South Africa: Navigating Power Purchase Agreements For The African Continent

Last Updated: 6 November 2012
Article by Lize Louw and Nozipho Bhengu

The South African Department of Energy (DoE)'s Independent Power Producer (IPP) Bid Process is currently underway and preferred bidders are in the process of finalising the documentation needed to reach financial closure (the process of ensuring that local and international funders are ready to invest private capital into the power generating projects that they are financing).

This process has generated a staggering number of complicated legal contracts and documents, including the request for proposal documents, bid responses, power purchase agreements (PPAs), construction and operating contracts, site purchase / lease agreements, equipment supply and transport contracts, interconnection agreements, and joint venture and other contracts which, among others, document shareholder and sponsor participation in the projects. Once a full suite of financing and security documents have been added, one would be forgiven for feeling somewhat overwhelmed.

However, of all these documents, it is arguably the PPAs that are the most important, because these deal with the revenue component of each power generating project. Projected revenues, in turn, comprise the single most important criterion that will render a power generation project bankable and ultimately capable of being on-sold to other investors. PPAs need to be carefully crafted and strive to balance the interest of the various parties failing which they can be a major source of risk for the various stakeholders. In this context, we highlight the more critical and unique provisions of a negotiated PPA. It is important to note that the issues raised herein are relevant even in instances where the PPA is not subject to negotiation by the IPP with the buyer as is the case with the current South African IPP Programme.

Each of these provisions shows how the parties to the PPAs in different African countries have sought to navigate the socio-economic and political realities of power generation and supply, and to provide contractual solutions that protect their diverse interests.

This analysis is based on project documentation prepared for energy projects in a number of different African countries, including for example for the "Safi Energy Hub Project" in Morocco, phase 1 of which contemplates the construction and operation of two 660MW Coal-Fired Power Plants along the Moroccan coast line, and which to date we believe remains the largest recent African IPP project to rely successfully on the tender process.

Major Stakeholders

There are commonly only two parties to a PPA, being the IPP and the entity to whom the IPP will sell the power it produces. In an African context, the latter are often stateowned enterprises such as l'Office National de l'Electricite in Morocco and Eskom SOC Limited in South Africa.

The government in which the IPP proposes to conduct its business, usually acting through the ministry/department responsible for local energy regulation (such as the Energy and Water Utilities Regulator of Tanzania and the DoE of South Africa), will usually have a material say in the content of the PPA, especially in circumstances where it guarantees offtake (see the discussion below on Political Risk). Other stakeholders may include those who sponsor the IPPs' technological and private equity requirements, banks and other financial institutions funding the project, the EPC and O&M contractors responsible for construction and maintenance of the power plant, equipment, fuel and other suppliers to the plant, insurers, landlords and technical, financial and legal advisors. The project will only be successful if there is cooperation and agreement between all stakeholders.

Tariff Determination and Indexation

Given that the PPA is the foundation of a power project's bankability, the most important provision of a PPA is usually the tariff that the IPP can charge for the power it produces.

Of fundamental importance in a tariff-based PPA is the manner in which the tariff is calculated over the life of the project (see the discussion below regarding the Term). If the tariff does not enable the IPP to recuperate the costs that it incurs in producing power, it is only a matter of time before bankruptcy intervenes. The tariff should therefore be based on a realistic and comprehensive calculation of the Levelised Energy Cost (LEC) (or the price at which power must be generated). As a rule of thumb, it is always a good idea to check what end-users are paying for power generally before agreeing to a tariff or proposing a tariff in a competitive bidding environment.

The calculation of the tariff usually has two distinct components: the fixed costs associated with the start-up of the project and debt service, and those costs that will fluctuate over the life of the project and which need to be indexed. In the first category, it is important to bear in mind the costs associated with the use of specific technologies. For example, it is often more expensive to insure projects employing First of a Kind (FOAK) technologies. In the second category, the PPA must deal with indexation of the major variable cost components of the project. These may include the price of labour (including highly skilled technicians and engineers), construction costs, interest rates, operating and maintenance cost increases, fluctuations in the fuel price (if transportation costs are a material component of the project) and decommissioning costs. This means in turn that drafters and negotiators of the PPA must be comfortable that the information and reports that the parties will use to calculate the tariff are reasonably reliable. As the recent crisis involving the determination of the London Interbank Lending Rate (LIBOR) has shown, an unreliable indexation method could have all kinds of unanticipated consequences.

Of material importance in most PPAs is the manner in which these costs and the costs associated with any changes in law and taxes are passed on to end-users. Particular attention should be paid to whether the PPA is structure on a "take or pay" basis, or on an "as available", energy-only basis. In a take-orpay contract, the project agrees to sell to the power purchaser its output up to a certain annual amount or for all that is produced.

In return, the purchaser agrees to pay the agreed-to amount for the product, without regard to whether it actually takes delivery. These different structures will have a material impact on projected revenues and therefore on bankability. Equally important is the extent to which the IPP may be incentivized to offer a lower tariff. Many jurisdictions, for example, use a Feed-In Tariff (FIT) to render technologies such as wind and solar competitive with more traditional sources of energy such as coal. From the available data, as of 2010, feed-in tariff policies have been enacted in over 50 countries, including Algeria, Kenya and Tanzania.

Of course there are other provisions in a PPA that are material to the revenue stream. These include testing, metering, processes for settlement and invoicing, and accurate and reliable financial models.


Once the revenue stream has been established, the remaining primary objective of all stakeholders is to ensure that the PPA remains in force during the entire term of the project and that the risk of force majeure and other adverse events is appropriately allocated and mitigated (see for example the discussion below regarding Political Risk).

In sub-Saharan Africa, PPA lengths have ranged from 5-6 years to 30 years from the Commercial Operation Date (being the date on which the power generating plant in question has been commissioned and tested and is ready to commence power production). There is a clear concentration in a range of 15 to 25 years. Duration should be carefully considered. On the one hand, the IPP should be given sufficient time within which to recoup its investment. On the other hand, the longer the duration, the more expensive the contract may be for the power purchaser and government.

For the negotiators and drafters of the PPA, the length of the term introduces a number of complexities. The most important of these include the legal and economic changes that may occur during the life of the project and that may impact on the pricing provisions of the PPA.

Regarding changes in law, for example, in several jurisdictions, most prominently in the member states of the European Union, renewable energy projects are awarded tradable emissions reductions credits. To our knowledge, such markets are not yet well developed on the African continent, but what is important in an African PPA is that the benefits and risks that are associated with changes in law are adequately dealt with, in anticipation of these markets also developing here. For example, the establishment of a carbon tax might significantly increase the price of power and make emissions credits from energy projects significantly more valuable.

Regarding economic changes, PPAs tend not to have sufficient flexibility in the face of unexpected economic changes. For example, exchange rate movements can put considerable pressure on treasury, particularly where a project is committed to purchase prices denominated in US dollars, while having to on-sell power in the local currency. The absence of appropriate financial hedging instruments for such long-term contracts usually adds to the problem, leaving government with a heavy and uncertain financial burden, ultimately passed on to the consumer.

Another example would be the advent of the European Electricity Exchange, which demonstrates the trend internationally for markets to move away from a highly regulated, tariff-based industry towards a free-market system in which electricity is bought and sold on an energy exchange, much as shares in listed companies are today traded on the African stock and bond exchanges. Most IPPs would not survive a change of this magnitude and accordingly it is important for the PPA to include termination provisions that will enable all of the stakeholders to exit from the PPA in a fair manner, for example through the mechanism of a government buy-out.

Political Risk

When it comes to investing on the African continent, despite attractive rates of return, investors are still apparently preoccupied with issues of political risk, which would include events such as expropriation, currency inconvertibility, changes to the tariff and changes in the regulatory and tax regimes. It is the duty of those negotiating and drafting the PPA to ensure that these risks are appropriately allocated and mitigated.

How risk is allocated is usually a function of the respective parties' bargaining power, but also of larger socio-economic and political factors within a given jurisdiction, such as a lack of clear energy policy and a lack of confidence in the judicial process and the ability of local courts, mediators and arbitrators to give effect to negotiated agreements. For example, in a competitive bidding environment, the more concerns the government has about its country's ability to attract Foreign Direct Investment (FDI) and the greater the demand for power, the more likely that government will be to take on risk. However, after successive rounds of successful bidding and the closer the government gets to reaching its power supply targets, the more likely it will be to push risk down to the IPP.

This element of governmental involvement in power projects sometimes leads to the conclusion of a contract directly between the government and the IPP, in addition to the PPA. In the African context, these agreements are usually referred to as the Implementation Agreements (IAs). It is interesting to note that this appears to be an exclusively African phenomenon - we are not aware of Implementation Agreements being used in any other countries.

Where the bargaining position of the power purchaser/government is strong relative to that of the IPP, one may find issues of political risk tucked away somewhere in the PPA, most commonly in the Force Majeure clause. When a PPA is structured in this way, it is important not to read this clause in isolation, but again to evaluate its impact on the pricing provisions of the PPA. For example, the costs associated with political risk insurance are often extensive and should be included in the calculation of LEC. It is also important to ascertain the extent to which the power purchaser remains liable to pay for contracted capacity, as opposed to actual power generated, in circumstances where the IPP is affected by a Force Majeure event or any similar provisions in terms of which the offtaker remains liable to compensate the IPP for lost revenues as a result of a Force Majeure event.

Where the bargaining position of the parties is reversed, the issue of political risk will be dealt with head-on, usually in the form of government guarantees / indemnities against the losses that the IPP and its sponsors and funders may suffer as a result of politically motivated interventions such as expropriation of project site. When read in conjunction with credit ratings by agencies such as Standard & Poor, and surveys such as the "Ease of Doing Business" rankings published by the World Bank, these guarantees may often make or break a deal for international investors.

Currently, in terms of the World Bank's ranking according to the "Protecting Investors" criterion for instance, South Africa is ranked highest of the African countries at number 10, followed by Rwanda and Sierra Leone at 29, Botswana, Burundi, Ghana and Mozambique at 46, Angola, Madagascar and Nigeria at 65, Algeria, Egypt, Malawi, Namibia and Zambia at 79, and Morocco, Tanzania and Kenya at 97 (how closely these figures tally with peoples' experience of doing business in the different African countries is a different story).

Step-in Rights

The security arrangements required by power purchasers, banks and other financial institutions are often extensive in the context of energy projects and commonly consist of a combination of parent company guarantees, cash escrows, bonds over the IPP's land, plant and equipment, reserve funds, letters of credit and control over the IPP's bank accounts exercised by the funders or their agent.

Unique to project financing are the operational step-in rights commonly afforded to funders, or their agent in the case of a syndication. In principle, these rights afford the lenders or their agent the right to step in to major project contracts, including most importantly the PPA, effectively taking the place of the IPP and thereby taking over the business of the IPP. In practice, it remains unusual in our experience for banks and other financial institutions to actually take over the running of a business in this way. The threat that they may do so is what makes these provisions effective.

Dispute Resolution

Dispute Resolution clauses in a PPA are also very important and this is usually a choice between arbitration and litigation. A good PPA will usually contain several layers of dispute resolution and define a clear process as to when and how parties can invoke the various layer of dispute resolution. A dispute resolution alternative that has become popular in the past decade in the resolution of commercial disputes is the use of the World's Bank International Centre for settlement of investment disputes.


As at the date of this article, the available data suggest that much of Africa is still, from a modern energy perspective, an organic economy: 97% of its Total Primary Energy Supply (TPES) comes from biofuels, such as water and firewood, and renewal waste. Electricity generation using renewable energy technology is still largely a pipe dream. "High tech" renewables (solar, wind and geothermal) represent only 0.4% of total TPES. Solar is largely concentrated in Egypt, Morocco and Tunisia, whereas geothermal technology is only available in Kenya and Ethiopia.

When it comes to implementing power projects, experienced practitioners estimate that only 1 in 10 projects ever make it to Financial Close.

In this context, we hope that some of the ideas highlighted in this article about the clauses to look out for in PPAs will help stakeholders to navigate what is undoubtedly a challenging process and we wish the DoE, Eskom and all IPPs and sponsors involved in the DoE's IPP Bid Process lots of success.

Background to this Legal Brief

Werksmans directors Lize Louw and Nozipho Bhengu recently attended a Master Class in "African PPA Management" presented by Dr Manfred Raschke, President at International Strategic Information Services (ISIS) from Boston in the United States.

Dr Raschke is a world-renowned expert with 29 years of experience as consultant in the international and domestic coal, natural gas and electric power industries. This Legal Brief is based on some of the issues discussed during the course of this Master Class.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on

Click to Login as an existing user or Register so you can print this article.

Some comments from our readers…
“The articles are extremely timely and highly applicable”
“I often find critical information not available elsewhere”
“As in-house counsel, Mondaq’s service is of great value”

Mondaq Advice Centre (MACs)
Up-coming Events Search
Font Size:
Mondaq on Twitter
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
Email Address
Company Name
Confirm Password
Mondaq Topics -- Select your Interests
 Law Performance
 Law Practice
 Media & IT
 Real Estate
 Wealth Mgt
Asia Pacific
European Union
Latin America
Middle East
United States
Worldwide Updates
Check to state you have read and
agree to our Terms and Conditions

Terms & Conditions and Privacy Statement (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

Use of

You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.


Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.


Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.

Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

If you do not want us to provide your name and email address you may opt out by clicking here .

If you do not wish to receive any future announcements of products and services offered by Mondaq by clicking here .

Information Collection and Use

We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to with “no disclosure” in the subject heading

Mondaq News Alerts

In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.


A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

Log Files

We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.


This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

Surveys & Contests

From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.


If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.


This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to

Correcting/Updating Personal Information

If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to

Notification of Changes

If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

How to contact Mondaq

You can contact us with comments or queries at

If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at and we will use commercially reasonable efforts to determine and correct the problem promptly.