Ireland: Solar Energy: Why Are We Stuck In Analysis Paralysis?

Last Updated: 5 March 2018
Article by Mary Dunne

Most Popular Article in Ireland, March 2018

Solar Photovoltaics (PV) is the fastest growing deployed renewable energy technology across the world in the last decade.

Technology advances make it suitable for Northern European countries as direct sunlight is not necessary. The cost of the actual infrastructure has fallen dramatically in recent years. Between 2008 and 2013 it fell by 80% as a result of economies of scale and advances in technology, techniques and experience in installation.

Despite this, Ireland does not currently have any support mechanism in place for Solar PV as it has for wind-farms for over a decade.

This is a globally accepted requirement to enable solar energy, or any form of renewable energy technology, to gain traction and scale and be in a position to compete with other renewable technologies and with conventional energy sources.

In short, at present we have no solar energy industry worth speaking of and will not until the government subsidises the production of solar energy as it has successfully done with wind-farms.

So why have we not introduced the necessary support mechanism to enable the solar energy sector to develop? Is the government's reluctance justified?

Let's be clear, renewable energy is not free despite the fact that the wind and sun are.

Apart from the capital investment in infrastructure and on-going operation costs, renewable energy does not compete on a par with conventional energy and is supplemented by way of a Public Service Obligation ("PSO") Levy added to all electricity bills. With effect form 1 October 2017, the PSO Levy rose from €70.80 per year to €92.28 per year.

The EU Renewable Energy Directive (2009/28/EC) requires Ireland to meet 16% of its entire energy consumption from renewable sources by 2020. If it does not meet that target, Ireland will have to pay significant fines to the EU.

The Irish government has decided that in order to meet the target, the following needs to happen:

  • 40% of electricity consumed must come from renewable energy sources;
  • 12% of heat consumed must come from renewable energy sources; and
  • 10% of transport energy consumption must come from renewable energy sources.

Currently Ireland is getting close to 30% of electricity production coming from renewables but at least another 10% increase is required in a very short period.

Most of our renewable electricity comes from onshore wind in Ireland. However, wind projects take considerably longer than solar projects to deploy and it is unlikely that onshore wind projects will bridge the 10% gap by 2020.

There is no consensus on the exact amount of the EU fines that will be imposed as it is a complex calculation but estimates in the region of €100- €150 million for each 1% of the target missed seems to be the general consensus.

So leaving good sense aside for the moment and ignoring the issue of climate change, on a simple economic basis, and at a minimum, we have to weigh up the costs of potential EU fines from 2020 against the cost of the PSO levy which amounts to €496.5 million for 2017/2018. However, remember that supports the entire renewable energy market, principally wind, as well as subsiding peat energy production.

We must also factor in the wider economic benefits to Ireland that will result from the creation of a solar energy industry.

In its report, A Brighter Future: The Potential Benefits of Solar PV in Ireland1, KPMG estimate that the deployment of Solar PV in Ireland will create €2 billion in gross value added to the economy, sustain 7,300 jobs annually and bring in €0.8 billion in tax revenue.

The government is currently consulting on what type of support scheme it should introduce to supplement the next round of renewable energy projects.

The tentative recommendation is a 'technology neutral' auction process supported by a floating feed-in premium. In other words, projects with similar viability gaps compete in appropriate auctions for their projects to be subsidised. The government then pays them the difference between the strike price that they bid and the price achieved for energy on the market. Therefore the investor knows that he will have cash flow and price certainty to enable him to make the necessary infrastructure investment.

This has attracted significant criticism from the solar energy industry, potential investors and the Green Party who believe that there should be a specific target for solar projects and that solar projects should not have to compete with the established and government-supported wind-farm market.

For those who remember the torture of the first wind-farm projects in Ireland, this argument is not without merit. Ironing out the planning, environmental, infrastructure installation, regulatory and investor issues when a technology is establishing itself in a new market, means that the first large ground mounted Solar PV projects will take longer than they will in three years' time when experience and scale has made the process smoother, quicker and less expensive.

Whilst the consultation document does say that it will hold multiple auctions and may need separate auctions for emerging/less mature technologies, there is no firm commitment either way to solar.

Further, the government consultation document looks at a support system for large scale ground mounted Solar PV projects only. It does not look at the potential support system required for small scale domestic and commercial rooftop solar panels which offers a valuable source of renewable energy.

So we are heading for very significant fines in 2020 and every year thereafter that we fail to meet the EU's increasing targets.

Deploying solar energy projects would contribute towards achieving our targets, avoiding or reducing EU fines and would significantly contribute to the wider economy which is in stark contrast to supporting environmental policies that this government supports.

Ireland's renewable energy market is almost entirely dependent on wind and in order to encourage complimentary sectors such as Solar PV, initial government support is needed to encourage initial investment, achieve economies of scale and allow Solar PV to become a predictable investor infrastructure class.

Whilst consultation is inherently a good thing, it can also be the cause of analysis paralysis and that is where we have found ourselves in Ireland. Projects are ready to go and we don't have a support mechanism in place which also has to get State Aid clearance from Europe.

There is no perfect solution; the support system will need adjusting as technology improves and costs come down. However, this has been done in many other EU countries in Europe with similar regulatory constraints.

As Winston Churchill once said: "The maxim 'nothing but perfection' may be spelled 'paralysis'."

Footnote

1. (Published in October 2015)

Originally published by Renewable Energy Magazine.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
In association with
Related Topics
 
Related Articles
 
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions