From 21 October 2010, a developer is required to prove that it owns the land or has a realistic prospect of controlling the land before the Building Authority will process the building plans. A validity period will also be imposed for granting modifications/ exemptions from the Buildings Ordinance.

By a letter from the Building Authority (the "BA") dated 20 October 2010 (the "BA's Letter") addressed to the authorised persons, registered structural engineers and registered geotechnical engineers, the BA promulgated the following new practice (the "New Practice") adopted by it with effect from 21 October 2010:

  1. An applicant in submitting general building plans ("GBP") to the BA for approval should provide particulars and documentary proof of ownership or realistic prospect of control of the land forming the site (the "Ownership Proof Requirement").
  2. A time limit, generally speaking two years, will be imposed by the BA on the granting of modifications or exemptions (the "Modification/Exemption Time Limit Requirement") of or from the provisions of the Buildings Ordinance (the "BO").

PDF version of the BA's Letter can be found in "What's New" session (October 2010) in the Buildings Department's webpage: http://www.bd.gov.hk/english/whats.html.

The New Practice constitutes fundamental changes to the long-standing practice established in the development industry, made without any prior consultation.

Ownership Proof Requirement

According to paragraph one of the BA's Letter, an applicant, when submitting GBP to the BA for approval, is required to submit a Form BA5 and particulars of ownership or realistic prospect of control of the land forming the site, together with the required documentary proof.

Paragraph two goes on to say that failure to provide such particulars or documentary proof may lead the BA to refuse to give his approval of GBP under section 16(1) of the BO.

BA'S LONG-STANDING PRACTICE DOES NOT REQUIRE PROOF OF OWNERSHIP

The stated purpose of the Ownership Proof Requirement, as given in paragraph one of the BA's Letter, was that the BA has always taken the stance that the site of a proposed building for the purpose of the BO "can only include land which the applicant owns or which he has a realistic prospect of control".

However, quite contrary to the stated purpose, it has all along been the practice of the BA, before the introduction of the Ownership Proof Requirement, that (a) a person need not own or control the land forming the site before he can apply for approval of any GBP for the site because, under the BO and its subsidiary legislation, there is no such requirement and (b) the BA did not require applicants to submit any particular or documentary proof regarding the ownership or control of a site in considering the GBP.

OWNERSHIP IS NOT A PRE-REQUISITE FOR APPROVAL OF GBP UNDER THE BO

Section 16(1) of the BO sets out the grounds on which the BA may refuse to give his approval of GBP. As a matter of law, the BA is only entitled to refuse to give his approval of GBP on one or more of the grounds set out in section 16(1) of the BO.

The fact that an applicant is not an owner of the site or does not have an interest in a site is not an express ground on which the BA may refuse to give his approval of GBP under section 16(1) of the BO.

PRIVY COUNCIL'S DECISION IN CHENG YICK CHI

It appears that the requirement that an applicant should have a "realistic prospect of controlling" a site is derived from the judgment of the Privy Council in the case of Attorney General v. Cheng Yick Chi [1983] 1 HKC 14.

The Privy Council, in delivering its judgement in Cheng Yick Chi, said, at pages 19H to 20A, the following :-

"Their Lordships are of the opinion that the land which forms a 'site' for the purposes of the Regulations must be ascertained as a question of fact in the case of each development. It means, in addition to the land on which it is proposed to erect buildings, any land which the developer bona fide proposes to include in the development. It can only include land which he owns or which he has a realistic prospect of controlling. The additional land must be at least sufficient to enable the proposed building to comply with the Regulations and it must, of course, not have been taken into account and, so to speak, used up in enabling some other existing building to comply with the Regulations." (Emphasis added.)

However, it is to be noted that:

  1. The issue in Cheng Yick Chi was whether the land in front of certain houses at a site (On Hing Terrace in that case) which was unbuilt upon and which had been dedicated to the public for passage may be included as part of the "site" for plot ratio and site coverage calculations.
  2. The quoted passage in Cheng Yick Chi was therefore made only in the context of what can or cannot be included in a "site" for the purpose of plot ratio and site coverage calculations.
  3. Accordingly, the question as to whether the Building Authority is entitled to reject GBP unless the developer actually owns or has a realistic prospect of controlling the site was not the issue before the Privy Council in Cheng Yick Chi.

UNCERTAINTIES CREATED BY THE OWNERSHIP PROOF REQUIREMENT

In any event, even assuming for the present purpose that the BA is entitled to require proof of ownership, the question of whether the applicant has a "realistic prospect of controlling the site" is always debatable, as no guidance has been provided in the BA's Letter as to how and to what extent an applicant will be regarded as having a "realistic prospect of controlling the site".

The Ownership Proof Requirement has created a lot of uncertainties to the industry. To name a few:

  1. What is the threshold for determining whether an applicant has a "realistic prospect of controlling the site"? What are the criteria for determining whether such threshold is reached? What are the rationale and justifications for the BA to adopt such threshold and criteria?
  2. If the site in question involves the acquisition of units in existing buildings, and if the applicant is in the process of amalgamating the site by acquiring some interest (say, several units) in the site, then
  1. would such applicant, who has only acquired some but not all the units in the existing buildings, be regarded as having a "realistic prospect of controlling" the site?
  2. whether and, if so, how and to what extent the applicant is required to demonstrate that he is making genuine efforts in acquiring the remaining interests in the site?
  3. how many units have to be acquired by the applicant before he will be regarded as having a "realistic prospect of controlling the site"? Is it sufficient for the applicant to acquire over, say, 10% of the units in the site?
  4. would the answer to the above questions be different if the applicant may have to invoke the Land (Compulsory Sale for Redevelopment) Ordinance to apply to the Lands Tribunal for an order for compulsory sale of the building within the site at a later stage?

Modification/ Exemption Time Limit Requirement

Under section 42(1) of the BO, where in the opinion of the BA special circumstances render it desirable, the BA may permit by notice in writing modification of the provisions of the BO.

The exemptions/ modifications requested to be granted by the BA usually relate to the exemption of certain areas of a site from gross floor area/ plot ratio calculations (e.g., carparks, green features).

By introducing the Modification/Exemption Time Limit Requirement, as stated in paragraph four of the BA's Letter, the BA is now saying that:

  1. A time limit, generally speaking two years, should be imposed as a condition in the permit (Form BD106) when modifications or exemptions under section 42 are granted (the "Modification/ Exemption Time Limit").
  2. Amendment GBP based on any previously approved GBP in relation to which the Modification/Exemption Time Limit has expired may be refused under section 16(1)(d) of the BO.
  3. Application for consent to commence the building works shown in the previously approved GBP in relation to which the Modification/Exemption Time Limit has expired may also be refused under section 16(3)(d) of the BO.

VALIDITY OF APPROVED GBP

Under section 16(3)(d) of the BO, the BA may refuse to give his consent to the commencement of any building works where a period exceeding two years has elapsed since the approval of the GBP.

In a Practice Note for Authorised Person and Structural Engineers (PNAP 215 re-issued as APP-97, "PNAP 215"), it is provided in paragraph 14 that, whilst the BO does not prescribe a validity period of approved GBP, section 16(3)(d) of the BO provides the BA with the opportunity to review any GBP that are approved more than two years ago upon application for consent to commence works.

The industry has therefore adopted the following practice:

  1. Prior to the expiration of the two-year period for the purpose of section 16(3)(d) of the BO, amendment GBP (incorporating minor amendments) would be submitted to the BA for approval.
  2. Once the amended GBP have been approved, then the two-year time period for the purpose of section 16(3)(d) would start to run again.

However, the introduction of the Modification/Exemption Time Limit cast doubt as to whether the industry can still adopt this practice to have the two-year time period starting to run again.

APPLICATION FOR AMENDMENT GBP BASED ON PREVIOUSLY APPROVED GBP

Section 16(1)(d) of the BO provides that the BA may refuse to give his approval of GBP on the ground that the carrying out of building works shown on the GBP would contravene, among other things, the provisions of the BO or of any other enactment.

Assuming that a developer submits amendment GBP based on the previously approved GBP before the expiration of the Modification/Exemption Time Limit :-

  1. According to what was said in paragraph four of the BA's Letter, such amendment GBP will not be rejected by the BA under section 16(1)(d) of the BO because the Modification/Exemption Time Limit has not yet expired.
  2. However, it is unclear from the said paragraph four whether the Modification/ Exemption Time Limit imposed by the BA in approving the previously approved GBP will start to run again as from the date on which the BA approves the amendment GBP.
  3. If the Modification/Exemption Time Limit will not start to run again as from the date on which the BA approves the amendment GBP, then this would mean that even if the BA approves the amendment GBP, such approval will not allow the developer to enjoy another two-year time period as mentioned above because the Modification/Exemption Time Limit would in any event expire two years from the date on which the original GBP were approved.

APPLICATION FOR CONSENT TO COMMENCE BUILDING WORKS

It is also doubtful whether the BA is entitled to rely on section 16(3)(d) of the BO to refuse to give his consent to commencement of building works on the ground of expiration of the Modification/ Exemption Time Limit :

  1. The BA's power to refuse to give his consent to the commencement of building works under section 16(3)(d) of the BO is specifically confined to the situation where a period of two years has elapsed since the approval of the GBP.
  2. Further, paragraph 14 of PNAP 215 provides that the BA will invoke section 16(3)(d) of the BO to refuse consent if the building works do not comply with the current standards specified in the BO and allied regulations. It would appear that the expiration of the Modification/ Exemption Time Limit cannot be regarded as non-compliance with the current standards specified in the BO and allied regulations.
  3. In any event, the expiration of the Modification/Exemption Time Limit is not a ground specified in any of the paragraphs in section 16(3) of the BO which entitles the BA to refuse to give his consent to commence building works.

ACTUAL PERIOD OF THE MODIFICATION/EXEMPTION TIME LIMIT

Paragraph four of the BA's Letter provides that, generally speaking, the Modification/Exemption Time Limit will be for a period of two years.

This seems to suggest that the actual Modification/Exemption Time Limit could be longer or shorter than two years.

However, no reason has been given as to why two years have been specified and no guidance has been given as to the circumstances under which the BA will determine a period which is longer or shorter than two years.

Conclusion

The New Practice adopted by the BA (a) constitutes a fundamental change to the long-standing practice adopted by the BA in GBP approval process as well as the current system established under the BO and its subsidiary legislation and (b) has created a lot of uncertainties, practical problems and difficulties to the development industry.

When the BA introduces a new practice or policy, the BA will normally issue a formal Practice Note for Authorised Persons and Structural Engineers and will conduct consultations beforehand. However, it is very strange that the BA (a) did not conduct any prior consultation with the development industry, the relevant professional bodies/ associations and other stakeholders on the New Practice and (b) announced the New Practice only by way of a letter instead of formally issuing a new Practice Note.

We consider that the BA should:

  1. conduct thorough consultations with the development industry, the relevant professional bodies and associations and other stakeholders before implementing the New Practice;
  2. clarify the issues and uncertainties in its implementation as suggested above; and
  3. only introduce such New Practice as is appropriate after thorough consultations.

Learn more about our Hong Kong office, Construction & Engineering and Real Estate practices.

Visit us at www.mayerbrownjsm.com

Copyright 2010. JSM, Mayer Brown International LLP and/or Mayer Brown LLP. All rights reserved. Mayer Brown is a global legal services organization comprising legal practices that are separate entities ("Mayer Brown Practices"). The Mayer Brown Practices are: JSM, a Hong Kong partnership, and its associated entities in Asia; Mayer Brown International LLP, a limited liability partnership incorporated in England and Wales; and Mayer Brown LLP, a limited liability partnership established in the United States. The Mayer Brown Practices are known as Mayer Brown JSM in Asia.

This article provides information and comments on legal issues and developments of interest. The foregoing is not a comprehensive treatment of the subject matter covered and is not intended to provide legal advice. Readers should seek specific legal advice before taking any action with respect to the matters discussed herein. Please also read the JSM legal publications Disclaimer.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
Some comments from our readers…
“The articles are extremely timely and highly applicable”
“I often find critical information not available elsewhere”
“As in-house counsel, Mondaq’s service is of great value”

Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration
Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:
  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.
  • Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.
    If you do not want us to provide your name and email address you may opt out by clicking here
    If you do not wish to receive any future announcements of products and services offered by Mondaq you may opt out by clicking here

    Terms & Conditions and Privacy Statement

    Mondaq.com (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

    Use of www.mondaq.com

    You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about Mondaq.com’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.

    Disclaimer

    Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

    The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.

    Registration

    Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

    • To allow you to personalize the Mondaq websites you are visiting.
    • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
    • To produce demographic feedback for our information providers who provide information free for your use.

    Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

    Information Collection and Use

    We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

    We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to unsubscribe@mondaq.com with “no disclosure” in the subject heading

    Mondaq News Alerts

    In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.

    Cookies

    A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

    Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

    Log Files

    We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.

    Links

    This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

    Surveys & Contests

    From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.

    Mail-A-Friend

    If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.

    Emails

    From time to time Mondaq may send you emails promoting Mondaq services including new services. You may opt out of receiving such emails by clicking below.

    *** If you do not wish to receive any future announcements of services offered by Mondaq you may opt out by clicking here .

    Security

    This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to webmaster@mondaq.com.

    Correcting/Updating Personal Information

    If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to EditorialAdvisor@mondaq.com.

    Notification of Changes

    If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

    How to contact Mondaq

    You can contact us with comments or queries at enquiries@mondaq.com.

    If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at problems@mondaq.com and we will use commercially reasonable efforts to determine and correct the problem promptly.

    By clicking Register you state you have read and agree to our Terms and Conditions