Ireland: Second Time Lucky? The Building Control (Amendment) Regulations 2014

Last Updated: 4 March 2014
Article by Niav O'Higgins and Mary Liz Mahony

Just as members of the Construction Industry and practitioners were preparing for the Building Control (Amendment) Regulations 2013 (the "2013 Regulations") to become operative this March, the Building Control (Amendment) Regulations 2014 (the "2014 Regulations") were signed into law! Replacing the 2013 Regulations, the 2014 Regulations are the second attempt by the legislature to introduce a new regime for compliance with Building Regulations.

The 2014 Regulations refine and clarify the changes introduced by the 2013 Regulations and, it appears, address some of the more controversial elements of the earlier regulations. The 2014 Regulations will still become operative on 1 March 2014 and it is imperative for affected parties (including building owners) to be aware of their new obligations.

The Key Feature of the 2014 Regulations

The 2014 Regulations retain the same structure as the 2013 Regulations by introducing a new form of commencement notice, together with the introduction of three new types of mandatory certificates, in prescribed form;

  1. Certificate of Compliance (Design) (the "Design Certificate")
  2. Certificate of Compliance (Undertaking by Assigned Certifier) / Certificate of Compliance (Undertaking by Builder) (together, the "Undertakings") and
  3. Certificate of Compliance on Completion (the "Completion Certificate").

The 2014 Regulations require a continued focus on compliance with Building Regulations, from design stage to completion. Prior to the works commencing, the design of the works must be certified as complying with Building Regulations by the execution of the Design Certificate by the "Design Certifier". The building owner will also nominate at commencement stage (through notices in prescribed form) an "Assigned Certifier" and a "Builder". The "Assigned Certifier" and "Builder" will be tasked with confirming that the completed works comply with Building Regulations by executing the Completion Certificate and must also formally undertake to carry out this task at commencement stage.

The 2014 Regulations are intended to work in tandem with a "Code of Practice for Inspecting and Certifying Buildings and Works" which will inform the Assigned Certifier, Builder, Design Certifier and other parties, how to manage their respective roles including the preparation of an inspection plan, carrying out inspections and ultimately certifying the works. The final approved version of the Code was made available at the end of the first week in February 2014.

The Commencement Notice

While the requirement to submit a Commencement Notice is not new, Article 9 now requires that a Commencement Notice in prescribed form be submitted with the following documentation:

  1. such plans, calculations, specifications and particulars as are necessary to outline how the proposed works or building will comply with the requirements of the Second Schedule of the Building Regulations, including general arrangement drawings and a schedule of such plans, etc as are currently designed or as are to be prepared at a later date;
  2. the Design Certificate;
  3. the Notice of Assignment of Person to Inspect and Certify Works (Assigned Certifier) and Notice of Assignment of Builder;
  4. The Undertakings (both of the Assigned Certifier and Builder);

In addition, an online assessment regarding the proposed approach to compliance with the Regulations must be completed and a Preliminary Inspection Plan prepared by the Assigned Certifier submitted.

The Commencement Notice can now be submitted electronically on the online "Building Control Management System" or by hard copy. If documents are submitted in hard copy, the Building Control Authority will have the option of charging an administration fee.

The 2014 Regulations also make a number of amendments to the "7 Day Notice". This is the form of Notice which is to be submitted where it is proposed to commence work before the grant of a fire safety certificate. In this regard, the 7 Day Notice essentially replaces the Commencement Notice and must be accompanied by the application for fire safety certification and the documentation supporting the fire safety application, as opposed to the fire safety certificate. The form of 7 Day Notice is set out in the third schedule to the 2014 Regulations, and must be accompanied by similar documentation, Notices and Certificates as required with a Commencement Notice.

It is clear from the above that the requirements are detailed, and parties involved in the building process will need to be focussed on compliance with these requirements from the outset.

The Design Certificate

This Certificate, to be completed by the Design Certifier (a registered architect, builder surveyor or chartered engineer) must be submitted with the Commencement Notice, and requires confirmation that the plans etc., included with the Commencement Notice demonstrate compliance with the applicable requirements of the Building Regulations, with the designer certifying that "having exercised reasonable skill care and diligence, that, having regard to the plans, calculations...which have been prepared by me and others and having relied on ancillary certificates and particulars...the proposed design for the building or works is in compliance with the requirements of the Second Schedule to the Building Regulations".

The reference to "ancillary certificates" is notable, and reflects the fact that, owing to the different design disciplines that may have input into the overall design of a building, one building designer could not stand over the design without relying on others. While details in respect of the role of the ancillary certifier are absent from the main body of the 2014 Regulations, further guidance is contained in the Code of Practice.

Inspection and Certification of the Works – Assigned Certifier and Builder

The Assigned Certifier must also be a registered architect, building surveyor or chartered engineer and will be required to provide an undertaking, submitted with the Commencement Notice, to inter alia, "use reasonable skill, care and diligence, to inspect the building or works and to coordinate the inspection works of others and to certify following the implementation of the inspection plan by myself and others, for compliance with the requirements of the Second Schedule to the Building Regulations".

The same person must also execute Part B of the Completion Certificate confirming that "the inspection plan drawn up having regard to the Code of Practice...has been undertaken by the under-signed having exercised reasonable skill, care and diligence, and by others nominated therein, as appropriate, on the basis that all have exercised reasonable skill, care and diligence in certifying their work in the ancillary certificates scheduled...Based on the above, and relying on the ancillary certificates scheduled, I now certify, having exercised reasonable skill, care and diligence, that the building or works is in compliance..."

The Builder will also be required to provide an undertaking, submitted with the Commencement Notice, identifying the works which he has been commissioned to undertake and confirming his own competence and those employed and engaged by him, to undertake such works. Further the Builder must also undertake to construct the works in accordance with the plans etc., submitted (or subsequently issued to him) and to cooperate with the inspections set out in the inspection plan prepared by the Assigned Certifier. The Builder must also execute Part A of the Completion Certificate certifying that, having exercised reasonable skill, care and diligence that the works as completed have been constructed in accordance with the design documents submitted and reliant on this, the works are in compliance with Building Regulations.

The Undertaking and the Completion Certificate are specifically required to be signed by a "Principal or Director of a building company only" and both documents provide an entry for the Builder's "Construction Industry Register Ireland registration number". A new registry of builders has been set up in this regard (www.ciri.ie). The registry is voluntary at present but may become mandatory in the near future.

Completion

As outlined above, the Completion Certificate, executed by both the Assigned Certifier and the Builder, must be submitted to the Building Control Authority. The Completion Certificate must be accompanied by (i) such plans etc., as are required to outline how the completed works differ from the plans submitted at commencement stage, (ii) such plans as are required to outline how the completed works  comply with the Building Regulations and (iii) the Inspection Plan implemented by the Assigned Certifier.

Works or buildings cannot be "opened, occupied or used" until the relevant particulars of the Certificate of Compliance on Completion are entered on a statutory register to be kept by the Building Control Authority. However, the 2014 Regulations provide that the Completion Certificate may refer to "works, buildings, including areas within a building, or developments, including phases thereof...",  indicating that works can be completed in stages if necessary.

Conclusions

The road to the 2014 Regulations has been a bumpy one, but on the eve of the effective date, it is imperative that parties start engaging with these new requirements and understanding their implications. The intention of the 2014 Regulations is to focus all parties on compliance with Building Regulations, from the inception of the works, by requiring the development of an inspection plan at the earliest stages and having all parties (including builders) formally acknowledge their respective roles, from day one.

Being ready for the effective date will mean different things for different players in the industry. Building owners, for example, will need to consider how and when to make the new appointments to allow time to deliver the Commencement Notice and all its constituent parts. Those intending to act as certifiers (including ancillary certifiers) or builders must consider how these roles need to be carried out to ensure a smooth inspection process that is flexible enough to adapt to changes during the life of a project but one that follows the Code of Practice and allows the Completion Certificate to be signed in confidence. Regardless of the role taken, parties need to ensure that they are not left behind.

This article contains a general summary of developments and is not a complete or definitive statement of the law. Specific legal advice should be obtained where appropriate.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
In association with
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Check to state you have read and
agree to our Terms and Conditions

Terms & Conditions and Privacy Statement

Mondaq.com (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

Use of www.mondaq.com

You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about Mondaq.com’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.

Disclaimer

Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.

Registration

Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.

Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

If you do not want us to provide your name and email address you may opt out by clicking here .

If you do not wish to receive any future announcements of products and services offered by Mondaq by clicking here .

Information Collection and Use

We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to unsubscribe@mondaq.com with “no disclosure” in the subject heading

Mondaq News Alerts

In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.

Cookies

A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

Log Files

We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.

Links

This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

Surveys & Contests

From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.

Mail-A-Friend

If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.

Security

This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to webmaster@mondaq.com.

Correcting/Updating Personal Information

If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to EditorialAdvisor@mondaq.com.

Notification of Changes

If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

How to contact Mondaq

You can contact us with comments or queries at enquiries@mondaq.com.

If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at problems@mondaq.com and we will use commercially reasonable efforts to determine and correct the problem promptly.