Burundi: The Electricity Sector In Burundi: A Place For Renewable Energy In The Great Lakes Region?

Last Updated: 8 January 2018
Article by Julien Barba

The energy sector in Burundi is today very circumscribed. It is mainly made up of the national utility "Regideso", who benefits from a legal monopoly for electricity transmission, distribution and supply, renewed in 2015 for 25 years1. The generation capacities are owned and operated by Regideso, are mainly hydro-electric and are very old and subject to chronic sub-investments, as is the case for the transmission and distribution assets too. Most of the electrical equipment date from before the Independence in 1962, and any additional generation capacity may harm and cause outages due to the said obsolescence of the grid. Additionally, the country is frequently struggling - due to currency issues - to import oil in sufficient quantities for gas-fired plants and personal generators, as has been regularly observed for the last decade.

However, Burundi has (i) a growing power supply-demand gap due notably to a rapidly increasing power demand in the Bujumbura capital area, and (ii) a huge energy resource (notably renewable, with hydro, estimated to 1,7 GW, and solar, estimated to 2,000 kWh/m²/year). Burundi is also very densely populated compared to other neighbouring countries such as Tanzania or Kenya (350 people/km² and 10 millions of inhabitants, similar to Rwanda) and (iii) is largely subject to the funding and the structural reforms from World Bank and AfDB. It has a huge demand for small and medium scale energy projects which may match in particular with their agricultural needs (mechanization and food-conservation), the global welfare of the local population (schools and hospitals) and the potential mineral extraction in the region.

Putting aside the political crisis triggered in 2015, and considering the current difficulties of the country for importing energy resources and the needs in terms of agriculture, welfare and peace, the country would be ideally placed for developing numerous renewable energy projects. These projects should be implemented both at (i) a regional level, with multinational hydro-electric projects mutually benefiting to the countries of the Great Lakes region and with the progressive integration of Burundi in the Eastern African Community and at (ii) a national level, with small and medium-sized renewable energy projects feeding stammering industries, cities and townships. Interestingly, the Burundian Government has developed policies, with the help of World Bank and AfDB, to reform and modernize its electricity sector, as presented below.

1. A snapshot of the current energy sector in Burundi

Regideso, a publicly-owned company created in 1962 on the independence of the country, is operating the transmission and distribution grid and 8 hydropower (the 2 biggest being Mugere and Rwegura) and 2 thermal plants totalizing a very limited national installed capacity of 45 MW only for nearly 10 million people. There are very few IPP, providing electricity mainly for their own needs.

Aside from its national generation capacity, Regideso is buying electricity from an old cross-border hydropower complex located in DRC on the south shores of Kivu Lake, on the Ruzizi River, with 70 MW of power capacity to be shared between Rwanda, DRC and Burundi2. These generation capacities are nevertheless greatly hampered by the chronic under-investment in this sector, in particular in the obsolescence of the old hydropower plants and in the grid equipment (some HV transformers and substations dating from before the Burundi's independence in 1962), leading to an outstanding level of electricity loss of 24%. Due to periodic lack of currencies, the country is facing frequent oil shortages hampering the electricity generation of the small generator sets and thermal plants.

As an illustration of the severe obsolescence of the grid, the commissioning in September 2017 of an emergency leased power generation of 30MW for the supply of the capital Bujumbura caused severe outages due to the inability of the grid to remain stable for the wheeling of this new production.

On the consumption side, electricity shows very poor statistics: it only counts for 1.3% of the primary energy consumption (95% for biomass and 2.5% for oil), the electricity access rate is around 7% (42% in Kenya, 25% in Rwanda and 24% in Tanzania), and the average consumption is 25 kWh/month per person – which is slightly below the monthly subsistence level estimated to 30 kWh in Africa.

However, this negative global picture is counterbalanced by the implementation of several decisions and the development and construction of key projects at national and regional level:

2. New ongoing power capacity projects

(a) Regional power projects

From a regional standpoint, a new 200 MW hydro-electric project located in the Ruzizi River, in Democratic Republic of Congo, is currently in a developmental phase under the form of a 25-year BOOT to be signed between Electricity of the Great Lakes3, a public transnational entity, and the awarded consortium for the construction and operation of the plant, SITHE Global Power Ventures and Industrial Promotion Services Ltd. While the estimated project cost is around USD 600 million, several development finance institutions have already provided significant funding for the project (the European Union, the EIB, KfW, the AfDB and NEPAD-IPPF). It will be a run-off-the-river hydro-electric plant with three power units producing electricity to be evacuated by 220 kV lines to Burundi, Rwanda and DRC. EGL will sell one-third of the capacity to each national utility, on commercial terms, with a full payment security package, under separated power purchase agreements.

(b) National power projects

From a national standpoint, a 7.5 kWc solar PV plant project is currently under construction. This PV plant, located in the centre of the country (Gitega), is to be connected to the electricity grid operated by Regideso and is to provide a 15% increase in the generation capacity of the national grid. A PPA of 25 years has been signed between Gigawatt Global and the national utility, Regideso. This will be the first power plant built in Burundi in nearly 30 years and the largest private sector investment in Burundi in 2017

Aside from this solar PV project, a series of other generation projects are ongoing, mainly from renewable energy sources, and are listed in Annex 1.

(c) Emergency leased power generation

Additionally, and in view of the increase of the tariff electricity supply, the Burundian Government has - for 10 years - leased a gas-fired power generation of 30 MW located in Bujumbura, the capital city. This lease aims at bringing an immediate emergency electricity supply, but this solution will have both an environmental and financial cost: around 160.000 litres of fuel will be consumed each day and the Regideso will be required to pay around EUR 3,8 million per month. The lease has been entered into with Interpetrol, a company already operating in Burundi for the quasi-monopoly of oil importation.

(d) Transmission and distribution grids

In parallel, the transmission and distribution grid systems are benefitting from new construction works or rehabilitation works, mainly for the interconnection with the neighbouring countries, including notably the following projects:

  • a new 86 km transmission line is being constructed for the evacuation and transport of the electricity to be produced by the future Ruzizi III to Bujumbura, as part of the regional interconnection with the country of the great lakes region (AfDB, KfW and Burundi are financing);
  • a new 161 km transmission line is being constructed for the evacuation and transport of the electricity to be produced by the new hydro-electric power plant of Rusomo Falls (located in Tanzania), and financed by AfDB, EU and Burundi.
  • a new 143 km transmission line between Kigoma (Rwanda) and Gitega (Burundi) as a part of the regional interconnection with the Nile Basin Countries and financed by EU, KfW and Burundi.
  • and also a new 30 kV distribution line in Bujumbura (approved in January 2017).
  • The rehabilitation of the distribution grid of Bujumbura should also be tendered in the coming months by the Burundian's Government. All these rehabilitation works are funded by World Bank and the AfDB.

3. New electricity tariffs and prepayment devices development

In September 2017, concomitantly with the commissioning of the 30 oil-fired plants by Interpetrol, Regideso has decided to implement an increased tariff structure for the electricity supply: for a household, the first 50 kWh is priced 0.04 EUR/kWh, the second 50 kWh is priced 0.14 EUR/kWh and above 151 kWh, the kilowatt per hour is priced 0.26 EUR. For medium and high voltage consumers (industries and administration), the average price is 0.12 EUR/kWh excluding monthly charges (around 7.25 EUR/months). Asking the question of a cost-reflective pricing would not be very relevant in this situation since the actual costs incurred in Burundi by Regideso for electricity production are not market costs4.

In parallel, Regideso has since 2016 implemented the replacement of the existing post-paid metering device by pre-paid devices. In 2017, Regideso contracted with an Australian company, PAYWAY, which is the exclusive entity in charge of collecting and managing customer payments, enabling customers to pay for the electricity bills online or over the phone.

However, while the implementation of these programmes aim at enhancing profitability and efficiency of Regideso for the future, Regideso still suffers from important backlogs mainly coming from other government entities: the army and hospitals (estimated to EUR 28 million). Regideso is undergoing structural reform with the help of the World Bank and AfDB since 2008, which should lead – on the long-term - to the withdrawal of the State to the benefit of an independent manager through the conclusion of a concession contract.

4. A legal framework in place... yet to be enforced

A set of legislation has recently been passed by the Burundian Government. New laws on electricity5 and public-private partnership6 were passed in 2015, with the subsequent enactment of the application decrees. It is mainly French-law inspired, notably regarding the definition and use of the "electricity public service" and the use of "public service "concession" for hydro-electric projects.

It is noteworthy that there is no specific legal tool for renewable energy which would encourage renewable energy adoption or dis-encourage fossil fuels. However, this situation may change rapidly since the current regulatory tools are incomplete and far from being sufficient. An update or subsequent modification of this framework may be implemented in the near future.

From a legal standpoint, the 2015 Electricity Acts provides:

(a) On the production side, the current electricity law provides 4 regimes of electricity production:

1. Public-private partnership regime: this applies to any project implemented on the public domain of Burundi (e.g. public lands and fields owned by public entities, or rivers for hydro-electric plants). In this case, the operator must comply with both (i) the PPP law and (ii) the application decree enacted for the application of this regime. The PPP Contract can be entered into either by (i) the state, (ii) a parastatal entity or (iii) a local entity who will be in charge of the concerned public domain;

1. Concession regime: this applies only to hydro-electric production projects and transmission and distribution grid construction operation. A concession contract can only be executed by the State and by no other public entity. It covers design, financing, construction, operation of the hydro-electric plant and includes the marketing of the electricity produced.

3. Authorisation regime: this would be the common regime for power projects with an installed power capacity of or above 500 kW, and which would be located on private lands and not public lands. This authorisation is delivered by the Ministry in charge of Energy and must be obtained prior to the construction works.

4. Declaration regime: this regime applies for any power projects with an installed power capacity of less than 500 kW.

(b) Off-grid electricity production for auto-consumption is permitted under restricted conditions and covered by a specific section of the Electricity law. This configuration must be authorised by the Ministry in charge of Energy, and provides that the operator is authorised to produce, transport and supply electricity for an "exclusive use". The said authorisation is granted for a maximum of 25 years.

However, the direct selling to private third-parties (other than Regideso) by an Independent Power Producer is not, except in case of overriding reasons of general interest, to be permitted. Regideso remains the required buyer for buying any surplus electricity, and this for a duration of 25 years as from the entry into force of the Electricity law (theoretically until April 2040).

The Electricity law expressly provides that IPP will be authorised to sell directly to third-parties after the said period of 25 years, if no declaration of overriding motive of general interest by the Ministry in charge of Energy occurs.

In our view, there would be grounds today for triggering this declaration of emergency and authorising the direct selling of electricity to third-parties under the reason of overriding motive of general interest.

(c) On the distribution and transmission aspects, Regideso remains the exclusive operator in charge of transmission, distribution and supply of electricity, for a period of 25 years as from the entry into force of the Electricity law, i.e.23 April 2015 (theoretically until April 2040).

Schedule 1: indicative list of energy projects in Burundi

Name Installed Power Capacity Financing Expected Date for Commissioning
Hydro-Electric Plant Mpanda 10,4 MW Burundian Government 2018
Hydro-Electric Plant Kabu 16 20 MW Credit from the Indian Government 2018
Hydro-Electric Plant Jiji-Mulembwe 49 MW World Bank, AfDB, UE, EIB 2020
Hydro-Electric Plant Rusumo falls (Burundi-Rwanda-Tanzania, 80 MW) 26,6 MW (Burundi Part) World Bank, AfDB 2020
Kagu Project 8 MW PPP Swedenergy 2019
Solar PV Project (two units) 20 MW PPP Gpt Sarako-Tauber 2017
Solar PV Project 7,5 MW PPP Gigawatt Global 2018
Biomass Project 30 MW PPP Global Synergy Solutions Ltd 2017
Importation from Ethiopia 200 MW Burundian Government: MoU signed. 2020
Rehabilitation Hydro-Electric Plant of Ruvyironza 22,5 MW World Bank 2020
Gas-fired Plant 30 MW PPP Interpetrol 2017
Peat Power Project 15 MW PPP with BUCECO 2019
Ruzizi III 70 MW (Burundi Part) World Bank, AfDB, EIB, UE 2020
Solar PV Project 11 MW PPP CRD Holding 2017
Rehabilitation Hydro-Electric Plant in Kirasa-Karonge 27 MW Credit from Chinese Government 2019
For a total installed power capacity of 591 MW.

Footnotes

[1] The Electricity Law dated 23 April 2015 grants to Regideso the monopoly of transmission, distribution and supply of the electricity for 25 years as from the entry into force of the Electricity Law. However, direct selling to private third-party may be authorised under specific conditions, see Section 4 (b).

[2] This trans-border hydropower complex is made up of 2 plants: Ruzizi I (operated by the Congolese utility, SNEL, since 1958), and Ruzizi II (operated by Burundi with the two neighbouring countries which are Rwanda and DRC through a transnational public company SINELAC, for Société Internationale des Pays des Grands Lacs whose shareholders are Democratic Republic of Congo, Rwanda and Burundi, and established in 1983 by a multi-national treaty).

[3] EGL, an entity of the Economic Community of the Great Lakes Countries, gathering Rwanda, DRC and Burundi for energy cooperation.

[4] The results of the precedent tariff increase of 2012 has had positive impacts on the financial situation of Regideso but were not sufficient for improving it on the long-run.

[5] Law No. 1/13 dated 23 April 2015 for the re-organisation of the electricity sector in Burundi.

[6] Law No. 1/14 dated 24 April 2015 for PPP.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
Some comments from our readers…
“The articles are extremely timely and highly applicable”
“I often find critical information not available elsewhere”
“As in-house counsel, Mondaq’s service is of great value”

Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration
Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:
  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.
  • Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.
    If you do not want us to provide your name and email address you may opt out by clicking here
    If you do not wish to receive any future announcements of products and services offered by Mondaq you may opt out by clicking here

    Terms & Conditions and Privacy Statement

    Mondaq.com (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

    Use of www.mondaq.com

    You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about Mondaq.com’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.

    Disclaimer

    Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

    The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.

    Registration

    Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

    • To allow you to personalize the Mondaq websites you are visiting.
    • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
    • To produce demographic feedback for our information providers who provide information free for your use.

    Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

    Information Collection and Use

    We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

    We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to unsubscribe@mondaq.com with “no disclosure” in the subject heading

    Mondaq News Alerts

    In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.

    Cookies

    A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

    Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

    Log Files

    We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.

    Links

    This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

    Surveys & Contests

    From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.

    Mail-A-Friend

    If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.

    Emails

    From time to time Mondaq may send you emails promoting Mondaq services including new services. You may opt out of receiving such emails by clicking below.

    *** If you do not wish to receive any future announcements of services offered by Mondaq you may opt out by clicking here .

    Security

    This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to webmaster@mondaq.com.

    Correcting/Updating Personal Information

    If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to EditorialAdvisor@mondaq.com.

    Notification of Changes

    If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

    How to contact Mondaq

    You can contact us with comments or queries at enquiries@mondaq.com.

    If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at problems@mondaq.com and we will use commercially reasonable efforts to determine and correct the problem promptly.

    By clicking Register you state you have read and agree to our Terms and Conditions