UK: Allowable Costs In Single Source Defence Contracting: New SSRO Guidance

Last Updated: 13 July 2018
Article by Elizabeth Reid and Lucy England

On 1 April 2018 revised guidance from the Single Source Regulations Office (SSRO) on Allowable Costs came into effect (2018 Guidance). This 2018 Guidance replaces the guidance from July 2016 (2016 Guidance) and will be the applicable guidance for all qualifying contracts entered into on or after 1 April 2018.

The Defence Reform Act 2014 (Act) states that both the UK Ministry of Defence (MoD) and its single source contractors must have regard to the applicable SSRO guidance on Allowable Costs in determining whether costs are Allowable under their qualifying defence contracts and qualifying subcontracts (Qualifying Contracts). The SSRO Allowable Costs guidance is therefore very important and should be considered to be part of the single source legislative framework.

The Act requires that Qualifying Contracts are priced on the basis of Allowable Costs meaning that such costs must be Appropriate, Attributable to the relevant contract and Reasonable in the circumstances (the AAR Test). The AAR Test applies to all costs under a Qualifying Contract including labour costs, cost of materials, sales, marketing and third party costs, R&D costs and costs associated with loss and poor performance.

This article focuses on what the new 2018 Guidance says in respect of three categories of costs which are the subject of regular debate between MoD and industry: costs associated with rework and wastage, faulty workmanship and the costs of insurance to cover poor performance.

Rework and Wastage

Under the 2016 Guidance, the costs of rework and wastage may be Allowable if they meet the AAR Test. Such costs have to be "agreed between the contractor and the MoD based on the expected level of rework and wastage given the nature of the contract in question". The 2016 Guidance also states that if rework is required due to faulty workmanship or breach of contract, then the costs of such rework will not be Allowable. We comment further on the faulty workmanship exclusion below. Industry had a number of concerns with the 2016 Guidance, and particularly felt that there was a lack of clarity as to what level of rework and wastage would be considered reasonable. Whilst the 2016 Guidance gave some broad principles illustrating what is meant by AAR, it did not give any specific guidance on what level of rework or wastage might be reasonable.

Under the 2018 Guidance this position has not fundamentally changed – the costs of rework and wastage remain Allowable if they meet the AAR Test. However, the SSRO has tried to address industry concerns, and the guidance in respect of what a Reasonable level of rework or wastage may be has been embellished, nonetheless it remains limited.

The SSRO recognises, and the 2018 Guidance now provides, that no production or manufacturing process is likely to be completely effective and it may not be economical to achieve zero rework or wastage. What will be a Reasonable level of rework or wastage will depend on the information available and the specific circumstances of the contract, including that:

  • contractors should have adequate quality control and monitoring systems in place to be able to identify the level and, if material, the causes of reworks and wastage. There should be plans in place to reduce costs through learning curve and efficiency gains; and
  • once the parties have considered the information available and the specific circumstances of the contract, including how they compare to other contracts, a judgement can be made about whether costs are Allowable.

The 2018 Guidance therefore seems to focus more on the quality management systems that a contractor has in place to: (i) assess levels of rework and wastage; (ii) understand what is causing each instance of rework and wastage; and (iii) take steps to address the causes.

It should also be noted that neither the 2016 Guidance nor the 2018 Guidance distinguishes between "direct" rework costs (the costs of the rework itself) and "knock-on" costs arising as a consequence of such rework (e.g. delay costs). If a rework cost does not meet the AAR Test there is therefore a risk that both the direct and consequential costs of such rework will not be Allowable.

Faulty Workmanship

As stated above, under the 2016 Guidance, if rework is required due to faulty workmanship then the costs of such rework will not be Allowable. This position has been the subject of much debate between the MoD and industry. This is because industry argue that in some cases, particularly in more complex programmes, a certain level of faulty workmanship is reasonable and to be expected. In a competitive fixed or firm price contract, a contractor may well price into its fixed price a certain risk contingency for fixing faulty workmanship defects in accordance with its obligations under the contract.

The 2018 Guidance does change this position, and crucially the sentence in the 2016 Guidance which stated that compensation for faulty workmanship would not be an Allowable Cost has been removed. The 2018 Guidance also then anticipates that in some circumstances faulty workmanship costs may be Allowable:

"Costs associated with faulty workmanship may be Allowable where both parties are satisfied that faulty workmanship cannot be avoided because of the complexity or lack of maturity of the process being undertaken and the AAR test is met. These costs may be re-classified as reworks in some circumstances."

However, other faulty workmanship costs will remain not Allowable – those "where the fault has occurred due to poor skills, training, systems or materials that the contractor has in place or has purchased."

As with the remainder of the 2018 Guidance on rework and wastage, the focus is on the systems the contractor has in place to assess faulty workmanship and what is causing it. For faulty workmanship costs to be Allowable, the contractor will still need to prove that they are AAR: something that may remain difficult given the lack of prescriptive rules on what AAR means.

What do these changes mean?

In all cases the onus remains on the contractor to demonstrate that the relevant costs do satisfy the AAR Test. The likelihood of satisfying the MoD that such costs are Allowable is likely to increase where:

  • Rework costs have been agreed because a complex manufacturing process is being undertaken or a product is being manufactured for the first time, i.e. the contractor can demonstrate that in certain circumstances rework costs cannot be avoided given the complexity of the product being manufactured.
  • A contractor can demonstrate that such costs will reduce future costs through efficiency gains or it being part of a learning curve.
  • A contractor can demonstrate that the rework costs have been incurred because of a re-specification or a change in design by the MoD.
  • A contractor can demonstrate that the costs do not exceed what might be expected to be incurred in the normal delivery of a QDC or QSC.

We continue to recommend that the Qualifying Contract sets out in as much detail as possible those costs which are agreed at the outset as being Allowable and meeting the AAR Test, so as to mitigate the risk of any challenge by the MoD at a later date. The MoD and the contractor could also pre-agree the process that the contractor will follow to assess causes of rework. We further recommend that if a Qualifying Contract refers to certain costs as being not Allowable, it is clear whether this is intended to cover both direct and consequential costs.

Whilst from a commercial perspective being specific in the contract on any agreement regarding Allow-ability of costs is helpful, ultimately if the MoD challenges a cost, it will be a question of fact as to whether the cost is Allowable (based on the DRA, SSCRs and 2018 Guidance) regardless of what is written in the contract.

Insurance for 'poor performance'

The third category of costs which are often the subject of discussion are those associated with insurance for poor performance. The SSRO's position on this and the new 2018 Guidance have not changed, which will not come as welcome news to contractors. The 2018 Guidance restates that it would neither be Appropriate nor Reasonable for a contractor to be paid to cover against its own poor performance in delivering the contract. Accordingly, contractors will continue to be unable to recover their costs of insurance associated with faulty workmanship, defective parts or breach of contract.

The 2018 Guidance unfortunately remains unclear as to specifically which insurance policy costs this would disallow. By way of example, contractors would usually purchase contractors all risk and product liability insurance as part of an overall risk management strategy. These insurances provide protection to a contractor against damage arising from faulty workmanship or supply of a defective product and would often be business wide i.e. would not be specific to the QDCs or QSCs. The MoD benefits from these insurances being in place, as without them a contractor may well request MoD indemnities. Industry is therefore concerned if the costs of such insurance policies are not Allowable.

Once again we recommend being clear in the Qualifying Contract as to whether the MoD and contractor have agreed that certain insurance premium costs are considered to be AAR and therefore Allowable under the contract. As set out above, this would provide commercial comfort only, and ultimately it is a question of fact as to whether an insurance premium cost is Allowable.

Originally published 03 July 2018

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Similar Articles
Relevancy Powered by MondaqAI
 
In association with
Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Related Articles
 
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions