The Community Infrastructure Levy ("CIL"), as introduced by the Planning Act 2008 (ss205-225) ("the Act"), is a tax (in all but name) on new development.

The mechanism by which CIL operates is detailed in the CIL Regulations 2010 ("the 2010 Regulations"), which took effect on 8 April 2011. Owing to various unanticipated issues arising with its operation, the Government introduced the CIL (Amendment) Regulations 2012 ("the 2012 Regulations"), which came into force on 29 November 2012 (taken together "the Regulations").

Whilst a local planning authority ("LPA") has discretion as to whether to collect CIL or to continue to secure contributions through planning obligations (i.e. pursuant to section 106 of the Town and Country Planning Act 1990 ("the Act")), it is likely that the vast majority of LPAs will move to the CIL model in due course. In particular, whereas Section 106 Agreements tended to be reserved for larger developments and were often subject to negotiation over their terms, CIL is chargeable on most development above a (low) minimum threshold and there are few exceptions available for developers seeking to avoid payment.

As such, CIL is set to be a major consideration for developers, investors and surveyors on future projects. Unfortunately, the calculation of CIL liability can be complex. This article is intended as a brief overview of this increasingly important area.

Developments liable to CIL

CIL is chargeable on any new building or extension, which creates over 100 square metres (or less, if the development involves the creation of a dwelling). CIL does not apply to planning permissions granted for a limited period and is not applicable to buildings into which people do not normally go.

Whilst any new build with more than 100 square metres of gross internal floor space will be subject to CIL, the gross floor space resulting from (i) a change of use and (ii) any existing building on a site which is to be demolished is disregarded where it has been in lawful use for a continuous period of at least six months during the twelve months before planning permission was granted. The 2012 Regulations have corrected a previous error in the formula which meant retained floor space was not properly excluded from the total CIL liability. Unhelpfully, the 2012 Regulations have not specified any minimum part of the existing building which must remain in use in order for the floor space of the whole building to be deducted.

Calculating CIL

CIL is calculated by reference to any increase in the square footage of gross internal floor space. The charge is calculated by reference to the time when planning permission first permits development. For outline permission, this is the date on which final reserved matters approval is granted. If outline permission is phased, each phase attracts CIL separately and in respect of a full permission, CIL will be calculated on the date on which final approval is given in respect of any pre-commencement conditions.

Charging schedule

The introduction of CIL is dependent on the relevant LPA adopting a CIL charging schedule, which is to sit alongside an up-to-date development plan. The charging schedule will identify the infrastructure on which CIL receipts will be spent, which is broadly defined to include roads, schools and open spaces, but not affordable housing, as this will continue to be provided through planning obligations. All planning permissions granted in London above certain threshold are subject to both the local CIL set by the relevant London borough and the Mayor's CIL.

Once the LPA has assessed the infrastructure necessary to support the development (and mainstream funding sources have been taken into account), the remaining funding gap will be met by CIL, expressed as a pound per square metre figure. Before being formally adopted, the rates and zones set out in the charging schedule will be subject to consultation with interested parties and be approved by an independent examiner.

When and by whom is CIL payable?

Any party can assume liability for CIL by serving "an assumption of liability notice" on the collecting authority prior to commencing development. Once works begin to implement a development, the party who has assumed liability must then serve a "commencement notice," which triggers the charge to CIL. The collecting authority will then send to the applicant, the owner and any party who has assumed liability, a Liability Notice specifying the amount payable and providing a 60 day payment window. The assumption of liability notice can be withdrawn prior to commencement or transferred before the final payment is due. The liability is registered as a local land charge and will pass to successors in title.

Where no one has assumed liability for the levy, liability vests in the landowner by default (which includes any leaseholder with a residue of over seven years) upon commencement of development. Where there is more than one freeholder/leaseholder then the LPA will apportion liability between owners according to the value of each interest. Purchasers will want to ensure that the assumption of liability is clearly dealt with in advance of the transfer of land as any unpaid CIL relating to development already carried out could be imposed on them.

Relief, exemption and payment-in-kind

The Regulations grant full relief from CIL where the chargeable development will be used wholly or mainly for charitable purposes. Relief is also granted on those parts of a chargeable development, which are intended to be used as social housing. This relief is subject to a "clawback" provision if the development no longer qualifies within seven years of commencement. The 2012 Regulations have amended the formula used to calculate social housing relief to ensure it is not wrongly credited to developments.

Charging authorities also have discretion to grant relief in "exceptional circumstances" where the cost of complying with the existing section 106 agreement relating to the chargeable development is greater than the CIL payable, such that paying the full CIL charge in addition to the s106 contribution would threaten the development's viability.

The Regulations also permit charging authorities to accept transfers of land and existing buildings as payment for CIL provided that the intention is to use the land for infrastructure to support the development.

Enforcement

In addition to surcharges and interest for late payments, LPAs can issue a Levy Stop Notice, which prohibits development from continuing until payment is made or seek a court's consent to seize and sell assets of the liable party. In extreme circumstances of non-compliance, the liable party may be subject to a short prison sentence.

Differential residential CIL rates

Rates of CIL aim to reflect the balance between the desirability of funding infrastructure and ensuring they do not put the viability of development at risk. The Regulations provide little guidance on how the balance should be struck.

The Guidance to the 2012 Regulations published on 14 December 2012 ("the 2012 Guidance") recognises that LPAs may decide to set differential CIL rates by reference to specific geographic zones or intended uses of development provided the viability evidence supports this. A review of charging schedules currently proposed and adopted by LPAs suggests that differential charging rates are being used by LPAs to maximize revenues from high value areas. For example, the London Borough of Wandsworth's charging schedule imposes a small number of differential rates for specific zones in its area. Adopted on 11 July 2012, its charging schedule sets a levy of GBP 575 per square metre for the residential development in the riverside area of Nine Elms, in comparison to GBP 250 per square metre levied in other areas of the authority and a zero rate for Roehampton. Whereas the London Borough of Redbridge has opted to charge a flat rate of GBP 70 per square metre, to ensure overall viability of development throughout the authority, regardless of use or location.

The CIL rates proposed by some LPAs also seek to distinguish between types of residential development. By way of example, Plymouth Council's revised draft charging schedule suggests a zero rate for high-rise (6 storeys or more) residential developments in the city centre, which have notoriously high build costs, whilst purpose-built student accommodation which have the potential for long-term rental income, attract a rate of GBP 60 per square metre. It is clear that ensuring viability remains a significant issue for residential schemes in many areas. It appears entirely for the LPA to decide how much infrastructure costs it wishes to recover, and the Regulations seem to offer no opportunity for developers to challenge these rates even if these are based on a series of high-level assumptions by the LPA.

CIL and s106 Agreements

To avoid a situation where the developer pays CIL and is also asked to contribute to infrastructure through a s106 agreement, Regulation 123 requires LPAs to publish a list of the items or types of infrastructure it intends to fund through CIL. The LPA cannot then seek the provision of, or contributions towards, those items through S106 obligations. However, to cater for instances where the CIL raised is likely to be less than the value of s106 obligations, LPAs can publish a Regulation 123 statement on their website, which exempts certain infrastructure from CIL funding.

Since the introduction of the Regulations, the scope of Section 106 agreements has largely been restricted to focus on site-specific mitigation measures, such as affordable housing. Regulation 122(2) places on a statutory footing, the policy test previously contained in Circular 05/2005. It is now unlawful for a planning obligation to constitute a reason for granting planning permission, if it is not: (i) necessary to make the development acceptable in planning terms; (ii) directly related to the development; and (iii) fairly and reasonably related in scale and kind to the development. These now mandatory legal requirements have the potential to allow developers to argue as to the lawfulness of certain financial obligations.

The Regulations acknowledge that there is a transitional period for scaling back s106 obligations. At present, pooled contributions may be sought from separate planning obligations for larger scale infrastructure projects. However, on the local adoption of a CIL charging schedule, or nationally after 6 April 2014, LPAs will no longer be able to pool contributions under planning obligations from more than five developments toward a particular infrastructure project or type of infrastructure. The limited ability of LPAs to pool contributions will force a greater proportion to adopt the 'optional' levy.

However, the role of planning obligations may not be as circumscribed as the Regulations suggest. Notably, the 2012 Guidance acknowledges the continued role of s106 agreements and seeks instead to ensure LPAs are more transparent with developers as to what they are expected to pay for and through which route. The 2012 Guidance is a welcome attempt to (amongst other things) encourage LPAs to tie their Regulation 123 lists and section 106 policies to the examination stage and to clarify those matters for which a s106 contribution will be sought. However, in practice, there is still a risk that developers may find themselves in a position where they have to pay via both s106 and CIL to ensure the provision of adequate infrastructure. Entering into a s106 agreement, pursuant to which both parties covenant to provide infrastructure to a particular timescale gives developers the confidence to bring sites forward for development. In contrast, there is no guarantee with the CIL regime that the money spent on CIL will lead to the delivery of infrastructure necessary for a particular development; it could be used to fund infrastructure anywhere in the authority's administrative area. Further, under the CIL regime, the responsibility for delivering this infrastructure rests with the LPA, which brings with it the obvious potential for development to be held back. In the short term, the potential for double-payment is very real and could serve to make many sites unviable for development, particularly when in the current economic climate the additional costs cannot realistically be added to house prices.

The 2012 Regulations

The 2012 Regulations were brought into force to amend the largely unintended consequences of the 2010 Regulations. Notably, the 2010 Regulations provided that when an application is made to amend a planning permission pursuant to s73 of the Act, full CIL liability is triggered for the whole floor space of the development, even if it has been paid on the original permission or if a charging schedule has come into force since the date of the original permission. This is because a s73 consent comprises an entirely new permission attracting its own CIL liability.

The 2012 Regulations provide that where an application is made to vary a consent, which was granted before the LPA has introduced CIL, the CIL liable is that chargeable on the s73 consent minus the CIL that would have been payable on the original permission (using the charging schedule in force at the time the s73 permission is granted for calculation purposes). If a charging schedule is in place both at the time of the grant of original permission and when the variation to the permission is granted and CIL has already been paid, this amount can be credited against the amount due, so that CIL will not be payable twice for the same development. The 2012 Regulations also confirm that CIL will not be payable on planning permission replacing extant and unimplemented permissions granted before 1 October 2010. Taken together, these are largely common sense amendments to the Regulations which should help to achieve implementable planning permissions.

As a nod to the introduction of the Localism Act 2011, the 2012 Regulations extend CIL liability to those developments consented under a Neighbourhood Development Order, and provide that funds raised by CIL can be spent on the operation and maintenance of infrastructure and not just initial capital expenditure. Proposals the Government consulted on at the end of 2011, namely the requirement on LPAs to pass a "meaningful proportion" of CIL to neighbourhood bodies and proposals to allow LPAs to use CIL to provide affordable housing, have been omitted.

Summary

The introduction of CIL was intended to be a more transparent and predicable regime than the current system of planning obligations. However, the complexity of the Regulations means that ascertaining the potential costs of development at the outset will remain a challenge. The use of difficult formulaes, the ambiguities surrounding the discounts in respect of existing buildings in lawful use, and the tension between CIL and s106 agreements will make it difficult to assess the planning gain of any prospective development. It remains to be seen whether the CIL regime will strike the right balance between securing the provision of local infrastructure and setting rates at a level that does not hinder development.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

 
In association with
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Check to state you have read and
agree to our Terms and Conditions

Terms & Conditions and Privacy Statement

Mondaq.com (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

Use of www.mondaq.com

You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about Mondaq.com’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.

Disclaimer

Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.

Registration

Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.

Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

If you do not want us to provide your name and email address you may opt out by clicking here .

If you do not wish to receive any future announcements of products and services offered by Mondaq by clicking here .

Information Collection and Use

We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to unsubscribe@mondaq.com with “no disclosure” in the subject heading

Mondaq News Alerts

In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.

Cookies

A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

Log Files

We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.

Links

This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

Surveys & Contests

From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.

Mail-A-Friend

If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.

Security

This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to webmaster@mondaq.com.

Correcting/Updating Personal Information

If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to EditorialAdvisor@mondaq.com.

Notification of Changes

If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

How to contact Mondaq

You can contact us with comments or queries at enquiries@mondaq.com.

If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at problems@mondaq.com and we will use commercially reasonable efforts to determine and correct the problem promptly.