Turkey: Road To 2023

Last Updated: 15 June 2017
Article by Emre Hatem and Mevlüt Akbaş

Nationwide Reach through Divided Roads

Total roads and motorways in Turkey reached nearly 66,4k km as of 2016 with the impact of the focus on divided road investments within the last decade. Increase in total roads and highways stayed limited due to priority of transformation of the existing roads into divided roads.

Total divided roads increased from 7,2k km in 2003 to 23k km in 2015 which increased the divided roads ratio in state roads to 61% in 2015 from 16% in 2003. Total divided roads are further targeted to reach 36,5k km by 2023, including motorways. The divided road investments of the Government is expected to exceed USD 10 bn until 2023.

Turkey plans to invest in c. 5,8k km new motorways until 2023 with BOT model and reach 7,9k km motorways in total including the Dardanelles Bridge, which will be tendered in January 2017 and the Istanbul Big Tunnel Project. The estimated total investment size for new motorway projects is exceeding USD 70 bn, which in turn will mean around USD 50 bn debt financing need and USD 20 bn equity investment.

The contractual and financial structures of the existing mega motorway PPPs are proved to be bankable and expected to lead the structures of upcoming projects.

In addition to the local investors, international investors are also interested in Turkish road and motorway projects, which is beneficial considering the experience, technology and the financing capabilities of the international investors.

Iron Network of High Speed

National railway network length is 12,5k km as of March 2016 where only 1,2k km of this network is high speed lines ("HSL") and the remaining 11,3k km is conventional lines.

The Government aims to increase passengers using railways in total passenger transportation share from 1% in 2014 to 10% while cargo carriage via railways in total cargo carriage in Turkey is aimed to increase from4.4% in 2014 to 15%in 2023.

The total length of planned additional railway lines is 12,6k km until 2023 which in turn will mean c.USD 30 bn investment in following 8 years time.

Currently the HSL projects are constructed through public procurement method.

Together with the road investments, international investors' interest is also increasing in Turkish railway sector investments. However localization strategy and the Government's support has a significant importance on the feasibility of the railway projects for the private sector for new HSL and train sets tenders.

Utilizing the Geographical Advantage of the Maritime

Turkey total port capacity increased by c. 1.4m TEU in 2014 and reached 12.5m TEU in 2015. Marmara region represents c. 55% of total port capacity. Mediterranean and Aegean regions follow Marmara region with their c. 25% and c. 17% share in total container capacity of Turkey.

The total port handling capacity is expected to reach 30m TEU in 2023 with and increase in the capacity by 17.5m TEU in 8 years time (2.2m TEU/year).

The estimated investment amount is well exceeding USD 30 bn to reach 2023 targets, considering the transformation of fishing ports into marinas in addition to new port investments and other investments in maritime transportation sector.

Speaking of the financing of these projects, funds exceeding USD 25 bn will be required in addition to equity financing.

Focus on Aviation

The initial target for 2023 was to reach 60 airports operational with a total capacity of 350 million passengers per year through c.USD 30 bn investment.

In line with the 2023 targets, the Government plans to increase the number of operating airports in the domestic flight network from 55 to 63 with the construction of new airports in Yozgat, Rize- Artvin, Bayburt-Gümüşhane (Salyazı), Niğde-Aksaray, Karaman, İzmir Çeşme Alaçatı, western Antalya and Çukurova Regional Airports. These airport investments will be made either with PPP method or public procurement method.

The most significant CP&I project in the aviation sector is 3rd Airport project in Istanbul which is expected to be partially operational in 2018. This airport is planned to replace the Ataturk Airport when it is completed with its total planned annual capacity of 150mpassengers.

Integrated Coverage for Better Healthcare Services

Turkey plans to add c. 32k additional beds to state hospitals by 2023 while transforming normal beds into quality beds and increase the quality beds ratio from current 41% level to 100% for state hospitals. In order to reach the Government's 2023 healthcare targets, total required additional bed capacity is c. 52,7k beds which means, 103,5k of the already existing beds need to be renewed to be quality beds.

50k of the total required new/transformed quality beds are planned to be introduced through ongoing healthcare PPP program where 34 projects are already identified nationwide. Total expected investment amount of these projects is exceeding USD 16 bn.

The estimated investment amount for the additional 105k quality bed investment is c.USD 14 bn, which will be executed by the Ministry of Health, the universities and the private sector.

Currently, 11 of the already identified 34 PPP projects has reached financial close or close to financial closing. 11 out of remaining 23 projects are still in the preliminary tender stage. The total number of the PPP projects is also expected to increase which will increase the total estimated investment amount as the integrated healthcare campus projects require significantly higher investments compared to the lower sized standard hospitals.

Connecting Globally

In line with the developing communication technologies, the importance of the CP&I investments in telecom sector is increasing. The total investment size in telecoms exceeded USD 20 bn level for the last decade and it is estimated to exceed annual investment amount of USD 3 bn for the following 8 years until 2023.

Apart from the Government's goals, the telecoms sector is structured to reflect to the requirements of the market. Currently the key growth areas in telecoms sector are;

  • Extension of the fiber optic network to provide faster internet connection to the users and to support the Long Term Evolution ("LTE") mobile internet connection;
  • LTE compatible base station investments of the mobile service providers, and;
  • Establishment of data centers to support data collection and transfer.

Localization and Diversification of Supply

Turkey's total installed capacity of the power plants has reached to 78,1 GW as of September 2016. Total electricity consumption has reached to 264,1 TWh in 2015 while the total production is 259,7 TWh. The main resource of the electricity generation is natural gas (37,8%), followed by the coal with 28,4% share in total generation.

The Government estimates that the total annual consumption will reach to 357 TWh in 2020. In order to meet the electricity demand, the Government aims to increase the total installed capacity to 125 GW by 2023 by mainly increasing the renewables and indigenous coal fired power plants in addition to the introduction of Nuclear Power Plants ("NPP"s) within the Turkish electricity generation environment.

Currently, two NPPS have already been identified and are in preliminary investment stage with total planned capacity of 9.200 MW. Total expected investment amount for these projects is c.USD 36 bn where a third nuclear power plant is also in consideration of the Government.

In addition to the NPP investments, excluding the replacement of the existing power plants, c.USD 60-65 bn additional investment is also required to reach the 125k MW installed capacity target in 2023.

Another focus area of the Government and private sector will be the privatization of existing energy assets which has become a standard practice in the last 5 years. After the successful handover of large thermal power plants and a number of hydro power plants, the pipeline in this area is mainly composed of several medium sized hydro power projects and a limited number of sizeable coal and natural gas power plants. The brownfield investments for the renovation in thermal assets not only will improve the environmental effects of the projects but also will impact the total installed capacity since the current utilization rates are very low.

In addition to the privatization of the existing assets, privatization of the coal mining and power generation areas is initiated in 2016 within TOR structure, in order to support the utilization of indigenous coal for the electricity generation. The first announced coal reserve to be privatized within this scheme is Çayırhan coal reserve in Ankara in province.

The Government also initiated a new privatization model to increase the utilization of renewable energy resource areas for solar and wind power generation. This model includes the transfer of usage rights of the designated areas to be used for the construction of solar and wind power generation facilities. As of report date, for the solar projects the government conducted studies in five locations to assess the potential of the development areas where the first tender is announced for Konya Karapınar site. The total expected investment for this site is c. USD 1.2-1.5 bn for the construction of photovoltaic solar module production facility with annual production capacity of 500MW and solar power generation facility with 1.000 MW installed capacity.

The power generation asset investments are expected to be focused on the development of new renewable projects, especially solar and wind power plants. The utilization of indigenous coal fired power plants are also expected to increase based on a recent study of the Government to enhance the quality of the indigenous coal for power generation which is expected to lead an increase in indigenous coal fire power plant investments in addition to the privatizations, to replace gas fired power plants with low efficiency.

Looking ahead

Considering the size of the expected CP&I investments in the following years which will reach to c.USD 325 bn, the Turkish CP&I market will require significant amount of funds to realize the planned projects. Currently the main driver of the financing CP&I projects in Turkey is local commercial banks for the debt financing and the local investors on the equity side for private sector investments and PPP projects.

The Government's role has a significant importance for the realization of the planned investments in addition to the privatization transactions and the financial support to be provided through the Turkish Wealth Fund.

The continuity of the local lenders and investors appetite in Turkish CP&I market also has importance for the sustainable growth in the market as planned and expected. In addition to local lenders and investors, Turkish infrastructure and financing environment requires;

  • Introduction of additional international infrastructure funds
  • Additional international financial investors and sustainability of the existing appetite
  • International corporates and strategic investors
  • Further Capital Market Solutions
  • Continuous support from the Multilaterals and ECAs for the realization of the planned projects.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Similar Articles
Relevancy Powered by MondaqAI
 
Some comments from our readers…
“The articles are extremely timely and highly applicable”
“I often find critical information not available elsewhere”
“As in-house counsel, Mondaq’s service is of great value”

Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Related Articles
 
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions