1. What are the main dispute resolution authorities established in Dubai to resolve real estate disputes?

UAE offers a wide range of dispute resolution methods and relevant authorities governing real estate sector wherein the litigation courts seem like a last resort for the parties, considering the timeline and costs involved. Following are prominent authorities licensed to act upon real estate dispute:

  1. Dubai Land Department- Amicable Settlement Centre (DLD-ASC): the DLD-ASC mediators or settlement committee is a proficient authority in amicably settling the disputes between the parties without any costs. The authority has access to all the database pertaining to the property registered with DLD, thus, hold large experience in resolving such disputes. Any decision passed by ASC will be binding and enforceable on the parties, as it is mutually agreed by way of settlement.
  2. Legal Affairs Department of DLD: recent development in the real estate laws allows the developer to terminate the sale purchase agreement of the defaulting purchaser under Dubai Law Number 19 of 2017, upon satisfying a certain procedure. The process of termination will be undertaken through DLD legal online system post submitting the fees of AED 3,000 (UAE Dirhams three thousand). DLD legal system also has the authority to mediate between the parties for an amicable settlement. Buyers aggrieved from DLD's decision for termination of Sale Purchase Agreement can file claims before the civil courts.
  3. Cancelled project committees for liquidation: Pursuant to Royal Decree Number 21 of 2013, the Cancelled Project Committee (CPC) is authorized to liquidate the cancelled projects in Dubai, wherein Real Estate Regulatory Agency (RERA) of Dubai holds the executive rights to cease the ongoing real estate projects. CPC has the exclusive jurisdiction on any dispute pertaining to a dispute arising out of cancelled projects.
  4. Judicial Committee for returned cheques: Due to a large number of bounced cheques submitted by the buyers, the Dubai government under Decree Number 56 of 2009 established a committee to pass decision over bounced cheques submitted by the investor, reschedule the payment scheme, forward the bounced cheques case to the competent court.
  5. Rental Dispute Settlement Committee: Dubai has established an exclusive authority for resolving rental disputes relating to the lease of property under Decree Number 26 of 2013, Rental Dispute Settlement Committee (RDSC). RSDC can only entertain lease below ten years, property located within mainland or free zone who does not have their regulating authority. The decisions issued by RDSC can be appealed before the RDSC appeal committee.
  6. Arbitration before Dubai International Arbitration Centre (DIAC): A property dispute can be referred to DIAC only post mutual consent through the agreement. However, there are several properties which cannot be arbitrated due to public policy.
  7. Civil Court- Property Division: The property courts of Dubai has jurisdiction over all the property disputes, which should be initially referred to Court of First Instance followed by Court of Appeal and Cassation.

2. What is the status quo of arbitration in real estate disputes in Dubai?

If the sale and purchase agreement signed the parties refer to a dispute resolution clause through arbitration, the parties must resolve the matter through arbitration by offering their consent in writing. Either party in such case has the right to challenge the jurisdiction of the arbitration centre before the competent court, or the other party can equally contest on the basis of mutual agreement for dispute resolution. The process of arbitration is fairly less time to consume than potential litigation in real estate matters. However, there are certain cases under which the real estate matter cannot be referred to the arbitration centre, such as in matters where the property in dispute is public property. In such circumstances, courts continue to have the jurisdiction in the matter, even if there is an arbitration agreement between the parties. This empowers to court to safeguard the interest of investors in cases where arbitration fails to resolve their problems or in cases where other party does not comply with the arbitration clause.

3. What is the legal status of the dispute resolution clause in a Sale and Purchase Agreement and other documents before the relevant court or independent authority?

The dispute resolution clause in the sale and purchase agreement (SPA) will be treated similarly as that of other commercial contracts. If the dispute resolution clause allows for arbitration, the matter shall be referred to arbitration, unless the property in question cannot be arbitrated or otherwise specified by the court under any decree or if the matter has been referred to the Canceled Project Committee. Whereas, if the SPA authorizes the parties to present the matter before the court, the parties can opt for any of the aforementioned dispute resolution authorities, prior to submitting their claim before the court, subject to the clause that they fulfil the prerequisites of such committees.

4. What is the limitation period for submitting a claim before the relevant authority?

Federal Law Number 5 of 1985 on the Civil Transactions Law (the Civil Code) provides in several clauses the time-limit in which the aggrieved party can file a civil claim. However, it does not specifically highlight the limitation period for real estate sector, yet it can be witnessed through Article 473 of the Civil Code which states the limitation period for any contractual claim is 15 years from the date on which the dispute arose, or the claim arises. Whereas, the Civil Code obliges to file an appeal before the Appeal court within thirty (30) days from the date of judgment from Court of First Instance and sixty (60) days to file appeal before Court of Cassation from the date of judgment of Appeal Court. Similarly, Article 880 of the Civil Code sets out the time limit for architectural default in building contracts which are ten years from the date of knowledge of default.

Further, the Legal Affairs of Dubai Land Department does not specify the time limit for filing the complaint about the termination of the SPA. However, it can begin anytime post signing the contract, should the buyer fail to adhere to his contractual obligations such as fulfilling the payment schedule. In this regards, post submitting the complaint the authority provides a thirty (30) day time period for the buyer to remedy the breach. It further allows the developer who has completed 80% of the construction to submit the complaint about the termination of the agreement, should the buyer fail consistently to meet with the payment schedule.

5. What is the structure of the court where large real estate disputes are referred? Are there certain divisions of the court to resolve a particular dispute?

In accordance with Article 32 of the Civil Procedure Law, with regards to the actions in rem relation to property/real estate, if the parties are located within the jurisdiction of several courts, the jurisdiction will be with the court in whose jurisdiction the property or any part of the property lies. Unlike Dubai International Financial Centre (DIFC) free zone, other free zones in the Emirates does not have specific jurisdiction. Thus, the matters have to be referred before Dubai Courts.

Further, Dubai court has specifically established a Real Estate Court who holds the exclusive jurisdiction over real estate matters which is an extended arm of Court of First Instance. The matters referred before the said court can be of any amount, and the party is filing the case must submit court fees with a maximum of AED 40,000 (UAE Dirhams forty thousand).

Unlike the above, DIFC has their courts and DIFC Law Number 9 of 2004 highlights the roles and responsibilities of DIFC Courts. As opposed to earlier, the Dubai Law number 16 of 2011 permitted the contracting parties to agree to DIFC Court jurisdiction even when there is no connection to DIFC courts.

In such cases, DIFC holds exclusive jurisdiction in relation to civil and commercial cases falling within the following gateway, under Article 5A (1):

  1. Commercial or civil claim to which DIFC company is a party;
  2. Any claim arising out of any contract to be performed wholly or partially in DIFC;
  3. Any claim and actions arising out of any transaction which was performed in DIFC or any part thereof;
  4. Appeals against the laws frame by DIFC bodies;
  5. The claim which provides exclusive jurisdiction to DIFC Court under DIFC rules.

6. What are the interim remedies available to the parties? The Civil Procedure Law does not offer a concept of interim reliefs or injunction to parties in a civil claim, except for attachment of the property, if the claimant proves that the defendant will default in submitting the claim amount.

On the contrary, the Federal Law Number 6 of 2018 concerning the Federal Arbitration Law empowers the arbitral tribunal under Article 21 and 18 to issue interim relief or conservatory measures either at the request of the party or suo moto. These interim reliefs will be granted in cases to preserve the evidence; maintain the assets from which the award will be satisfied; prevent the parties from taking any action which can cause imminent harm to the arbitration process. Further, according to Dubai Decree number 26 of 2013 authorises the Rental Dispute Committee to entertain all the interim and urgent reliefs filed by either party. However, the law does not provide a description for the type of interim reliefs.

7. What are the possible procedures for filing an appeal?

The procedure for filing an appeal or raising an objection against the judgment passed by any authority is different for each organization detailed as follows:

  1. Appeal against the judgment of Real Estate Court: either party aggrieved from the decision of Court of First Instance can file an appeal before the Court of Appeal within thirty (30) days from the date of receiving the judgment, upon the payment of relevant court fees.
  2. Appeal/objection against Arbitral Award: According to Federal Law Number 6 of 2018 concerning the Arbitration Law, the arbitral award shall be binding on the parties and will hold the competent court shall pass res judicata and a decision confirming the award. Yet, the law further allows party to challenge the arbitral award under Article 53 of the Arbitration Law under several circumstances including but not limited to, absence of specific arbitration agreement, incompetency of either party at the time of concluding arbitration agreement, failure to appoint arbitrators in accordance with the procedures, award containing subject matter beyond the scope of tribunal.
  3. Appeal against the decision of Rental Dispute Committee: the judgments issued by the first instance of the rental committee can be appealed before Appellate Division except for claims less than the value of AED 100,000. There is a further exception on the foregoing clause, where the appeal can be filed in cases less than value AED 100,000 in any of the following cases:
    • If an eviction order is passed;
    • Judgment is against the rules of jurisdiction;
    • If the judgment fails to address the relief sought by parties;
    • Judgment issued against a third party;
    • is based on forged or false documents;
  4. The objection against the order of DLD Legal Affairs Department: the buyers aggrieved from the decision of DLD for termination of the sale and purchase agreement can raise an objection before the Civil Court in accordance with Law Number 9 of 2009.

8. What remedies are available for the developer and investor, if a real estate project is cancelled by the government?

Dubai Real Estate Regulatory Agency (RERA) an extended arm of Dubai Land Department holds the authorization to cancel real estate projects in Dubai under Decree number 6 of 2010. Upon the cancellation of such project, the developer has seven (7) days from the date of notification to file an objection in writing against the decision of RERA. Upon receiving the objection from the developer, RERA has to issue its decision within seven (7) days from the date of submission. Subsequently, RERA is obliged to issue a technical report highlighting the reasons for cancellation. RERA must on the expense of the developer appoint an auditor for analyzing the financial position of the project, investment received by the developer or credited in an escrow account, assessing the payments made by the developer.

Whereas, according to the concerned decree, the investors will be refunded the amount deposited in the escrow account within fourteen (14) days. In any event, if the amount deposited in the escrow account is insufficient to pay off the investors, the RERA will oblige the developer to pay off from personal funds. Should the developer fail to refund the amount to investors, RERA may take any decision against the developer. In the current circumstances, the investor upon receiving information for the cancelation of the project shall submit the relevant documents to the auditor appointed by RERA to seek the claim.

9. What remedies are available to investors if the developer or the owner of the real estate project files for bankruptcy before the competent court?

Federal Law Decree Number 9 of 2016 concerning Bankruptcy in UAE, governs the process for insolvency filed by the companies partly or wholly owned by the government, private institutions or companies within the free zone, except financial free zones.

Alike any other company filing for bankruptcy, the Developer of a real estate project can also submit an application claiming bankrupt. The concerned law offers several paths to the company facing financial difficulties such as:

  1. Insolvency with restructuring, where the court or relevant authority appoints a financial expert who restructures the finances of the company;
  2. A protective composition which available for companies facing financial issues, but not yet insolvent;
  3. Liquidation which is considered post exhausting the aforementioned options; In any of the above cases, the investors must submit all the relevant documents pertaining to the property such as sale and purchase agreement, payment receipts to either the liquidator or the auditor as the case may be in order to seek the relevant claim.

10. What is the procedure for enforcing local arbitral or other awards in real estate disputes in Dubai?

Pursuant to Article 55 of the Federal Law Number 6 of 2018, a party looking for enforcing the arbitral award shall submit the request for its ratification before the Chief Justice of Civil Court along with following documents:

  1. Original award or a certified copy;
  2. Copy of the arbitration agreement;
  3. Legally translated and duly attested and notarized arbitral award, in case of a foreign award;
  4. Copy of minutes of deposit of the award.

Upon receiving the aforementioned documents, the competent court shall provide its confirmation on the award and shall order for its enforcement within sixty (60) days from the date of the request, unless the court has specific reasons to set aside the award under the Law.

The awards or orders passed by other relevant authorities highlighted in Question 1 will be binding and does not require ratification as they are an outcome of agreement between the parties, except for the judgment passed by the Real Estate/ Property Court which must be submitted before the Execution Court post thirty (30) days from the date of judgment.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Similar Articles
Relevancy Powered by MondaqAI
 
In association with
Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Related Articles
 
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Mondaq Free Registration
Gain access to Mondaq global archive of over 375,000 articles covering 200 countries with a personalised News Alert and automatic login on this device.
Mondaq News Alert (some suggested topics and region)
Select Topics
Registration (please scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions