United Arab Emirates: FIDIC Suite Of Contracts: Updates To The Red, Yellow & Silver Books

Last Updated: 27 July 2017
Article by Natalie Ledger

At the International Contract Users Conference held in London from 6 to 7 December 2016, FIDIC unveiled its proposed revisions to the 1999 Rainbow Suite of standard form contracts including the issuance of a pre-release version of the second edition of the Yellow Book, the contract used for the provision of electrical and/or mechanical plant and for design and execution of building or engineering works (Plant & Design Build). This pre-release version is stated as "intended only for viewing". Therefore, although it is not possible to know with any certainty if all of the changes that have been proposed in the pre-release version will make it into the final version of the second edition they provide a good indication of the changes to come.

FIDIC intend to formally publish the second edition of the Yellow Book later this year, along with the second editions of the other two contracts that form part of the original 1999 Rainbow Suite, namely the Red Book, the contract used for building or engineering works designed by the Employer (Construction) and the Silver Book, the contract used on projects where the Contractor carries out all Engineering, Procurement and Construction (EPC/Turnkey Projects). As such, it is intended that the second editions of the Red and Silver Books will take a similar form to the pre-release version of the second edition Yellow Book.

The FIDIC standard forms of contract are the predominant standard form of contract on international projects, particularly in Eastern Europe, Africa, the Middle East and Asia. Their popularity stems from the suite of contract's flexible nature, in particular the ability of users to be able to adopt the suite of contracts across a wide variety of legal systems. Although the FIDIC suite of contracts are rarely used in the UK, any changes will be of general importance at least, to the extent that they reflect current trends in contract drafting and international best practice.

Proposed changes to the Yellow Book

The pre-release version of the second edition of the Yellow Book is now 50% longer than the first edition and the content has been substantially changed, with some clauses being re-drafted in their entirety. This note summarises some of the key changes that have been proposed.

FIDIC's rationale behind the proposed changes include an increased focus on 1) project management tools and mechanisms including the reinforcement of the role of the Engineer and a greater emphasis on pro-active management and; 2) the balance of risk allocation between the Parties by encouraging reciprocity; and 3) dispute avoidance through greater clarity, visibility and certainty.

The Engineer

A new role of the "Engineer's Representative" has been introduced (sub-clause 3.3 of the pre-release second edition). Pursuant to this provision the Engineer may appoint an Engineer's Representative and delegate to him the authority necessary to act on behalf of the Engineer, except to replace the Engineer's Representative. The Engineer's Representative is required to be based on Site throughout the duration of the project. It is hoped that this change will ensure effective and timely management of claims.

Whilst the Engineer will continue to act for the Employer as it did in the first edition, the Engineer is no longer required to obtain the Employer's consent prior to making a Determination under the Contract (sub-clause 3.2 of the pre-release second edition). The title of sub-clause 3.7 of the pre-release second edition (sub-clause 3.5 in the earlier version) has been changed from "Determination" to "Agreement or Determination" in a clear attempt to reflect that the Engineer is under a positive obligation to encourage agreement of claims. If the Engineer fails to make a Determination within the time frame specified within the contract then he will be deemed to have rejected the claim and the claim can be referred to the re-named "Dispute Avoidance / Adjudication Board" (the "DAB") (changes made to the DAB provisions are discussed further below). When acting to seek Agreement or Determination, the Engineer is said not to be acting for the Employer, but to be acting "neutrally" between the Parties.

The Programme

One attempt to encourage pro-active management is the significant increase in programme obligations (sub-clause 8.3 of the pre-release second edition) requiring the Contractor to include numerous additional items (11 items are listed in the pre-release second edition compared to the 4 items that are listed in the first edition) to be shown on each programme. These additional items include the Commencement Date and the Time for Completion, of the Works.

If the site is to be constructed in sections, the date of right of access to and possession of each section of the Site must be included in the Contract Data. The Contractor must also ensure that all activities in the programme are logically linked and show the earliest and latest start and finish dates for each activity, as well as any float. The Contractor must also identify the critical path.

Although the current position, that the programme does not form part of the contract documents has been maintained in the pre-release second edition, a new obligation has been placed on the Engineer to review the programme and state whether or not it complies with the contract, within 21 days of receipt of the initial programme or 14 days of receipt of a revised programme. If the Engineer fails to comply with this obligation, then the Engineer will be deemed to have given a Notice of No-Objection and the initial or revised programme will be deemed to be contract compliant. There is also a positive obligation on the Contractor to submit a revised programme which accurately reflects the actual progress of the Works.

Advance Warnings

Another attempt to encourage pro-active management are the changes introduced to the Advance Warning provisions. In the first edition the Contractor is required to give advance warnings of any probable future events or circumstances which may adversely affect the works. However, in the pre-release second edition the proposed changes place an obligation on both Parties to "endeavour to" give advance warnings of any matter which may (a) adversely affect the work of the Contractor's Personnel; (b) adversely affect the performance of the Works when completed; (c) increase the Contract Price; and / or (d) delay the execution of the Works or a Section (if any). By encouraging both Parties to give these warnings it is hoped that this will increase openness and visibility, and avoid disputes (sub-clause 8.4 of the pre-release second edition).

Extensions of Time

In terms of the causes which may entitle the Contractor to an Extension of Time in the pre-release second edition, these largely remain unchanged from those listed in the current edition. One notable change, however, is the narrowing of the scope of the Contractor's ability to claim an Extension of Time for exceptionally adverse climatic conditions. Pursuant to sub-clause 8.5(c) of the pre-release second edition any entitlement of the Contractor to make a claim for an Extension of Time for exceptionally adverse climatic conditions will be limited to climatic conditions at the Site which are Unforeseeable" having regard to climatic data made available by the Employer and / or published by the Country for the geographical location of the Site.

At the end of sub-clause 8.5 of the pre-release second edition a new provision has been introduced in an attempt to deal with concurrent delay. This new provision provides that the Contractor's entitlement to an Extension of Time shall be assessed "in accordance with the rules and procedures stated in the Particular Conditions". It is clearly hoped that this new provision will force the Parties to address the issue of concurrent delay at the time of negotiating and finalising the contract and consequently reducing the risk of disputes arising in respect of concurrent delay over the duration of the project. However, no suggestion on how the Parties should address the issue of concurrent delay has been included.

Claims

FIDIC seeks to make a clear distinction between claims and disputes in the proposed second edition of the Yellow Book. Whereas in the first edition, claims and disputes were dealt with under the same clause (clause 20), the second edition deals with claims and disputes under two discrete clauses (clauses 20 and 21 respectively) therefore placing an emphasis on the difference between the two. In the pre-release second edition a Claim is defined as a request by one Party to the other Party for an entitlement or relief under the Contract and a Dispute is defined as any situation where a Claim is otherwise rejected or ignored.

The procedural mechanism for both the Employer and Contractor to submit claims under the current edition of the Yellow Book are outlined in two discrete clauses (sub-clauses 2.5 and 20.1 respectively). However, under the pre-release second edition the procedural mechanism for both the Employer and the Contractor to submit claims has been merged together in an expanded sub-clause (20.1 and 20.2 of the pre-release second edition). The claim procedure is now much more detailed, with the procedure in Sub- Clause 20.2 alone being almost 3 pages in length.

Under the new procedure both the Employer and the Contractor are now subject to the same 28-day time bar for making claims. In the current edition it is only the Contractor that is subject to this time bar, whereas the Employer is simply required to give notice as soon as reasonably practicable. As well as a time bar in respect of notifying the claim there is a 42 day time bar relating to submission of fully detailed particulars in support of the claim. The 42 days running from the time that either the Employer or the Contractor became aware or ought to have been aware of the event or circumstance giving rise to the claim. The Parties are also required to give Notice, which has now been defined as a written communication identified as a Notice. The Notice must also include reference to the Sub-Clause of the Contract under which it is issued. This is all as set out in Sub-Clause 1.3 of the pre-release second edition. This change has been introduced in attempt to avoid disputes arising between the Parties in respect of what constitutes valid notice.

The Engineer has a positive obligation on receipt of the notice to give a preliminary response within 14 days if it considers the claim is time barred. In the event that the Engineer issues such a response, the claiming party may, if it believes there are circumstances which justify the late submission of its claim, apply to the DAB the time bar waived. When deciding whether or not to waive a time bar the DAB will consider whether the other Party would be prejudiced by acceptance of the late submission, whether the other Party had prior knowledge of the event in question or basis of claim and the extent to which, if at all, the Engineer may already have proceeded to make determination, or more likely sought to negotiate or agree.

It is thought that these changes have been introduced in an attempt to achieve balance and reciprocity between the Parties. However, this longer and more detailed procedure is likely to lead to a greater administrative burden being placed on the Parties.

Dispute Avoidance / Adjudication Board (the "DAB")

The change in the definition of the DAB from the "Dispute Adjudication Board" to the "Dispute Avoidance / Adjudication Board" in the pre-release second edition is telling of FIDIC's intention to encourage the DAB to adopt a more pro-active role in dispute avoidance and resolution. The changes proposed in the second edition require the DAB to be a standing DAB. This will mean DABs being constituted from the outset of a project, as in the current edition of the Red Book. The pre-release second edition provides that the Parties may jointly refer a matter to the DAB with a request for assistance and / or to formally discuss and attempt to resolve any disagreement between them. The DAB also has the power to invite the Parties to refer an issue in dispute if it becomes aware of it. The primary purpose of the DAB is to prevent claims from becoming disputes.

Impact

The proposed changes to the second edition of the Yellow Book are substantial and if published will have a wide reaching impact on those in the industry. Of the most significance, is the increased emphasis on process and procedure. Whilst the rationale, to re-balance risk between the Parties by encouraging reciprocity, will no doubt be welcomed by the industry and in particular contractors, these changes will no doubt place a greater administrative burden and cost on the Parties.

Additionally, the impact of these changes on international projects, particularly those in the Middle East (where the 1987 and 1999 suite of contracts are still widely used) is unlikely to be seen for some time. In a "take it or leave" type of market such as the Middle East it is hard to envisage Employer's seeking to adopt the new 2017 editions any time soon. It also remains to be seen how the strict notice provisions that have been proposed in the pre-release second edition will fit in with the laws of certain civil law jurisdictions where contractual notice provisions are not enforced as stringently as in common law jurisdictions.

It is of course important to remember that FIDIC has not yet published the final version of the new edition of the Yellow Book, which as mentioned above they have promised to do later this year. Therefore, they will no doubt be taking soundings between now and then and this may result in them revisiting the changes proposed in the pre-release edition.

Originally published May 2017.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
In association with
Related Topics
 
Related Articles
 
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions