United States: District Department Of The Environment Finalizes Rulemaking On Stormwater Management, And Soil Erosion And Sediment Control

Amy Edwards is a partner in our Washington D.C. office

Rulemaking Imposes Most Stringent Stormwater Retention Requirements in the U.S. and Establishes Novel Stormwater Retention Credit Trading Program

The District Department of the Environment (DDOE) finalized its rulemaking on Stormwater Management, and Soil Erosion and Sediment Control (Stormwater Rules) on July 19, 2013. The Stormwater Rules, which were issued in order to comply with requirements contained in the District's Municipal Separate Storm Sewer System (MS4) permit,1 seek to reduce the runoff of stormwater from impervious surfaces in the District into its waterways. Given its central role in effectuating this new regulatory regime, the development community should expect to face new planning, design and construction requirements, as well as additional operational expenses over the life cycle of new development and renovation projects. Other states and jurisdictions across the country may choose to issue rules similar to those in the District.

The Stormwater Rules will be phased in over the next two years to apply to regulated projects as follows:

Notable aspects of the Stormwater Rules include:

  • requirements for certain new developments and renovation projects to retain substantial volumes of stormwater on-site using a combination of approved best management practices (BMPs); up to half of these retention requirements can be achieved through the payment of an in-lieu fee to DDOE or the purchase of stormwater retention credits
  • creation of a novel Stormwater Retention Credit Trading Program, through which credits can be bought and sold on an open market until they are used by regulated projects to comply with applicable retention requirements
  • new required practices to minimize soil erosion and sediment runoff at construction sites
  • the requirement to designate a certified "responsible person," who will be responsible for inspecting for erosion and sedimentation issues and working with DDOE to resolve those issues as they arise

Stormwater Retention Requirements

The Stormwater Rules will reduce stormwater runoff primarily by requiring major regulated projects to capture and retain substantial volumes of stormwater that would otherwise be diverted into the District's local waterways. Two types of major regulated projects will be subject to these stormwater retention requirements:

  • Major Land Disturbing Activities. Sites that disturb 5,000 square feet or more of land will be required to retain the quantity of stormwater that would result from a 1.2 inch rainfall.2
  • Major Substantial Improvement Activities. Renovation projects in existing structures with a combined footprint of 5,000 square feet for which the project costs exceed 50 percent of the structure's assessed value, will be required to retain the quantity of stormwater that would result from a 0.8 inch rainfall.3

A given site's stormwater retention requirement is commonly referred to as its stormwater retention volume (SWRv). Sites must achieve at least half of their SWRv using on-site retention infrastructure, while the remainder can be achieved using certain off-site retention mechanisms (described below).

Stormwater may be retained on-site using any combination of 13 approved BMPs. Approved BMPs include green roofs, rainwater harvesting, impervious surface disconnections, permeable pavement, bioretention, infiltration, ponding and wetland development. Each BMP is subject to detailed design, construction and landscaping criteria, which are set forth in the accompanying Stormwater Management Guidebook.4

Although major regulated projects will be able to achieve their applicable SWRv using any combination of these approved BMPs, many of them may not be suitable in certain common development contexts. For example, high-density developments that extend from lot line to lot line will not be able to incorporate surface BMPs, such as ponding or wetland retention. Additionally, major substantial improvement activities may be limited by space and load restrictions that could preclude the use of certain BMPs, such as heavy green roofs or large rainwater harvesting cisterns. However, regardless of which specific BMPs they select, all major regulated projects should expect stormwater retention infrastructure to become an integral component in the building's design, construction and operations.

Major regulated projects may apply for relief from the applicable on-site SWRv requirement based on the existence of extraordinarily difficult site conditions that make achieving the SWRv technically infeasible or environmentally harmful.5 Evidence of such extraordinarily difficult site conditions could include:

  • soil and groundwater contamination
  • data from percolation testing
  • the presence of utilities requiring impermeable protections or a setback
  • restrictions having the force of law that affect the site,
  • evidence that installation of a BMP would conflict, in certain circumstances, with the terms of (1) a concept review by the Historic Preservation Review Board, (2) a concept review by the Commission on Fine Arts, (3) a design submission by the National Capital Planning Commission, (4) a variance or special exception from the Board of Zoning Adjustment, or (5) a large tract review by the District Office of Planning

Regulated projects located in certain areas are subject to unique stormwater retention requirements:

  • Major Land Disturbing Activities in the PROW. Major land disturbing activities consisting of bridge, roadway and streetscape projects located in the existing public right of way (PROW) are subject to applicable stormwater retention requirements only to the maximum extent practicable (MEP). This is achieved when each opportunity for installing stormwater retention capacity has been exhausted.6
  • Anacostia Waterfront Development Zone Sites. Sites located in the Anacostia Waterfront Development Zone that are publicly owned or publicly financed (AWDZ sites) are required to treat a water quality treatment volume (WQTv) equal to the difference between the stormwater runoff that would result from a 1.7 inch rainfall and the applicable SWRv. Additionally, the SWRv for major substantial improvement activities in the AWDZ is 1 inch, rather than the 0.8 inches applicable elsewhere in the District.7

Off-Site Stormwater Retention

In possibly the most novel aspect of the Stormwater Rules, DDOE will allow major regulated projects to achieve up to half of their applicable SWRv through off-site retention, either by payment of an in-lieu fee or purchase and submission of stormwater retention credits (SRCs, or credits).

  • Payment of In-Lieu Fees. The in-lieu fee represents the full life cycle cost of retaining one gallon of stormwater for one year.8 The in-lieu fee will initially be set at $3.50/gallon/year, and will be adjusted for inflation annually, based on the Urban Consumer Price Index.9 All in-lieu fees are to be deposited into a special purpose revenue fund administered by DDOE and shall be used solely to fund the design, development and maintenance of stormwater retention facilities within the District, among other related costs.10
  • Purchase and Submission of Stormwater Retention Credits. Stormwater retention credits enable regulated sites to offset a given volume of on-site retention capacity with an equal volume of off-site retention capacity, to be located elsewhere in the District. Each credit represents the offset of one gallon of retention capacity for a period of one year.11 Credits can be based on (1) new stormwater retention capacity developed after the Stormwater Rules were finalized, or (2) existing stormwater retention capacity developed since May 1, 2009.12 This capacity must not otherwise be required for compliance with other stormwater management obligations or the facility's applicable SWRv requirement. Facilities can only generate credits based on their initial 1.7 inches-worth of retention capacity. Upon certification by DDOE, credits can be sold to any interested buyer through the SRC Trading Program. Credits do not expire and there is no limit on how long credits can be banked or how frequently they can be bought and sold. By purchasing credits and submitting them to DDOE, major regulated projects can satisfy a portion of their applicable SWRv.

Stormwater Retention Credit Trading Program

DDOE has indicated that the SRC Trading Program will be structured as a modified over-the-counter (OTC) market, whereby buyers and sellers will negotiate individual transactions directly with each other; however, DDOE does have authority to review and approve proposed transactions.13 DDOE has indicated that it will make a registry of current credit owners publicly available to prospective purchasers, as well as certain transactional data, including the credit volumes and prices of completed transactions. DDOE has also indicated that it will facilitate transactions hosting periodic meetings of prospective purchasers and sellers.14

Throughout this rulemaking, DDOE has touted the use of credits and the associated trading program as a highly innovative solution to the problem of stormwater retention. However, with innovation comes great uncertainty, and indeed, many questions remain unanswered, including the following:

  • First, it remains unclear how large the credit market is likely to be. DDOE has indicated that there is sufficient existing eligible retention capacity to provide an initial supply of 4 million credits. However, this estimate is dependent on DDOE conducting substantial outreach to eligible buildings — an effort that, to date, it has not yet started.
  • Second, even by DDOE's own estimates, the anticipated demand for credits is highly uncertain. Indeed, DDOE's most recent public estimates are that potential demand for credits will be between 0.5 and 10.4 million in 2015, between 1 million and 15.6 million in 2016, and between 1.5 and 21 million in 2017.15
  • Third, without estimates of likely supply and demand, it is impossible to forecast credit prices with any degree of accuracy. DDOE has estimated that credit prices are likely to be no less than the cost to develop and maintain the underlying retention capacity and no more than the in-lieu fee — an initial range that DDOE estimates to be between $.94 and $3.50. However, it remains to be seen how high — and how volatile — prices will actually be.

Compounding these uncertainties, DDOE has not clarified exactly how heavily it intends to regulate the credit market. The development community has emphasized that DDOE's imposition of excessive regulatory burdens or delays would be harmful to the market's function; however, the exact degree to which DDOE will interfere with the free flow of credits in the market is still unknown.

Phased Implementation

The process by which the stormwater management regulations are to be implemented have been notably controversial throughout the rulemaking process. Under the District's MS4 permit, the Stormwater Rules were required to be finalized no later than July 22, 2013. Environmental advocates have argued that the stormwater management regulations should be implemented in full immediately upon finalization. By contrast, the development community cautioned that such hasty implementation would be detrimental to numerous regulated projects currently under development, since forcing them to effectively restart the planning and design phases would impose significant additional costs that could scuttle the entire project. Recognizing that much of the planned stormwater retention will depend upon supporting continued development subject to the more stringent regulations, DDOE will implement the stormwater management regulations according to a two-year transition plan, to proceed in the following phases:16

  • Transition Period 1. During the first transition period, major regulated projects will be grandfathered under the old regulations. This transition period will extend from July 19, 2013, until January 15, 2014.
  • Transition Period 2. During the second transition period, major regulated projects will be subject to the new stormwater management regulations, except for the 50 percent minimum on-site retention requirement, such that they will be able to achieve their entire SWRv using off-site retention through a combination of in-lieu fee payments and SRCs. Also during this period, projects subject to a conflicting regulatory approval can apply for relief from extraordinarily difficult site conditions. This period will extend from January 15, 2014, until January 15, 2015, for major land disturbing activities and until July 14, 2015, for major substantial improvement activities.
  • Full Implementation. After the conclusion of the second transition period, the new stormwater management regulations will become fully effective for all regulated projects.

Throughout this phased implementation, major regulated projects will qualify for each phase based on the timing of the submission of a stormwater management plan as part of a complete building permit application.17

Soil Erosion and Sediment Control

Responsible Personnel

All sites disturbing more than 5,000 square feet of land area shall designate a "responsible person," who shall ensure that all activities at the site are in compliance with the soil erosion and sediment control regulations, inspect the site periodically and after rainfall events for potential or actual instances of erosion, and be available to respond to potential or actual erosion issues and speak on site with DDOE staff as necessary.18 Individuals licensed in the District as a geotechnical engineer, land surveyor, or architect can serve as responsible personnel without any additional certification. Other individuals can serve as responsible personnel upon certification by an approved course on erosion control.19 However, to date, DDOE has not approved any such courses. It thus remains to be seen how difficult obtaining certification will be.

Soil Erosion and Sediment Control Restrictions

The Stormwater Rules contain a range of new restrictions on a variety of projects to reduce the soil erosion and sediment runoff that could ultimately flow to the District's waterways:

  • Land-Disturbing Sites Over 5,000 Square Feet. every project involving land-disturbing activities must submit a soil erosion and sediment control (SESC) plan to DDOE for approval.20 SESC plans must address a variety of considerations, including (1) the existing and proposed topography of the site, (2) proposed grading activities, (3) provisions for storm drainage, (4) provisions to minimize on-site erosion and prevent offsite sedimentation, (5) the planned sequence of construction, and (6) recommendations of a professional engineer regarding areas with unstable soils, among other issues.21 Additionally, sites disturbing more than 5,000 square feet of land area shall also adhere to the Stormwater Pollution Prevention Plan that is provided in the Stormwater Management Guidebook.22
  • Roadway Projects. Roadway projects awaiting installation of utilities and pavement shall install interceptor dikes and other controls at regular intervals along the roadway, as well as diversion infrastructure to carry runoff down cut-and-fill slopes to an approved outlet. Roadway projects must also install permanent drainage infrastructure upon completion of rough grading.23
  • Demolition Projects. Projects involving demolition, razing, or other activities likely to result in the escape of dust, debris, and other sediments from the site must adopt measures to minimize stormwater erosion, maximize the preservation of natural vegetation and install perimeter dikes, as necessary. Notably, such projects near District waterways must avoid disturbing land within a 25-foot buffer of the waterway, subject to certain limited exceptions.24
  • Underground Utility Projects. Underground utility projects will be prohibited from exposing more than 500 linear feet of open trench at any one time, restrict the placement of excavated material during the project, and mandate the installation of interim and permanent stabilization upon completion of the project and refilling of the trench.25

Implementation

As DDOE now transitions to implementation of the Stormwater Rules, it will have to address a number of crucial issues that remain unresolved or may prove to be infeasible once they are put into practice. A few specific issues that will have to be addressed during the initial implementation phases include:

  • Selection of Approved BMPs. Although DDOE has approved 13 distinct BMPs, it is not clear how many of these choices will be effectively available to any given project. Some projects may be subject to space and load bearing limitations, while others may face economic constraints that restrict the use of costly technologies. Other BMPs simply remain untested as to their utility, durability and maintenance costs, thus they are likely to be avoided by planners and builders. If major regulated projects are unable to achieve the applicable SWRv using the currently approved BMPs, DDOE will have to work with the development community to identify and approve additional retention technologies.
  • Major Substantial Improvement Activities. The Stormwater Rules do not address a variety of issues specifically applicable to major substantial improvement activities, which are expected to face particular difficulties in complying with the stormwater management requirements. For example, it is not clear how renovations on multi-building campuses, such as the District's hospitals and universities, are to be calculated. It is also not clear the extent to which buildings undergoing major substantial improvement activities will have to conduct otherwise unnecessary renovations simply to accommodate the required stormwater retention capacity. Overly onerous requirements could deter property owners from improving their buildings, and DDOE may need to provide additional accommodations if the Stormwater Rules prove to be infeasible or counterproductive.
  • Use of In-Lieu Fee Funds. Although the Stormwater Rules clearly require DDOE to use in-lieu fees solely for the development and maintenance of additional stormwater retention capacity in the District, it is not clear where those facilities will be located, and whether they will compete for space with other facilities that would otherwise be used to generate credits. Excessive competition between credit-generating facilities and those maintained using in-lieu fees could inadvertently sabotage the Credit Trading Program entirely, and it will be DDOE's responsibility to find a balanced approach.
  • Size and Liquidity of the Credit Market. Numerous issues that will substantially affect the Credit Trading Program's overall success remain unresolved. Specific issues relate to the initial supply of credits, the actual cost to develop and maintain stormwater retention facilities to generate credits, and the overall size and volatility of the credit market. These issues will likely remain unresolved until the Credit Trading Program is fully operational.
  • Structure of Credit Transactions. Because the Credit Trading Program will be structured as an over-the-counter market, there is substantial uncertainty surrounding how easily prospective credit purchasers and sellers will find each other and what terms their credit sales contracts will contain. DDOE has indicated that it will publicize a register of current credit owners and convene a working group to develop model sales contracts. Moreover, the degree to which DDOE will impose onerous and lengthy credit certifications and transaction approvals remains to be seen.
  • Relationship with Other Stormwater Initiatives. The Stormwater Rules represent just one of the District's ongoing efforts to address the quality of its waterways. In February 2013, Mayor Gray issued the Sustainable DC Plan, under which all of the District's waterways are intended to be suitable for fishing and swimming, and 75 percent of the District's land area is intended to be capable of capturing or filtering stormwater for reuse by 2032.26 More recently, DDOE has also promulgated rules for its new Stormwater Fee Discount Program.27 Managing these programs and initiatives will require careful coordination by DDOE over the coming months.

Conclusion

Despite the many uncertainties surrounding the implementation of the Stormwater Rules, it is increasingly clear that stormwater management is an issue of growing concern for many jurisdictions and one that members of the development community will have to seriously consider in future projects. Multiple states in the Chesapeake Bay watershed have established formal programs to reduce runoff, some of which include nutrient credit trading programs.28 Other states and local jurisdictions have begun imposing stormwater fees based on the extent of impervious areas.29 Planners, designers and other members of the development community should therefore expect stormwater management considerations to become an increasingly prominent aspect of their work on new development and major renovation projects for the foreseeable future.

Footnotes

1 EPA, NPDES Permit No. DC0000221 (Sept. 30, 2011), available at http://www.epa.gov/reg3wapd/npdes/dcpermits.htm.

2 Stormwater Rules, §520.3

3 Stormwater Rules, §522.4.

4 DDOE, Stormwater Management Guidebook, Chapter 3.

5 Stormwater Rule part 526.

6 Stormwater Rules, §521. 2.

7 Stormwater Rules, §524.5(b).

8 Stormwater Rules, §530.1.

9 Stormwater Rules, §530.2.

10 Stormwater Rules, §530.6.

11 Stormwater Rules, §531.3. Note that AWDZ sites will be required to submit 1.25 credits for every gallon of off-site retention. Stormwater Rules, §524.8.

12 Stormwater Rules, §534.1.

13 Stormwater Rules, §533.3.

14 DDOE, Notice of Proposed Rulemaking on Stormwater Management, and Soil Erosion and Sediment Control, 60 DC Reg. 8,493, 8,509 (Jun. 7, 2013) (hereinafter, Stormwater Second Proposed Rules).

15 Stormwater Second Proposed Rules, at 8,511.

16 Stormwater Rules, Part 552.

17 Note that the Stormwater Rules provide exceptions to this for two types of projects. First, areas of projects for which an "advanced design" has been submitted and for which approval has not expired shall comply with the requirements in place at the time of the submittal. Second, areas of multi-phased projects for which all stormwater infrastructure for all phases have been installed in compliance with a DDOE-approved stormwater management plan during an earlier phase of construction shall be deemed to have met the stormwater management requirements.

18 Stormwater Rules, §547.2.

19 Stormwater Rules, §547.3.

20 Stormwater Rules, §540.1.

21 Stormwater Rules, §542.9.

22 Stormwater Rules, §543.10.

23 Stormwater Rules, §544.3.

24 Stormwater Rules, §545.5.

25 Stormwater Rules, §546.1.

26 DC Sustainability Plan at 99-103 (Feb. 20, 2013).

27 DDOE, Notice of Final Rulemaking on Stormwater Fee Discount Program, 60 DC Reg. 10,732 (July 19, 2013).

28 Both Maryland and Virginia, among other states, administer nutrient credit trading programs to limit runoff into the Chesapeake Bay. Information regarding Maryland's program is available at mdnutrienttrading.org. Information regarding Virginia's program is available here.

29 In Maryland, all local jurisdictions in the state were required to implement a stormwater fee no later than July 1, 2013. Similar fees based on impervious land areas have also been adopted in Philadelphia, Pa.; Minneapolis, Minn.; and Richmond, Va.; and all local jurisdictions in North Carolina, among many others.p>

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
In association with
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Check to state you have read and
agree to our Terms and Conditions

Terms & Conditions and Privacy Statement

Mondaq.com (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

Use of www.mondaq.com

You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about Mondaq.com’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.

Disclaimer

Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.

Registration

Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.

Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

If you do not want us to provide your name and email address you may opt out by clicking here .

If you do not wish to receive any future announcements of products and services offered by Mondaq by clicking here .

Information Collection and Use

We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to unsubscribe@mondaq.com with “no disclosure” in the subject heading

Mondaq News Alerts

In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.

Cookies

A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

Log Files

We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.

Links

This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

Surveys & Contests

From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.

Mail-A-Friend

If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.

Emails

From time to time Mondaq may send you emails promoting Mondaq services including new services. You may opt out of receiving such emails by clicking below.

*** If you do not wish to receive any future announcements of services offered by Mondaq you may opt out by clicking here .

Security

This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to webmaster@mondaq.com.

Correcting/Updating Personal Information

If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to EditorialAdvisor@mondaq.com.

Notification of Changes

If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

How to contact Mondaq

You can contact us with comments or queries at enquiries@mondaq.com.

If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at problems@mondaq.com and we will use commercially reasonable efforts to determine and correct the problem promptly.