On June 21, 2016, the Federal Aviation Administration ("FAA") released Part 107 of the Federal Aviation Regulations that, for the first time, provide standards for general operation and certification of drones or small unmanned aircraft systems ("sUAS"). The new Part 107 was published in the Federal Register on June 28, 20161 and is effective on August 29, 2016. It is significantly more accommodating of the commercial considerations associated with sUAS operations than previously indicated in the FAA's notice of proposed rulemaking ("NPRM") or previously allowed under the FAA's Section 333 Exemption regime.

One of the most significant improvements is that operations under Part 107 can cover a broader geographic area in one flight. Although operations must remain within the controlling pilot's visual line of sight ("VLOS"), control of the aircraft can be transferred between pilots mid-flight, and a controlling pilot can operate from a moving vehicle or vessel in sparsely populated areas. Additionally, operations can be conducted up to 400 feet above ground level ("AGL"), and higher if operating within 400 feet of a structure.

Although some remaining limitations inhibit maximum commercial operations, the FAA contemplates a system to allow waivers from those limitations. Two of the key limitations are: (i) limiting operations to "fair weather flying" by requiring three miles of visibility and significant clearance from clouds, both laterally and horizontally; and (ii) no night operations. However, an operator can seek a waiver of these rules by demonstrating that the contemplated operations can be conducted safely under the terms of the waiver. Also, the FAA has indicated that it intends to relax the new rules further with additional safety improvements and demonstrations.

This Commentary analyzes these key issues and provides insights into how they will affect commercial operations, particularly in the transportation and energy industries. Additionally, it explores the impact of Part 107 on existing operations under Section 333 Exemptions. Finally, it lists several additional noteworthy Part 107 requirements.

The Basics

General Requirements for Operation. Part 107 contemplates three potential types of personnel, or crewmembers, involved in sUAS operations: a Remote Pilot in Command ("Remote Pilot"), a person manipulating the flight controls, and a visual observer ("Observer").2 All sUAS flights must have a designated Remote Pilot.3 The Remote Pilot is responsible for a number of aspects of the sUAS flight and operation. However, the Remote Pilot does not have to be the person manipulating the flight controls (although often he or she will be) and can instead supervise that individual. Each Remote Pilot may conduct or supervise only one sUAS operation at a time. The Observer is a separate individual who can assist the Remote Pilot in surveying the unmanned aircraft and the surrounding environment.4 The use of an Observer is optional, and Observer responsibilities may be handed off between multiple people. The Observer and Remote Pilot are allowed to communicate by means of a cell phone or radio transmitter.5 This allows the Observer to be geographically distant from the Remote Pilot and flight controller.

The Remote Pilot, the person manipulating the flight controls, and the Observer must be able to see the unmanned aircraft with unaided vision throughout the duration of the flight (maintain VLOS). Although all crewmembers must have the capability to see the sUAS at all times,6 only the Observer or the Remote Pilot and the flight controller are actually required to: (i) determine the unmanned aircraft's location, attitude, altitude, and direction of flight; (ii) observe the airspace for other air traffic; and (iii) determine that the unmanned aircraft does not endanger the life or property of another.7 In other words, if an Observer can see the sUAS as required, then the Remote Pilot and person manipulating the flight controls are required merely to keep the unmanned aircraft within their general field of view. Since the Observer may exercise the VLOS capability instead of the Remote Pilot and flight controller, the pilot can use First Person Viewer technology during flight to better conduct a particular surveillance activity. Such a device allows the sUAS operator to observe the flight virtually from the perspective of the unmanned aircraft.

Licensing Requirements. Under the Final Rule, Remote Pilots must possess a Remote Pilot certificate. A valid pilot license will no longer be sufficient. Observers and the person at the controls, if not the Remote Pilot, are not required to possess a pilot certificate of any kind.

In order to receive a Remote Pilot certificate, an applicant with no prior pilot certificate must take an initial aeronautical knowledge test designed for sUAS operations. This test must be taken at an FAA-approved testing center, and the applicant's identity will be verified at that time. Upon receiving a passing score, the applicant will apply for the certificate online and will be assessed by the Transportation Security Administration ("TSA") as a possible security risk. The applicant will also certify that he does not have a physical or medical condition that would interfere with the safe operation of the sUAS. The FAA anticipates that the TSA vetting will be completed within 10 days, although there could be delays depending on the number of applicants. Once TSA approval has been received, the FAA will issue a temporary pilot certificate that is valid for 120 days. This will allow sufficient time for processing the official certificate. The certificate does not expire but requires recurrent training every 24 months to remain active.

Pilots (other than student pilots) with a current flight review have the option of either taking the initial knowledge test or taking an online training program. If taking the knowledge test, the pilot follows the same steps as outlined above, but the 10-day TSA waiting period will not apply since the individual has already been vetted by TSA. If choosing to take only the training, the pilot must submit the application for a Remote Pilot certificate to one of several individuals authorized by the FAA. The point of this requirement is to confirm that the individual is who he says and to verify that the applicant meets the applicable flight review requirements. Again, TSA vetting will not be required since the pilot has already been evaluated. As is the case with individuals with no previous pilot's license, there is a recurrent training requirement every 24 months for the Remote Pilot certificate to remain valid.

At present, there appears to be a glitch in the regulation that, unless corrected, will affect the practical effective date of the Final Rule. Unless the FAA determines otherwise, an applicant will not be able to take the required knowledge test or submit an application until the Final Rule takes effect. Thus, absent a correction, there will necessarily be some lag time between the Final Rule's August 29 effective date and the commencement of operations under Part 107, since the FAA will not be able to issue certificates on the first day the rule becomes effective. The FAA is aware of this issue and is expected to resolve it before August 29. Should it fail to do so, operators will need to rely on their existing Section 333 Exemptions or delay operations until they have a properly certificated Remote Pilot.

Expanded Areas of Permissible Operations Within Remaining Limits

While superficially it appears that the FAA has not expanded the areas of permissible operations horizontally (meaning the ground-area or radius) and has reduced the area of operations vertically (meaning altitude) from what was originally proposed to what has been permitted under its Section 333 Exemptions, various carve-outs allow for expanded operations in some circumstances. Recent Section 333 Exemptions categorically barred operations from moving vehicles.8 That prohibition has severely limited the range that could be covered during operations, particularly when combined with the requirement to operate within one pilot's visual line of sight. Both of these provisions have been relaxed through allowances to the general prohibitions. When taken together, these carve-outs substantially increase the ability of commercial operators, particularly in the transportation and energy sectors, to expand the scope of their drone operations.

Horizontal Expansion: Visual Line of Sight Operations. Part 107 retains the FAA's emphasis on maintaining VLOS, but with some notable changes from the NPRM.

First, the Final Rule allows the Remote Pilot to hand off control of the unmanned aircraft to another Remote Pilot while the aircraft is in flight. This "daisy-chaining" of operations allows for extension of operations well beyond the initial Remote Pilot's visual line of sight, effectively limiting operations to practical battery considerations. Hand-offs from Observer to Observer are allowed to expand the Observer's situational awareness while the unmanned aircraft remains within a Remote Pilot's visual sight. However, the Rule does not allow the same hand-off for Observers, such that the aircraft would remain within sight of an Observer but not the Remote Pilot. The FAA's rationale is that the delay in communicating a possible problem to a single Remote Pilot through multiple Observers is eliminated when the aircraft always remains within sight of one or more Remote Pilots.

Second, in a shift from its previous position, the FAA will now permit an unmanned aircraft to be operated from a moving vehicle or vessel, as long as the operation takes place in a sparsely populated area. The FAA has not defined "sparsely populated area," but it has provided some guideposts. It cited one FAA legal interpretation that a 10-acre site with 20 people "would be considered sparsely populated."9 It also cited FAA legal opinions adopting "a case-by-case analysis" to the term. The FAA acknowledges in the Final Rule that technical innovation can permit operations in areas with higher population densities to be conducted safely. As a result, it is willing to consider case-by-case waiver applications when the applicant can establish that the operation "can safely be conducted under the terms of a certificate of waiver."10

The FAA recognized that the provision for operation from moving vehicles or vessels will expand operations generally, including in the transportation and energy sectors. Some of the key operations cited by the FAA are "inspection of objects that extend for miles, such as power lines, pipelines, railway lines, highways, and solar and wind farms."11 Similarly, operations from a moving vehicle would benefit "surveying catastrophic scenes," as well as "safety scouts leading and surveying railroad tracks in front of trains, and surveying for road hazards in front of trucks and emergency vehicles."12

Operations from aircraft are explicitly prohibited, although the FAA will consider waiver requests. The Final Rule is silent on operations from trains, and the wording of the regulatory text indicates that the FAA will likely require a waiver for such operations. As long as the operation is conducted only in sparsely populated areas, there is no reason to believe the FAA would deny such a request and could, at its option, decide to address it through a legal interpretation.

Finally, one limitation on operations from a moving vehicle or vessel may not be waived. Part 107 categorically bars all operations from a moving vehicle to transport someone else's property for compensation or hire. The FAA has put particularly tight restrictions on such operations to avoid characterizing the operations as "air carrier" operations that would be subject to stricter requirements, including the statutory requirement to be a U.S. citizen and hold economic authority from the Department of Transportation ("DOT").13 Based on historical interpretations of "air carrier," the prohibition on carrying property for compensation or hire prohibits the point-to-point transportation of cargo rather than a prohibition on carrying property that will be used during the course of the flight.

Vertical Expansion: Operating Altitude. Part 107 provides two important deviations from the NPRM regarding maximum operating altitude.

First, sUAS must operate below 400 feet AGL, rather than the operating ceiling of 500 feet AGL proposed in the NPRM. The FAA determined that because most manned aircraft operations transit the airspace at or above 500 feet AGL, it made sense to impose a 100-foot buffer between manned and unmanned operations.

Second, the FAA established a new provision in the Final Rule allowing sUAS to fly higher than 400 feet AGL when operating within 400 feet of a structure up to an altitude of 400 feet above the structure's immediate uppermost limit.14 Since manned aircraft are prohibited from flying close to structures, the FAA determined that this new maximum altitude provision will not compromise aviation safety. This provision is particularly helpful for operators conducting facility and infrastructure inspections. The FAA specifically noted that "[a]llowing higher altitude small UAS operations within a 400-foot lateral limit of a structure will enable additional operations (such as tower inspection and repair) while maintaining separation between small unmanned aircraft and most manned aircraft operations."15 Wind turbine inspection may benefit particularly since the tips of their blades often approach or exceed 500 feet AGL. Inspection of coal fire power plant chimneys may also be considerably eased by this provision.

Horizontal and Vertical Expansion: National Airspace and Flight Around Airports. Part 107 permits sUAS operations in uncontrolled ("Class G") airspace without permission from air traffic control ("ATC"). Acknowledging concerns about the risks of such operations near manned aircraft and airports, the Final Rule prohibits operating an sUAS in any airspace "in a manner that interferes with operations and traffic patterns at any airport, heliport, or seaplane base."16 For instance, a drone hovering in Class G airspace near a plane's takeoff trajectory could interfere with an airport's traffic and could violate Part 107, even though not operating in prohibited airspace. Unlike operations near airports under Section 333 Exemptions, such operations would not require notifying the airport or a separate certificate of authorization. However, given the prohibition on interfering with manned operations, the FAA predicts that sUAS pilots will avoid operating near airports altogether due to the risks involved.

In line with the NPRM, sUAS operations will be permitted, with either ATC permission or a waiver, in Class B, C, and D airspace and the lateral boundaries of the surface area of Class E airspace (designated for an airport).17 The FAA emphasized that ATC is best situated to approve sUAS operations in controlled airspace but noted that individual ATC requirements and approval time may vary. For example, an ATC approval may require two-way radio communications or additional altitude restrictions to operate in controlled airspace. Commercial sUAS operators should be prepared for longer approval wait times and more stringent requirements in busier controlled airspace. Instead of ATC permission, sUAS operators may request a waiver on the grounds that their operations in Class B, C, D, or E airspace will be safe due to additional equipment, such as geo-fencing.18 As such technologies evolve, these waivers may be easier to obtain because the FAA will not need to evaluate each equipage case-by-case and thus will be able to streamline the approval process.

The FAA also adopted its NPRM proposal requiring controlling agency permission for operations in prohibited and restricted areas (e.g., airspace under military command).19 Notably, the FAA rejected calls to create sUAS-restricted airspace around energy facilities but emphasized its Notice to Airmen ("NOTAM") advising that pilots avoid such sites.20 Thus, while energy facilities will not be prohibited from conducting their own sUAS monitoring operations, sUAS operations near such facilities will remain a risk that the FAA does not prohibit by regulation.

In contrast to the NPRM, the Final Rule allows sUAS operation in airspace restricted by NOTAMs as long as operations comply with current Part 91 provisions.21 This acknowledges that in most instances, compliance with NOTAMs is voluntary, but that certain types of NOTAMs have mandatory elements. For example, an sUAS seeking to operate in a NOTAM-designated area in the vicinity of a natural disaster will need to meet the requirements of 14 C.F.R. § 91.137(c), such as operating under the direction of an official in charge of the disaster relief.22 The Final Rule does not differentiate between manned aircraft and sUAS for purposes of receiving a waiver from NOTAM restrictions. Therefore, commercial operators should be prepared to comply with existing Part 91 requirements, which may require more than ATC permission or a waiver.

Horizontal Expansion: Operations Over and Near People and Property. Part 107 also expands operations near people and over property, eliminating setbacks and other requirements from the NPRM and/or Section 333 Exemptions.

First, Part 107 allows for broader operations over and near people than proposed in the NPRM and allowed under Section 333 Exemptions. The NPRM proposed allowing operations directly over people involved in the UAS operations and others under a protective structure.23 It did not mention operations over people in vehicles. Section 333 Exemptions allowed only flight directly over people directly involved in the UAS operations and provided several additional rules for operations near anyone else. Operations had to be at least 500 feet from all persons, unless the operator ensured "barriers or structures are present that sufficiently protect that person from the UAS and/or debris or hazardous materials such as fuel or chemicals in the event of an accident." Even people directly participating in the intended purpose of the UAS operation had to be briefed on the risks and had to give express consent to operations within 500 feet.24

Part 107 allows broader operations. It allows operations directly over25 people "directly participating" in the UAS operation, under the cover of a protective structure and (in the newly added category of) people covered in a stationary vehicle.26 Operations can be conducted near all other persons, without a briefing or consent, at a distance determined by the Remote Pilot necessary for safe operations of the particular sUAS, taking into account the conditions (e.g., aircraft weight and wind speed) at the time. The FAA has declined to require a specific minimum standoff distance because such a requirement "would be more burdensome than necessary for some operations while not being stringent enough for other operations."27 Even though notice is not required, the FAA noted that giving notice to people can be part of fulfilling the obligation to ensure that the operation does not endanger the safety of bystanders.

The group of people "directly participating" in the operation is far from limitless, and it does not include individuals participating in a broader endeavor, such as bridge or power line inspections. "Directly participating" refers to specific personnel that the Remote Pilot has deemed to be involved with the flight operation, including the person manipulating the controls of the sUAS and the visual observer. It extends to any person who is necessary for the safety of the sUAS flight operation but excludes all others, even if they consent to overhead flight.

Significantly, the prohibition against operating an sUAS over a person may be waived. As with all other waiver requests, the petitioner will need to demonstrate on a case-by-case basis that it has mitigated the risks to ensure that flight over people is safe. For example, the FAA indicated that airworthiness certification of the sUAS is a possible mitigation.28

Second, Part 107 allows sUAS to be flown over property, even without the property owner's permission. This is a substantial change from operations under Section 333 Exemptions. Those operations generally had to be conducted at least 500 feet from all structures. Before operations closer to any structure, the operator needed to "obtain permission from a person with legal authority" over the structure, and the pilot had to "make a safety assessment." Additionally, operations were limited to airspace "over private or controlled-access property with permission from a person with the legal authority to grant access" for each flight.29

Part 107 allows much broader flight over property without the need for consent. The FAA recognized that the public's statutory right of free transit through the airspace includes the users of unmanned aircraft. Part 107 does not bar operations near or over critical infrastructure, but the FAA emphasized that for both manned and unmanned aircraft, "to the extent practicable, pilots are strongly advised to avoid the airspace above, or in proximity to such sites as power plants (nuclear, hydro-electric, or coal), dams, refineries, industrial complexes, military facilities and other similar facilities."30 Several state legislatures have attempted to prohibit sUAS operations over or in the vicinity of critical infrastructure. While the FAA has not definitively stated such provisions are preempted by federal regulation, it has previously indicated that they likely are unless part of a broader restriction on trespass that is not limited to unmanned operations.31

Significant Additional Limits

Weather and Visibility Requirements. The FAA continues to impose weather and visibility requirements that will limit commercial operations. Part 107 requires three miles of visibility and that operations remain 500 feet below and 2,000 feet horizontal from clouds.32 The FAA is concerned about the Remote Pilot being able "to see and avoid other aircraft." Although many commenters suggested removing or reducing this requirement, the FAA insisted that it is necessary to enable the Remote Pilot to see rapidly approaching manned aircraft and to move the slower unmanned aircraft out of the way, including when the manned aircraft exits clouds.

The FAA acknowledged that these requirements are more stringent than those for manned aircraft operating in Class G airspace, which need only one mile of visibility and must simply "keep clear of clouds."33 The FAA imposed a more stringent visibility requirement because sUAS are more difficult for other aircraft to see than manned aircraft, and sUAS are not required to have collision avoidance technology that is on manned aircraft. These Part 107 restrictions are unchanged from the NPRM, except the NPRM proposed they may not be waived.34 The FAA has backed off this position, recognizing that some operations could be safe with reduced or no cloud clearance requirements, e.g., where there is a lower chance of "interaction with manned aircraft" and where "other means," such as collision avoidance technology, mitigate the risk of collision. The FAA seemed to acknowledge that this rule would limit disaster recovery operations for public sUAS flights and specifically noted that the rule does not apply to such public operations. The FAA acknowledged that similar "salutary" or beneficial purposes could justify a waiver when the Remote Pilot can establish that the operation can safely be conducted under the terms of a certificate of waiver.

The visibility requirements will substantially inhibit many operations in the transportation and energy sectors where sUAS operations could be most beneficial. Some of the main uses in those sectors will involve less than ideal weather conditions. For example, railroads may want to fly ahead of trains to ensure the tracks are clear during periods of heavy rain and flooding, particularly since visibility may be reduced for train operators. Similarly, inspection of energy infrastructure, particularly after a storm, may need to occur before the weather has completely cleared. Moreover, low visibility and clouds will be particularly common in areas that regularly experience heavy cloud cover. Companies planning such operations in such areas should consider whether their operations can qualify for a complete or partial waiver of this requirement.

No Nighttime Operations. Following the NPRM, Part 107 continues to prohibit nighttime operations.35 The FAA explained that reduced visibility increases the risks from midair collision, particularly because it becomes more difficult to judge the distance from and movement of manned aircraft, sUAS, and other lighted objects. Night operations also increase the risk of collision with people, structures, and obstacles on the ground, particularly when unlighted, because sUAS operate at such low altitudes. Part 107 allows operations during twilight (one half hour before official sunrise and one half hour after official sunset, except in Alaska) with anti-collision lights that are visible for at least three miles. The FAA explained that twilight provides sufficient light to avoid collisions with objects on the ground, but anti-collision lights are still necessary to provide adequate visibility.

Significantly, the nighttime prohibition may be waived. The FAA recognized that there could be benefits to allowing certain sUAS operations at night, such as search and rescue or firefighting operations. Waivers will be granted when the applicant can demonstrate sufficient mitigation such that operating at night would not reduce the level of safety of the operation.

Section 333 Exemptions Going Forward

The implementation of Part 107 raises a question of how the FAA will address pending Section 333 Exemption petitions. The FAA has notified petitioners that it plans to review and group all pending petitions and process them under a three-tiered approach.

Tier 1 petitions are requests to conduct operations that fall entirely within the scope of Part 107 without the need for regulatory relief via a waiver or exemption. The FAA will close the docket on these petitions and advise the operators that they may begin operations in compliance with Part 107 on its effective date. Tier 2 petitions are requests to conduct operations that fall entirely within the scope of Part 107 but will require a waiver under Part 107. The FAA will close the docket on these petitions and consider the exemption petition as a waiver application and process them accordingly. Finally, Tier 3 requests are requests to conduct operations that require additional regulatory relief because they may not be conducted under Part 107 and are not eligible for a waiver. The FAA will continue to process these petitions as traditional Section 333 Exemption requests.

The Final Rule allows sUAS operators who have received and are currently operating under approved Section 333 Exemptions to conduct operations under their Section 333 Exemptions or under Part 107, whichever provides the broadest regulatory permission. For example, operators with a current Section 333 Exemption allowing nighttime operations can continue to conduct nighttime operations under their Section 333 Exemption until the exemption expires, avoiding the immediate need to obtain a waiver for such operations under Part 107 but subject to the conditions and limitations set forth in the Section 333 Exemption. Once the Section 333 Exemption expires, the FAA will evaluate the operations covered by the Exemption. If the operations fall within the scope of Part 107 and may be eligible for a waiver, the FAA will likely find no need to renew the Section 333 Exemption. Instead, the FAA would require the operator to seek a waiver under Part 107.

In the vast majority of cases, Part 107 is more lenient than Section 333 Exemptions. Accordingly, other than motion picture operators, who are already subject to a different set of conditions than traditional aircraft operators, there is little incentive to continue operating under a Section 333 Exemption after the Final Rule is effective in late August. However, operations before the effective date will need to be conducted in accordance with the Exemption's conditions and limitations, and companies without an Exemption will have to wait until August 29 to commence operations. In addition, should the FAA decide against issuing Remote Pilot certificates before the August 29 effective date, holders of existing exemptions will need to rely on those exemptions until their pilots can be issued a temporary Remote Pilot certificate.

Other Noteworthy Requirements

There are many additional requirements that affect commercial operations and warrant additional consideration, including:

Conclusion

The FAA's Final Rule on sUAS continues to pose challenges for commercial operators. Until the Agency routinely authorizes operations beyond VLOS or in conditions with poor visibility, including nighttime operations, energy and transportation companies will be limited in their ability to maximize the potential for sUAS to increase safety and efficiency and to reduce costs. However, by allowing workarounds to the general prohibition on operations beyond VLOS, such as in-flight Remote Pilot handoffs and operation from moving vehicles, as well as providing a waiver process for those provisions that are amenable to technological solutions, the FAA has developed an initial rule that allows for significant growth and that will largely accommodate the needs of the transportation and energy industries.

Footnotes

[1] 81 Fed. Reg. 42,064 (June 28, 2016).

[2] FAA Advisory Circular 107-2 uses the acronyms "VO" for Visual Observer and "PIC" for Pilot in Command. This Commentary uses "Observer" and "Remote Pilot," respectively.

[3] 14 C.F.R. § 107.19.

[4] 14 C.F.R. § 107.33.

[5] 14 C.F.R. § 107.33(a).

[6] 14 C.F.R. § 107.31(b).

[7] 14 C.F.R. § 107.31(a).

[8] See, e.g., Alamo Drone LLC, Exemption No. 16775, at 6 ¶ 27 (June 7, 2016) ("The UAS may not be operated by the PIC from any moving device or vehicle.").

[9] The legal interpretations addressed 14 C.F.R. § 91.119(c), which allows some manned aircraft operations below 500 feet in "sparsely populated areas."

[10] 14 C.F.R. §§ 107.200 and 107.205.

[11] 81 Fed. Reg. at 42, 115.

[12] Id.

[13] By limiting operations to within a fixed Remote Pilot's VLOS (as well as to within intrastate operations), DOT has characterized the operations as not part of a broader network of interstate commerce warranting economic authority requirements.

[14] 14 C.F.R. § 107.51(b).

[15] 81 Fed. Reg. at 42, 118.

[16] 14 C.F.R. § 107.43.

[17] 14 C.F.R. § 107.41.

[18] A geo-fence is a virtual barrier that may prevent the small unmanned aircraft from either entering or exiting a geographically defined area. The area may be defined by a property owner or aircraft operator utilizing a combination of mapping programs and technology such as global positioning system ("GPS") or radio frequency identification ("RFID").

[19] 14 C.F.R. § 107.45. These areas are designated in 14 C.F.R. § 73.

[20] See FDC NOTAM 4/0811.

[21] 14 C.F.R. § 107.47.

[22] 14 C.F.R. § 91.137.

[23] 80 Fed. Reg. 9544, 9563-64 (Feb. 23, 2015).

[24] The Alamo Drone, LLC, Section 333 Exemption, at 7, ¶ 28 (June 7, 2016).

[25] "Over" refers to "the flight of the small unmanned aircraft directly over any part of a person."

[26] Operations over moving vehicles are prohibited because the unmanned aircraft could be distracting and because, depending on the angle of impact, the unmanned aircraft could strike the vehicle with increased force (i.e., a greater delta V).

[27] 81 Fed. Reg. at 42,130. See also id. at 42,133 (emphasizing that the FAA does not intend to be prescriptive as to how to conduct safe and compliant UAS operations).

[28] The FAA plans to revisit the question of standards when it publishes consensus standards for the safe operation of small UAS over people, which are in development.

[29] The Alamo Drone, LLC, Section 333 Exemption, at 7, ¶¶ 28, 29 (June 7, 2016).

[30] 81 Fed. Reg. at 42,147 (citing FDC NOTAM 4/0811).

[31] For general guidance on preemption, see FAA Fact Sheet on State and Local Regulation of Unmanned Aircraft Systems (UAS).

[32] 14 C.F.R. § 107.51(c) and (d).

[33] 14 C.F.R. § 91.155(a).

[34] The FAA also clarified that the requirement applies from the control center where the Remote Pilot is located and is for three miles of visibility diagonally. 81 Fed. Reg. at 42,107 ("The 3-mile flight visibility requirement is based on a slant angle from the control station. In other words, a person standing at the control station of the small UAS must be able to see at a diagonal distance of 3 miles into the sky in order to detect other aircraft that may be approaching the area of operation."); see also § 107.51(c) (explaining flight visibility).

[35] 14 C.F.R. § 107.29.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Rebecca MacPherson
Similar Articles
Relevancy Powered by MondaqAI
Lewis Roca Rothgerber Christie LLP
Reed Smith
Lewis Roca Rothgerber Christie LLP
 
In association with
Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Lewis Roca Rothgerber Christie LLP
Reed Smith
Lewis Roca Rothgerber Christie LLP
Related Articles
 
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions