1. Zoning Plans in General

Two of the main problems brought by urbanization are the supply of living areas to the residents and prevention of negative issues brought by unplanned settlement. For these reasons, central or local administrations prepare plans by taking into account the life style, character, population, area, service and structural relations and connections with external world of the areas constituting living areas and they inspect the progress of settlement to advance in accordance with such plans. The plans prepared for such purposes are called zoning plans. In this article, firstly the types of zoning plans will be examined and then pendent durations, administrative objections and actions related to these plans as well as their reasons will be elaborated.

The zoning plans may be examined under four main headlines. As a matter of fact, zoning plans are separated into four types as (i) regional plan, (ii) environmental plan, (iii) master development plan and (iv) implementation development plan in the Zoning Code (Law No. 3194, published in the Official Gazette dated May 9, 1985 and numbered 18749) ("Zoning Code"). These plan types are elaborated below:

a. Regional Plans : These are the plans prepared in order to specify the trends of social and economic development, development potentials of the settlements, sectoral aims, distribution of activities and infrastructure. Not being solely a physical plan, regional plans involve a number of policies. The authority to create or order creation of such plans belongs to the Ministry of Development.

b. Environmental Plans : These are the plans which specify, in accordance with the regional plans, the settlement and land use decisions for residential, industrial, agricultural, tourism, transportation areas. Environmental plans are drawn through association with the relevant regional plans for the areas which are metropolitan areas or which remain under interest or domain of multiple settlements aspired to be planned together. While they do not have a specific definite scale, they are prepared at a scale of 1/100,000 or 1/25,000 and contain whole of the relevant area.

c. Master Development Plans : These plans are drawn on the regional or environmental plans (whichever one existing) through inscription of cadastral status and show general use functions, main region types, future population densities of regions, (in case it is necessary) structural densities, development direction, sizes and principles of various settlement areas, transportation systems and problem resolution methods of//for the relevant lands. These plans also function to be the source for the implementation development plans. Such plans are explained through a detailed report and constitute a whole along with their reports.

In other words, master development plans determine the general purposes, principles and land use decisions within a report. Metropolitan municipalities are the only authorities in preparation of these plans within the borders of the metropolitan municipalities. In the provinces which are not metropolitan municipalities, relevant provincial or county municipalities are authorized to prepare master development plans. Amendments to the master development plans are only possible through amendments of the plans of same or superior level nature. Map scale of master development plans are generally 1/5,000; however, they may also be prepared at a scale of 1/10,000 or 1/25,000.

d. Implementation Development Plans : Implementation development plans are the plans with the least level of scale. These plans are drawn in accordance with the principles of the master development plans. They set forth, in detail, the settlement and structural order, density and order of the construction blocks, roads, implementation phases which constitute the source of zoning implementation programs as well as other phases and other relevant information. Although they generally have a scale of 1/1,000, they may be drawn at scales of 1/2,000 or 1/500. The authority to prepare implementation development plans belong to the relevant provincial or county municipalities.

2. Main Principle Shaping the Zoning Law: Hierarchy of Plans

The most important principle shaping the zoning law is that a plan with a lower scale cannot be in contradiction with a plan with an upper scale (e.g., implementation development plans cannot contradict with the master development plans). This is called the hierarchy of plans. As per this principle, plans with a lower scale shall conform to the main principles, strategies and decisions of planning set forth in the plans with an upper scale. This principle is also upheld in the Turkish State Council (Supreme Administrative Court) decisions.1 For example, the State Council, in one of its decisions, held that conversion of a land, which has been designated as an area for health facilities in a 1/5,000 scale master development plan, into a residential area at a 1/1,000 implementation development plan is in violation of the law and objective characteristic of the master development plan. From this point, non-conformity of a lower scale plan with an upper scale plan is unlawful and therefore constitutes a reason for cancellation of the relevant plan.

3. Administrative and Judicial Procedures Related to Zoning Plans

a) How Are the Zoning Plans Prepared or Zoning Plan Amendments Made?

As elaborated above, the authority of preparation or amendment of zoning plans (as to which institution – e.g., metropolitan municipality, provincial municipality or county municipality – would have such authority) would depend on the type of the zoning plan, the location of land which is subject to zoning (as well as whether such location is in the borders of multiple provinces or not). For example, the authority to prepare master development plans belongs to the metropolitan municipality in an area within the borders of the metropolitan municipality.

The zoning plans are, as a rule, generally prepared by the municipality authorized to prepare them and approved by the relevant municipal council. Subsequent to such approval, they obtain the status of an administrative act which may be implemented. As per Article 8/1(c) of the Zoning Code, the approved plans are announced concurrently for a period of one month in the announcement areas determined by the relevant municipalities as well as their websites. This is called the "pendency period".

"Those concerned" may object to the plans within the one-month pendency period. However, it is a matter of discussion who "those concerned" are. Such persons may be the owner of the area subject to zoning, a real person or legal entity resident in the area or a state institution whose interests are injured.

The objections to the zoning plan or amendment made by "those concerned" are sent by the municipality to the municipal council. Municipal council examines such objections within 15 days following the objection date and delivers a final decision on them. In practice, it is observed that these objections are rejected almost all the time by the municipal council. In case of such a rejection, "those concerned" may bring a judicial action for cancellation of the administrative act (i.e. final zoning plan or amendment).

b) Bringing a Judicial Action against Zoning Plans or Amendments

Actions brought for the cancellation of zoning plans (i.e. administrative acts) are under the jurisdiction of administrative judiciary. Accordingly, such actions are to be brought either before the administrative courts or State Council, depending on the administrative institution making the administrative act. These cases cannot be brought before the civil courts.

As per Article 34 of the Law of Administrative Judicial Proceedings (Law No. 2577 , published in the Official Gazette dated January 20, 1982 and numbered 17580) ("Code of Administrative Judicial Proceedings"), "In implementation of the legal framework related to the immovable property such as zoning, [...], occupancy or in relation to all rights about these and public assets, the court with jurisdiction is the court whereby the immovable property is located." Accordingly, the court with jurisdiction in the cancellation of zoning plans is to be determined in accordance with where the immovable property is located.

As per Article 7 of the Code of Administrative Judicial Proceedings, the time period to bring an action before the administrative judiciary is 60 days normally starting from the date of the announcement (this date would start from the announcement or presumption of rejection of objection in cases where there has been objection in relation to the relevant plan or amendment). This time period is lapse period causing the lapse of the right to bring an action. Accordingly, the right to bring an action which is not used in its due time would lapse and then no direct actions will be able to be brought in relation to the same subject. For this reason, in terms of ownership protection and liability, these actions must be strictly brought in due time.

Two elements are of specific importance on this matter. Firstly, without completion of the pendency (announcement) period, no action for cancellation of zoning plans (or amendments) may be brought. This is because the zoning plans would not be final (and therefore applicable) unless the pendency (announcement) period is completed. Without completion of such 30-day pendency (announcement) period, any action would be premature and rejected, since there would not yet be any final and applicable administrative act.

Secondly, in case no action would be brought within the time periods indicated above, then no direct action would be brought with the request for cancellation of zoning plans or amendments. However, when an action is brought against the subsequent implementation acts by the administration, cancellation of zoning plans or amendments may be requested. In other words, when an action is intended to be brought against a zoning plan's implementation acts such as construction license, zoning status, parcellation, expropriation, etc., then cancellation of the zoning plan (which is the source of all implementation acts) as well as other upper level plans may be requested. In such case, the rights of action of "those concerned" would not be lost.

4. Main Reasons for Unlawfulness in the Actions for Cancellation of Zoning Plans or Amendments

It should initially be indicated that the zoning plans are, as a rule, nonamendable. They can only be amended in cases required by the public benefit. For amendment, the required conditions (elaborated in further detail below) shall be fulfilled and in case such conditions are not met, the zoning plan or the amendment may be cancelled.

Main reasons for unlawfulness are as below:

a. Non-Obtainment of the Opinion of the Investor Institution: The opinion of the investor ministry or institution, who would execute the project for the relevant facility (e.g., park, hospital, religious buildings, road, school, etc.) located in the social and technical infrastructure area to be amended in the zoning plan, should be obtained. In case the opinion of the investor institution (e.g., ministry, governorship, directorate, etc.) is negative, this would not mean that the plan may not be amended. In other words, even if the investor institution has given a negative opinion, plan amendment may be made. The final decision for this is to be given by the municipality. However, the investor institution has the right to bring an action against the administrative act (i.e., amendment).

In one of its decisions, the State Council has found a municipal council decision unlawful because of the fact that the municipal decision has adopted its decision without showing the elements requiring the plan amendment and without obtaining the opinion of the relevant institutions.2

b. Non-Allocation of an Equivalent Area: Social and technical infrastructure areas in the zoning plans cannot be removed, made smaller or relocated unless there is a mandatory element. In case such an amendment is made, a new equivalent area shall be allocated in the region whereby the service taken by the facility that is removed, made smaller or relocated. For example, in case an area designated as a park gets to be converted into a residential area, then another area in the same neighborhood with characteristics to be used as a park and with the same size shall be allocated as a park area. Again, in case we replace the park in the above-mentioned example with a car park (a technical infrastructure area), then the same would apply.3

c. Plan Integrity Cannot Be Deformed with Amendments: In case of any contemplated zoning plan amendment, population in the area, density, supply balances and requirements shall be researched and it should be examined whether the plan amendment is mandatory. In case it is not mandatory, it would be unlawful to amend the plans in a manner deforming the plan integrity.

d. Compliance of the Zoning Plan and Amendments with the Urbanism and Planning Principles and Public Benefit: As per Article 11 of the Regulation on Spatial Plan Making (published in the Official Gazette dated June 14, 2014 and numbered 29030) ("Spatial Plan Regulation"), in preparation of the zoning plans, the assessment shall be made by taking the future concerns in the account together with the current concerns in order to establish a healthy and orderly environment in the future. Accordingly, the public benefit principle would then be taken into account. As also explained above, the plan hierarchy should be taken into account. These are stand-alone reasons for cancellation.

e. Non-Obtainment of the Opinion of the Plan Author or Non-Existence of a Plan Author: As per Article 28 of the Zoning Code and the Regulation on Qualifications of the Authors Undertaking Plan Making (published in the Official Gazette dated January 7, 2006 and numbered 26046), the zoning plans and amendments are to be prepared by plan authors who have the qualification license. In cases which there is no plan author, the reasoned opinion of the author has not been taken for amendment or the amendment has been prepared by the plan author who does not have qualifications, such acts are deemed unlawful.

f. Non-Conformity with Procedural Rules in Amendment of Zoning Plans: Nonconformity with the procedural rules set forth in legislation and regulations for amendment of zoning plans or attendance of a municipal council to the meetings during discussion of an amendment relating to his/her immovable property (i.e., house, land, etc.) constitute examples to the reasons of cancellation.

g. Narrowing of a Road with Continuity or Creation of a Dead End Street: As per Article 26 of the Spatial Plan Regulation, certain regulative norms are stipulated for plan amendments. For example, a road with continuation cannot be narrowed at certain areas. Traffic roads cannot be narrower than 10 meters whereas pedestrian ways cannot be narrower than 3 meters. Again, plan amendments through creation of dead end streets by municipalities are unlawful. However, in determination of lawfulness in certain cases involving imperativeness in administration's zoning-related actions, the State Council has taken the necessities required by public benefit into account.4

Footnotes

1 Decision of the Sixth Chamber of the State Council dated May 14, 2010 with Docket No. 2008/6920 and Decision No. 2010/4743.

2 Decision of the Sixth Chamber of the State Council dated October 25, 1989, with the Docket No. 1988/479 and Decision No. 1989/982.

3 ibid.

4 Decision of the Sixth Chamber of the State Council dated February 17, 1988, Docket No. 1987/630 and Decision No. 1988/235.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
Some comments from our readers…
“The articles are extremely timely and highly applicable”
“I often find critical information not available elsewhere”
“As in-house counsel, Mondaq’s service is of great value”

Related Topics
 
Related Articles
 
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions