Nigeria: The Current Discontent Between The Discos And Nigerian Electricity Consumers Over Non-Compliance With The Performance Agreement On Metering

Last Updated: 17 October 2019
Article by Peter Olaoye Olalere

Peter Olalere1

  1. Introduction

Recently, 3 persons who are close to the writer shared their respective experiences with their electricity distribution companies (Discos) concerning lack of electricity meters or lack of proper metering of their respective premises and the attendant consequences; and their stories inspired this piece. The said stories have similar trajectory – featuring irrational estimated billing, accumulation of disputed electricity bills (electricity not used and bill not scientifically-computed), sharp disagreement on electricity usage, loss of time and money on the parts of both parties, the Discos' insistence that the customer should clear the outstanding (though disputed) bills as presented by the Discos, and finally cessation of relationship whereby the customer's premises is disconnected by the Discos or the customer disconnected himself from electricity supply.

By the way, the stories capture a diversified demography of the electricity consumers in Lagos, Nigeria. One is a residential premise, the second is a place of worship (a church) and the third is a commercial/industrial customer of a Disco. The first was not metered for a long time, and though was paying an average of N5,000.00 per month to the Disco, the Disco continued to issue bills ranging from N12,000.00 to N18,000.00 per month depending on which amount they 'estimated'. When the meter was later procured, the Disco insisted the customer should pay (or bring a plan for payment of) the over N350,000.00 allegedly accumulated before the customer could buy and load credit on the metering card to have access to electricity. The customer simply could not understand the commercial 'arm-twisting' involved and has been relying only on his small generating set since January 2019 till now, the Disco having since disconnected him from supply.

The second is a commercial/industrial customer who was paying between N80,000.00 to N90,000.00 per month based on the actual reading of the old meter on the premises before the said meter got damaged by fire. The customer applied for another meter and was ready to buy a replacement outright but a meter acceptable to the Disco was not available, hence the Disco was happy to resume estimated billing of the premises. Two to three months of estimated billing later, the Disco has so far billed an average of N250,000.00 per month and the premises that had no outstanding bill had suddenly accumulated over N804,000.00. Of course, the proverbial 'center could no longer hold', and the commercial/industrial customer had to go and raise money to buy industrial generator having been disconnected with the connection cables taken away by the Disco. The third customer, a parish of a popular Pentecostal church was adjudged by the Disco to have accumulated over N450,000.00 on their bill. It should be noted that the church as a place of worship clocks in about a maximum of 2 hours service twice during the week and 3 hours of service on Sundays (using only worship instruments and does not have a bakery or other energy consuming facility in the church) and had consistently paid about N10, 000 a month. Yet, the Disco continued to serve an estimated bill in the neighborhood of N45,000.00 per month on them because there was no prepaid meter. The Disco subsequently alleged that the church had accumulated a bill of over N450,000.00 on the account. In short, the church has also been operating only on diesel generator from January 2019 till now.

The above summarized stories speak to the experience of an average electricity consumer in Nigeria without prepaid meter, and people can relate to the stories. The tragedy of the situation appears to be that estimated billing does not take cognizance of the period electricity was not supplied to the premises (a very rampant occurrence), the time the transformer did not work or was switched off for repairs, the time the premises was unoccupied, the time when the customer used minimal electricity because most occupants of the premises were unavailable, or even the time the customer used maximum electricity etc. Apart from the fact that the sections 4, 5 and 6 of the Methodology for Estimated Billing Regulations in August 2012 published as Federal Government Official Gazette No. 113 in Volume 99 of 2012 are not being followed to the letter by the Discos, the methodology itself (particularly section 6 thereof) seems not to be scientific or fair, despite the detailed provisions, and the consumers are now being overcharged. There is general hostility between the field staff of the Discos who serve estimated bills on customers and those who disconnect electricity from premises and the customers, who feel cheated out of their hard-earned money to pay for electricity not consumed. The consequence is that the relationship between the Discos and the customers is fast breaking down with a level of discontent that requires a great deal of attention from the regulator.

It is still the Discos Obligation to provide prepaid meters for their Customers:

By the Key Performance Indicators (KPIs) embedded in the Performance Agreement (PA) executed by the Discos when they took over the electricity distribution business in the Nigerian Electricity Supply Industry ("NESI") in 2013, the obligation to progressively bridge the metering gap remains that of the Discos. By the PAs commenced on 1st January 2015 with a 5-year lifespan, for most Discos (which is due for review in December 2019, with the exception of the Kaduna Disco), the obligation to meter the customers remains that of the Discos. Under the now rested Credited Advance Programme for Metering Implementation (CAPMI) introduced by Order No. NERC/05/0001/13 which became effective by 14th May 2013 and was aimed to close the huge metering gap in the NESI and help the Discos meet their PA on metering, the obligation was that of the Discos. The scheme only gave the customers who wanted to pay the meter cost upfront and then have the Disco amortize the cost of the meter via electricity supplied to the customer over a period of time.

Although, the obligation to meter the customers has not been taken away by the latest regulation of NERC on metering – i.e. the Meter Assets Provider (MAP) Regulations (No. NERC-R -112), the fact that the customer is expected to pay for the meter provided by the MAP either outrightly or over a period of time ought to attract some compensation from the Discos. Section 24 of Chapter of the MAP regulation scheme underscored the responsibility of the Discos to ensure that their customers are metered.

See our previous articles on MAP at: http://www.spaajibade.com/resources/wp-content/uploads/2018/04/Overview-of-the-Metering-Assets-Provider-Regulations-2018-Olalere-Matthew.pdf and on metering of the Nigerian electricity customer at: http://www.mondaq.com/Nigeria/x/818682/Consumer+Law/Minimising+The+Incidents+Of+Litigation+On+Wills+In+Nigeria.

MAPs are to charge a maximum of N36,991.50 for single phase meters and N67,055.85 for three phase meters by Order No./NERC/181/2019 – (NERC Order on the Implementation of the Meter Asset Provider Scheme in the NESI). These costs are inclusive of supply, installation, maintenance and replacement of meters over its technical life, and any customer who pays outrightly is not obliged to pay any further charge.

  1. Renewed interest in cost-reflective tariff

The PA executed between the respective core investors and the Federal Government of Nigeria (FGN) remains in place and all Discos are expected to continue to comply with their obligations to meter the customers by virtue of same. The Discos are expected to have achieved a high rate of efficiency with the metering gap significantly closed at the review of the PAs on metering by December 2019. It should be noted that as the December 2019 date designated for the review draws near, the NERC has recently issued a minor update of the multiyear tariff structure (MYTO) to take into consideration the necessary variables for all the Discos. This is also in preparation for the review and to ensure that all customers are metered, and every customer pays a fair price for all electricity supplied and utilized. At this time when there is real push to meter the consumers and review the tariff to make it cost-reflective, the disputes between the Discos and the customers regarding estimated and accumulated bills are bound to be in the front burner as depicted by the stories shared have.

  1. The Dispute Resolution Mechanism

The Customers too should be familiar with the dispute settlement procedure from the point of submitting their complaints to the point of its resolution, to avoid resorting to self-help and reduce discontent in the industry. By section 3 of the NERC Customer Complaints Handling: Standards & Procedures Regulation, 2006 made pursuant to section 96 (2) (c) & (d) of the Electric Power Sector Reform ("EPSR") Act, 2005 every Disco is obliged to set up the Customer Complaints Unit (CCU) within its premises to which an aggrieved customer will submit his/her/its complaints, including the one on 'irrational' estimated billing. By section 3 (6), the complaint can be submitted by email and the Disco's CCU is obliged to resolve same within 15 days. It is only when the CCU is unable to satisfactorily resolve the complaint that same is submitted to the NERC Consumer Forum ("the Forum"). See section 3 (8) (9) and (10) thereof. Section 6 empowers the Forum to resolve all disputes, except the ones relating to section 93 and 94 of the EPSRA, within 2 months of receiving the complaint.

The procedure of lodging a complaint before the Forum is by filing the Form 1 provided by section 8 and attached to the resolution, and this can be submitted via email as well. Section 9 mandates the NERC Forum's secretariat to acknowledge the complaint within three days, and where complaint is rejected, the complainant must be informed within five days. Section 10 provides for fair hearing of the complaint at a date to be fixed by the Forum and of which both the complainant and the Disco would have been pre-notified to come and present their respective cases. Section 12 also further gives any party not satisfied with the Forum's decision to appeal same to the NERC within 10 working days of the decision. It is only when NERC is unable to resolve the complaints to the satisfaction of the parties that the party not satisfied can approach the Federal High Court for resolution. See also Section 50 of EPSR Act, 2005, and Chapter II of the NERC Business Rules of the Commission Regulation, 2006 made pursuant to section 96 (2) (a) of EPSR Act, 2005.

Electricity Customers also need to be aware of their right to petition the Consumer Protection Council of Nigeria without necessarily waiting for the NERC's dispute resolution mechanism to play out. This is another practical way of keeping the Discos on their toes and ensuring that the customer is not cheated but receives quality service at a fair price. The Federal Competition and Consumer Protection Act 2019 has adequate provisions in this regard2.

  1. Conclusion

We note that NERC continues to consult the stakeholders in preparation for issuance of regulation for Capping of Estimated Billing for Unmetered Electricity Customers, but this needs to be concluded on time. Also, while the bill to amend the EPSRA, and to proscribe estimated billing (Electric Power Sector Reform Act (Amendment) Bill, 2019) is still pending before the National Assembly or with the office of the President awaiting assent, it is important that the Discos are made to do their best in providing value to the customers in their services delivery. In view of the renewed interests in issuing the order on cost-reflective tariff to the Discos, and given that the customers have literally gone through 'hell' with most paying for electricity not consumed, buying transformers for themselves and paying for the meters for their premises, it is important that customers make effort to be familiar with the dispute resolution procedure to enable them take advantage of available options to reduce their burdens and resolve the discontents. It is even much more important that the Discos remember that as private businesses, they need to thread softly in the manner they push for collection of the estimated bills for electricity (sometimes not supplied to or consumed by the customers) either at the point where the customer purchases the prepaid meter or at any other time. The most important thing though, is that the regulator must be willing to step in to resolve all the ensuing discontents to the satisfaction of the parties.

Footnotes

1. Peter Olalere, Senior Associate Counsel with the Dispute Resolution Department SPA Ajibade & Co., Lagos, Nigeria.

2. For example, by Sections 88 and 104 and 105 of the Federal Competition and Consumer Protection Act (FCCPA) 2019, the price of electricity is regulated, and the industry itself is regulated. The rule against unfair and unreasonable or unjust contract terms ensures protection of the benefit of the consumer by virtue of section 127 of FCCPA while sections 130 and 131 provide for consumer's rights pertaining to quality and safety of goods and services. Section 146 empowers the consumer to seek enforcement of his rights, including by way of suing the service provider.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Similar Articles
Relevancy Powered by MondaqAI
 
In association with
Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Related Articles
 
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Mondaq Free Registration
Gain access to Mondaq global archive of over 375,000 articles covering 200 countries with a personalised News Alert and automatic login on this device.
Mondaq News Alert (some suggested topics and region)
Select Topics
Registration (please scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions