this issue seriously, reopening the comment period for the EIS to seek additional input and eventually securing agreement from the applicant to relocate a portion of the project to mitigate effects on environmental justice communities.   

Greenhouse Gas Emissions

Next, Sierra Club argued, and the court agreed, that the EIS inadequately considered the indirect effects of downstream greenhouse gas emissions.  According to the court, it is “reasonably foreseeable” that the gas transported via the project will be burned in power plants, and that the burning natural gas will in turn release greenhouse gases that will affect climate change.  NEPA obligates an agency to consider effects that are “reasonably foreseeable,” but this obligation does not apply where the agency is not the “legally relevant cause” of such effects. 

Here, the court’s analysis turned on its interpretation of the Supreme Court’s decision in Department of Transportation v. Public Citizen.4  Public Citizen held that NEPA does not require an agency to evaluate the environmental impacts where that agency does not have the authority to prevent the cause of injury.  In last year’s LNG decisions, the D.C. Circuit relied on Public Citizen in deciding that FERC is not the “legally relevant cause” of any indirect effects of increased natural gas exports—and consequently is not required to consider such effects in its NEPA review—because the Department of Energy (“DOE”) is the agency with authority to approve natural gas exports.5  The August 22 decision distinguished the LNG cases, and the scope of FERC’s environmental review thereunder, from FERC’s NEPA obligations in this case.  In the court’s words:

Our holding in the LNG cases was not based solely on the fact that a second agency’s approval was necessary before the environmental effect at issue could occur.  Rather [the cases] rested on the premise that FERC had no legal authority to prevent the adverse environmental effects of natural gas exports. . . . The holding in [the LNG cases] turned, not on the question “What activities does FERC regulate?” but instead on the question “What factors can FERC consider when regulating in its proper sphere?6

Thus the court contrasted the limited scope of what FERC may consider under DOE’s “narrow delegation” of authority versus FERC’s broader statutory authority to determine whether applications to construct and operate pipelines are in the public convenience and necessity under NGA section 7.  In the LNG context, the court maintained, FERC was not statutorily authorized to evaluate the effects of natural gas exports when considering an application to construct and operate a facility.  On the other hand, the court continued, FERC does have the authority to deny a pipeline certificate based on its potential environmental harm under NGA section 7; therefore FERC is the “legally relevant cause” of the direct and indirect environmental effects of approved pipelines, such as downstream greenhouse gas emissions.  Accordingly, the court found FERC was required to analyze the indirect and cumulative effects of greenhouse gas emissions in the EIS.

Next, the court addressed FERC’s assertion that it is impossible to know the exact quantity of greenhouse gases that would result from the project’s approval.  Because NEPA requires agencies to engage in “reasonable forecasting,” the court concluded that FERC should have either provided a quantitative estimate of downstream greenhouse gas emissions in the EIS or given a specific explanation as to why it could not do so.  According to the court, such an estimate or explanation is required notwithstanding that greenhouse gas emissions may be somewhat offset due to the pipeline project itself (e.g., due to the retirement of coal-fired plants), and notwithstanding that the emitting power plants are subject to state and federal air permitting processes.

Landowner NEPA Challenges

The Landowner petitioners attacked two aspects of the EIS.  First, they argued that FERC erroneously limited the scope of its evaluation of alternatives.  The court upheld FERC’s evaluation of alternatives, noting that FERC considered twelve major route alternatives (including a no-action alternative).  The court also noted that the Landowners failed to provide arguments to support their claim or give examples of alternatives FERC failed to consider.  Second, the Landowners assert that FERC inadequately considered safety risks with respect to the pipeline’s construction.  The court disagreed, finding FERC took the requisite “hard look” by evaluating the risk of pipeline crossings and responding to commenters’ safety concerns in its EIS.

Non-Environmental Arguments

Landowners also challenged FERC’s evaluation of a need for the project under its NGA section 7 review, arguing that the project merely serves the profit motives of the applicants and fails to satisfy a public need.  Pointing out that petitioners misconstrued the relevant standard that the project meet a “market need,” the court found that the requirement had been met by a showing that 93% of the project’s capacity has been subscribed.

Finally, Landowners argued that FERC violated the Sunshine Act by issuing the Certificate Order by notational vote rather than in a public meeting.  The court disagreed, noting the Sunshine Act does not require agencies to conduct business via meetings, but rather requires that if such meetings are held that they be open to the public.

Judge Brown’s Partial Dissent

Judge Brown concurred in part and dissented in part, agreeing with the decision in all respects except for the court’s findings related to greenhouse gas emissions and its vacatur and remand of the Certificate Order.  Judge Brown disagreed with the court’s analysis of Public Citizen, arguing that “when the occurrence of an indirect environmental effect is contingent upon the issuance of a license from a separate agency, the agency under review is not required to address those indirect effects in its NEPA analysis.”7  Judge Brown found the issues in the instant case “virtually identical” to those in the LNG decisions: Just as FERC cannot control the effects of increased exports because exports are approved by DOE, FERC cannot control the effects of greenhouse gases emitted by power plants because the construction and operation of power plants are regulated by state authorities.  According to Judge Brown, this “breaks the chain of causation,” such that FERC is not required to consider greenhouse gas emissions caused by power plants in its NEPA review.  In response to the court’s distinction between the statutory authority afforded FERC under NGA section 3 versus NGA section 7, Judge Brown noted that “nothing in the text of either statute empowers the Commission to entirely deny the construction of an export terminal or the issuance of a certificate based solely on an adverse indirect environmental effect regulated by another agency.”8  Moreover, she noted, even if FERC did have the authority to deny a project based on such concerns, its denial would prevent neither the state’s ability to approve construction or expansion of the relevant power plants nor the attendant downstream greenhouse gas emissions

In the absence of rehearing en banc, FERC will need to address the issues identified by the panel majority on remand.  As the D.C. Circuit has held, NEPA does not mandate particular results; NEPA prescribes a necessary process.  Nothing in the majority opinion prevents FERC on remand from determining that the proposed projects remain in the public interest, once the additional elements identified by the majority are identified and addressed.

Footnotes

1   See Sierra Club v. FERC, Case No. 16-1329 (D.C. Cir. Aug. 22, 2017).

2   See Sierra Club v. FERC, 827 F.3d 36 (D.C. Cir. 2016); Sierra Club v. FERC, 827 F.3d 59 (D.C. Cir. 2016); EarthReports v. FERC, 828 F.3d 949 (D.C. Cir. 2016).

3   Sierra Club v. FERC, Case No. 16-1329, slip. op at 13.

4   Department of Transportation v. Public Citizen, 541 U.S. 752 (2004).

5   Under section 3 of the NGA, DOE has the authority to approve exports of natural gas, including LNG.  Under delegated authority from the DOE, FERC authorizes the construction, siting, and operation of LNG facilities.

6   Sierra Club v. FERC, Case No. 16-1329, slip. op at 22 (emphasis added).

7   Sierra Club v. FERC, Case No. 16-1329, slip. op at 36.

8   Id. at 40.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Similar Articles
Relevancy Powered by MondaqAI
 
In association with
Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Related Articles
 
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions