Ireland: Second Time Lucky? The Building Control (Amendment) Regulations 2014

Last Updated: 4 March 2014
Article by Niav O'Higgins and Mary Liz Mahony
Most Read Contributor in Ireland, October 2018

Just as members of the Construction Industry and practitioners were preparing for the Building Control (Amendment) Regulations 2013 (the "2013 Regulations") to become operative this March, the Building Control (Amendment) Regulations 2014 (the "2014 Regulations") were signed into law! Replacing the 2013 Regulations, the 2014 Regulations are the second attempt by the legislature to introduce a new regime for compliance with Building Regulations.

The 2014 Regulations refine and clarify the changes introduced by the 2013 Regulations and, it appears, address some of the more controversial elements of the earlier regulations. The 2014 Regulations will still become operative on 1 March 2014 and it is imperative for affected parties (including building owners) to be aware of their new obligations.

The Key Feature of the 2014 Regulations

The 2014 Regulations retain the same structure as the 2013 Regulations by introducing a new form of commencement notice, together with the introduction of three new types of mandatory certificates, in prescribed form;

  1. Certificate of Compliance (Design) (the "Design Certificate")
  2. Certificate of Compliance (Undertaking by Assigned Certifier) / Certificate of Compliance (Undertaking by Builder) (together, the "Undertakings") and
  3. Certificate of Compliance on Completion (the "Completion Certificate").

The 2014 Regulations require a continued focus on compliance with Building Regulations, from design stage to completion. Prior to the works commencing, the design of the works must be certified as complying with Building Regulations by the execution of the Design Certificate by the "Design Certifier". The building owner will also nominate at commencement stage (through notices in prescribed form) an "Assigned Certifier" and a "Builder". The "Assigned Certifier" and "Builder" will be tasked with confirming that the completed works comply with Building Regulations by executing the Completion Certificate and must also formally undertake to carry out this task at commencement stage.

The 2014 Regulations are intended to work in tandem with a "Code of Practice for Inspecting and Certifying Buildings and Works" which will inform the Assigned Certifier, Builder, Design Certifier and other parties, how to manage their respective roles including the preparation of an inspection plan, carrying out inspections and ultimately certifying the works. The final approved version of the Code was made available at the end of the first week in February 2014.

The Commencement Notice

While the requirement to submit a Commencement Notice is not new, Article 9 now requires that a Commencement Notice in prescribed form be submitted with the following documentation:

  1. such plans, calculations, specifications and particulars as are necessary to outline how the proposed works or building will comply with the requirements of the Second Schedule of the Building Regulations, including general arrangement drawings and a schedule of such plans, etc as are currently designed or as are to be prepared at a later date;
  2. the Design Certificate;
  3. the Notice of Assignment of Person to Inspect and Certify Works (Assigned Certifier) and Notice of Assignment of Builder;
  4. The Undertakings (both of the Assigned Certifier and Builder);

In addition, an online assessment regarding the proposed approach to compliance with the Regulations must be completed and a Preliminary Inspection Plan prepared by the Assigned Certifier submitted.

The Commencement Notice can now be submitted electronically on the online "Building Control Management System" or by hard copy. If documents are submitted in hard copy, the Building Control Authority will have the option of charging an administration fee.

The 2014 Regulations also make a number of amendments to the "7 Day Notice". This is the form of Notice which is to be submitted where it is proposed to commence work before the grant of a fire safety certificate. In this regard, the 7 Day Notice essentially replaces the Commencement Notice and must be accompanied by the application for fire safety certification and the documentation supporting the fire safety application, as opposed to the fire safety certificate. The form of 7 Day Notice is set out in the third schedule to the 2014 Regulations, and must be accompanied by similar documentation, Notices and Certificates as required with a Commencement Notice.

It is clear from the above that the requirements are detailed, and parties involved in the building process will need to be focussed on compliance with these requirements from the outset.

The Design Certificate

This Certificate, to be completed by the Design Certifier (a registered architect, builder surveyor or chartered engineer) must be submitted with the Commencement Notice, and requires confirmation that the plans etc., included with the Commencement Notice demonstrate compliance with the applicable requirements of the Building Regulations, with the designer certifying that "having exercised reasonable skill care and diligence, that, having regard to the plans, calculations...which have been prepared by me and others and having relied on ancillary certificates and particulars...the proposed design for the building or works is in compliance with the requirements of the Second Schedule to the Building Regulations".

The reference to "ancillary certificates" is notable, and reflects the fact that, owing to the different design disciplines that may have input into the overall design of a building, one building designer could not stand over the design without relying on others. While details in respect of the role of the ancillary certifier are absent from the main body of the 2014 Regulations, further guidance is contained in the Code of Practice.

Inspection and Certification of the Works – Assigned Certifier and Builder

The Assigned Certifier must also be a registered architect, building surveyor or chartered engineer and will be required to provide an undertaking, submitted with the Commencement Notice, to inter alia, "use reasonable skill, care and diligence, to inspect the building or works and to coordinate the inspection works of others and to certify following the implementation of the inspection plan by myself and others, for compliance with the requirements of the Second Schedule to the Building Regulations".

The same person must also execute Part B of the Completion Certificate confirming that "the inspection plan drawn up having regard to the Code of Practice...has been undertaken by the under-signed having exercised reasonable skill, care and diligence, and by others nominated therein, as appropriate, on the basis that all have exercised reasonable skill, care and diligence in certifying their work in the ancillary certificates scheduled...Based on the above, and relying on the ancillary certificates scheduled, I now certify, having exercised reasonable skill, care and diligence, that the building or works is in compliance..."

The Builder will also be required to provide an undertaking, submitted with the Commencement Notice, identifying the works which he has been commissioned to undertake and confirming his own competence and those employed and engaged by him, to undertake such works. Further the Builder must also undertake to construct the works in accordance with the plans etc., submitted (or subsequently issued to him) and to cooperate with the inspections set out in the inspection plan prepared by the Assigned Certifier. The Builder must also execute Part A of the Completion Certificate certifying that, having exercised reasonable skill, care and diligence that the works as completed have been constructed in accordance with the design documents submitted and reliant on this, the works are in compliance with Building Regulations.

The Undertaking and the Completion Certificate are specifically required to be signed by a "Principal or Director of a building company only" and both documents provide an entry for the Builder's "Construction Industry Register Ireland registration number". A new registry of builders has been set up in this regard (www.ciri.ie). The registry is voluntary at present but may become mandatory in the near future.

Completion

As outlined above, the Completion Certificate, executed by both the Assigned Certifier and the Builder, must be submitted to the Building Control Authority. The Completion Certificate must be accompanied by (i) such plans etc., as are required to outline how the completed works differ from the plans submitted at commencement stage, (ii) such plans as are required to outline how the completed works  comply with the Building Regulations and (iii) the Inspection Plan implemented by the Assigned Certifier.

Works or buildings cannot be "opened, occupied or used" until the relevant particulars of the Certificate of Compliance on Completion are entered on a statutory register to be kept by the Building Control Authority. However, the 2014 Regulations provide that the Completion Certificate may refer to "works, buildings, including areas within a building, or developments, including phases thereof...",  indicating that works can be completed in stages if necessary.

Conclusions

The road to the 2014 Regulations has been a bumpy one, but on the eve of the effective date, it is imperative that parties start engaging with these new requirements and understanding their implications. The intention of the 2014 Regulations is to focus all parties on compliance with Building Regulations, from the inception of the works, by requiring the development of an inspection plan at the earliest stages and having all parties (including builders) formally acknowledge their respective roles, from day one.

Being ready for the effective date will mean different things for different players in the industry. Building owners, for example, will need to consider how and when to make the new appointments to allow time to deliver the Commencement Notice and all its constituent parts. Those intending to act as certifiers (including ancillary certifiers) or builders must consider how these roles need to be carried out to ensure a smooth inspection process that is flexible enough to adapt to changes during the life of a project but one that follows the Code of Practice and allows the Completion Certificate to be signed in confidence. Regardless of the role taken, parties need to ensure that they are not left behind.

This article contains a general summary of developments and is not a complete or definitive statement of the law. Specific legal advice should be obtained where appropriate.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Similar Articles
Relevancy Powered by MondaqAI
Mason Hayes & Curran
Arthur Cox
 
In association with
Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Mason Hayes & Curran
Arthur Cox
Related Articles
 
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions