United States: EPA Publishes Proposed Benchmarks For Revised District Of Columbia MS4 Permit

Amy L. Edwards is a partner and Aaron S. Heishman is an attorney in Holland & Knight's Washington D.C. office

HIGHLIGHTS:

  • The U.S. Environmental Protection Agency (EPA) published a Notice of Intent to Reissue the District of Columbia's municipal separate storm sewer system (MS4) permit.
  • EPA's proposed permit retains many of the provisions of the District's 2011 permit, but also proposes a number of new enforceable milestones and adaptive management benchmarks.
  • The District's development community is encouraged to comment on EPA's proposed permit during the 45-day public comment period that will end on Jan. 2, 2017.

The U.S. Environmental Protection Agency (EPA) published on Nov. 17, 2016, a Notice of Intent to Reissue the District of Columbia's municipal separate storm sewer system (MS4) permit. The notice triggers a 45-day public comment period that will end on Jan. 2, 2017.

EPA acknowledges that the District has a solid foundation of green infrastructure, an innovative Stormwater Retention Credit (SRC) system and some of the most effective on-site stormwater retention regulations in the country. Nevertheless, EPA proposes to add numerous enforceable stormwater milestones and adaptive management benchmarks to the District's MS4 permit, many of which will make new development efforts in the District more complex and costly.

Key Components

EPA's proposed MS4 permit would require the District to do the following:

  • perform a cost-benefit analysis of increasing the on-site stormwater retention standard from 1.2 inches to 2 inches
  • manage 1,038 acres on which stormwater control measures are implemented and ensure that 350,000 square feet of green roofs are installed by 2021
  • evaluate options to increase the District's Stormwater Fee to fund projects to improve water quality
  • optimize stormwater management procedures at small projects over the next two years in order to eliminate the stormwater management exemption for small projects

Background

EPA's proposed MS4 permit will replace the District's 2011 permit, which was modified in 2012 and was scheduled to expire on Oct. 7, 2016. The proposed permit retains many of the provisions of the 2011 permit, but also proposes a number of new enforceable milestones and adaptive management benchmarks. The new permit requirements are discussed below.

New Discharge Limits

Section 1.5 of the proposed permit sets new discharge limits for the District's MS4 system. The permit would require the District to remove 103,188 pounds of trash from the Anacostia River Basin annually. For additional pollutants of concern, the permit proposes to use the number of acres that are subject to stormwater management controls as a compliance metric. By 2021, the permit would require the District to manage 1,038 acres, a 250 percent increase from the 2011 permit. Of these 1,038 acres, at least 46 must consist of retrofitted Public Right-of-Way (PROW) areas, a 33 percent increase from the 2011 permit.

Stormwater Management Program Implementation

EPA's proposed MS4 permit includes the following new requirements for implementing the District's stormwater control measures:

  • Limit SRCs for Older Development Projects: Stormwater retention projects installed before July 2013 will only be eligible to generate SRCs if the project submits an application within six months after the effective date of the reissued MS4 permit.
  • Establish SRC Purchase Agreement Program: The District shall commit $12.75 million to establish a SRC purchase agreement program and to provide technical support to identify sites with potential to generate SRCs. All SRCs purchased by the District would be retired to achieve additional benefit to District water bodies.
  • Increase Green Roof Construction: The District shall ensure that at least 350,000 square feet of new green roofs are installed by 2021.
  • Increase Tree Canopy: The District shall achieve a net annual tree planting rate of 8,000 plantings in pursuit of an urban tree canopy coverage rate of 40 percent by 2032.
  • Implement Stormwater Pollution Prevention Plans (SWPPPs) at District Facilities: The District shall ensure that SWPPPs are implemented at all of its facilities and properties where industrial activities occur.
  • Implement Storm Drain Outfall Operation and Maintenance: The District must annually repair 10 percent of damaged storm drain outfalls or substitute outfall repairs with more beneficial stream restoration projects.
  • Implement Street Sweeping Program: The District shall street sweep 44,000 miles of road annually.

Stormwater Management Program Planning

The District's 2011 permit required the development of a Consolidated Total Maximum Daily Load (TMDL) Implementation Plan as a long-term road map for addressing water quality impairments related to the MS4. The District's TMDL Implementation Plan, released in August 2016, does not anticipate achieving full compliance with all wasteload allocations (WLAs) until 2154. Accordingly, EPA proposes to insert the following requirements into the District's MS4 permit in an effort to bring about swifter improvements in water quality:

  • Create Schedule for Updating TMDLs: During the first year of the permit, the District shall create a schedule for revising TMDLs that are based on old or limited data.
  • Evaluate Stormwater Fee Options: The District shall evaluate options over the next three years to increase the Stormwater Fee to fund projects to achieve WLAs.
  • Analyze Increase to On-Site Stormwater Retention Standard: The District shall conduct a cost-benefit analysis over the next three years on the effect of increasing the on-site stormwater retention standard from 1.2 inches to 2 inches or applying a stricter standard in target watersheds.
  • Study Sources of E. coli in MS4: The sources of E. coli in the District's MS4 are largely unknown. The District shall study the sources of E. coli and use that information to develop more aggressive milestones for achieving the E. coli WLA.
  • Minimize Legacy Pollutants: The District shall confirm that legacy pollutants such as DDT and PCBs are no longer being discharged through the MS4 and develop a plan to address any legacy pollutants that still adversely impact water quality, including potential sediment remediation measures.
  • Eliminate Stormwater Exemptions for Small Projects: The District shall optimize stormwater management procedures at small projects over the next two years to eliminate the exemption of small projects from stormwater management requirements.
  • Optimize Stormwater Design for PROWs: To enable the District to have 46 acres of retrofitted PROWs subject to stormwater management controls by 2021, the District shall develop optimal stormwater designs for categories of PROWs over the next four years.
  • Evaluate Pollutant Reductions From Catch Basin Cleaning: The District shall develop a method for calculating pollutant reductions from routine catch basin cleaning.
  • Incorporate Water Quality Elements Into Snow Response Plan: The District shall evaluate its use of anti-icers, chemical deicers, salt and sand, and make efforts to minimize the impact of these substances on water quality.
  • Incorporate Flood and Climate Management Assessments Into Stormwater Management: The District shall review all floodplain development to ensure that it is reasonably protected from flooding, does not reduce flood storage and does not impact water quality. The District shall also use estimates of future climate conditions when evaluating the need for revised stormwater management standards.

Water Quality Assessment

The 2011 MS4 permit required the District to develop a new water quality assessment strategy. EPA has reviewed and approved the District's Revised Monitoring Program and incorporated it into the draft MS4 permit. Accordingly, the permit requires the District to 1) conduct wet weather monitoring of key pollutants of concern, 2) assess the MS4's receiving waters via evaluations of water quality, habitat, macroinvertebrates and geomorphology, and 3) conduct trash monitoring in the Rock Creek, Anacostia River and Potomac River watersheds.

Reporting Requirements

The proposed permit requires the District to create annual reports that track its progress toward meeting the permit's numeric milestones and to publish those annual reports, as well as other stormwater management program documents, on the District's website.

It is important that the development community weigh in on these proposed changes by Jan. 2, 2017. Contact the authors for assistance in making your views known to EPA.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
In association with
Related Topics
 
Related Articles
 
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions