India: Salient Features Of The Government Of Maharashtra Notified Rules Under RERA

The Real Estate (Regulation and Development) Act, 2016 (Act) was enacted on 25 March 2016. A total of 59 sections were notified by the Central Government on 27 April 2016, which came into force on 1 May 2016. The remainder sections of the Act were notified on 19 April 2017 and will come into force from 1 May 2017. Additionally, the Government of Maharashtra has notified and published the Maharashtra Real Estate (Regulation and Development) (Registration of real estate projects, Registration of real estate agents, rates of interest and disclosures on website) Rules, 2017 and the Maharashtra Real Estate (Regulation and Development) (Recovery of Interest, Penalty, Compensation, Fine payable, Forms of Complaints and Appeal, etc.) Rules, 2017 under Section 84 of the Act on 20 April 2017 (Rules).

The Act and Rules are only applicable to new and ongoing residential and commercial projects. Ongoing projects are those projects which have not received an occupation certificate or a completion certificate on the date of commencement of the entire Act (i.e. on 1 May 2017) (Date of Commencement). The Act prescribes the establishment of a Real Estate Regulatory Authority (Regulatory Authority) and Real Estate Appellate Authority (Appellate Authority) for a fast track adjudication of consumer grievances.

This Newsflash sets out the salient features of the Rules in relation to - the registration of new and ongoing projects, promoter's disclosure requirements as to projects on the website of the Regulatory Authority, consequences of revocation of registration of projects and penal provisions.

Registration of Projects (New and Ongoing)

  • From the Date of Commencement, in case of new projects, a promoter cannot advertise, market, book, sell or offer for sale, or invite persons to purchase any apartment unless he registers his project with the Regulatory Authority.
  • However, in case of ongoing projects, the promoter has to make an application for registration to the Regulatory Authority, within 3 (three) months from the Date of Commencement. The Rules further clarify that at the end of 90 days from the Date of Commencement, the promoter cannot advertise, market, book, sell or offer for sale or invite persons to purchase (in any manner) any plot, apartment or building (in respect of such land parcel) unless this independent phase has been registered as a separate real estate project.
  • Projects where the land area is less than 500 square meters or comprises of less than 8 (eight) apartments are exempted from applying for registration under the Act.
  • Where the project is to be developed in phases, every such phase shall be considered a standalone project, and the promoter shall obtain registration under the Act for each phase separately.

Additional Requirements with Respect to the Time Period for the Completion of Construction of the Project

  • In case of new projects, the promoter is required to declare the time period within which he intends to complete the construction of the project, failing which, the registration will lapse.
  • In case of ongoing projects (specifically buildings), the promoter is required to mention the extent of:

    • the construction work completed as per the last approved sanctioned plan of the project; and
    • the development of common areas, amenities etc.
    along with expected period of completion of on-going project, which has to be commensurate with the extent of development already completed.
  • Under the Act, the period of registration may be extended by the Regulatory Authority due to specified force majeure events. In certain cases, it may be extended on account of reasonable circumstances but such an extension shall not exceed 1 (one) year in aggregate. In addition to this, the Rules provide that the registration period may be extended, where actual work (as per the sanctioned plan) could not be carried by the promoter due to:

    • specific orders relating to the project from any court of law or tribunal, competent authority, statutory authority, high power committee inter alia; or
    • due to such mitigating circumstances, as may be decided by the Regulatory Authority.

Additional Information to be Furnished at the Time of Registration

The promoter is also required to furnish the following additional information and documents at the time of registration of the project with the Regulatory Authority:

  • Legal title report by a practising advocate;
  • Where the promoter is not the owner of the land: consent of land owner along with a copy of the collaboration agreement, development agreement, joint development agreement or any other agreement, entered into between the promoter and such owner;
  • Details of proceedings which are sub judice in respect of the land;
  • Sanctioned plan along with proposed floor space index (FSI) / transferable development rights (TDR) to be utilised in accordance with the Development Control Regulation, 1991 (DCR);
  • Details of amenities and common facilities (including common areas, parking space) as per the sanctioned plan;
  • Sanctioned number of building(s) or wing(s) plus proposed number of building(s) or wing(s);
  • Sanctioned number of floors in respect of each building or wing plus proposed number of floors;
  • Proposed plan and proposed layout plan of the whole project;
  • Aggregate area in square meters of recreational open space;
  • Architecture and design standard, type of construction technology, earthquake resistant measures; and
  • Nature of the organisation of the allottees to be constituted.

Information and Certificates to be Submitted by the Promoter in case of Ongoing Projects

In case of ongoing projects, the promoter is required to submit the following information and certificates with the Regulatory Authority:

  • In respect of buildings, the extent of: (a) the construction work completed as per the last approved sanctioned plan of the project; and (b) the development of common areas, amenities etc., along with expected period of completion of on-going real estate project;
  • An architect's certificate certifying the percentage of completion of construction work of each of the building / wing of the project;
  • An engineer's certificate certifying the estimated balance cost to complete the construction work of each of the building / wing of the project;
  • Chartered accountants' (CA) certificate certifying: (a) the estimated balance cost to complete the project; (b) the balance amount of receivables from the apartment(s) / flat(s) / premise(s) sold or allotted, in respect of which agreements have been executed; and (c) the estimated amount of receivables in respect of unsold apartment(s) / flat(s) / premise(s) calculated at the prevailing annual statement of rates (ASR) on the date of certificate.

Withdrawal of 70% of Realisation to be Deposited in a Separate Account

  • As per the Act, it is mandatory for the promoter to deposit 70% of the amounts realised from the allottees, from time to time, in a separate bank account maintained with a scheduled bank (Separate Account) in order to cover the construction cost and the land cost.
  • The promoter shall be entitled to withdraw the amounts from the separate account, to cover the cost of the project, in proportion to the percentage of completion of the project. Such a withdrawal shall be permitted only after it is certified by an engineer, an architect and chartered accountant in practice and such certificates are submitted to the scheduled bank. The certificates should provide for the following:

    • An architect's certificate certifying the percentage of completion of construction work for each of the building(s) / wing(s) of the project;
    • An engineer's certificate certifying actual cost incurred on the construction work of each of the building(s) / wing(s) of the project;
    • CA's certificate certifying: (a) cost incurred on construction cost and land cost; and (b) the proportion of the cost incurred on construction cost, land cost to the total estimated cost of the project.
  • The maximum amount which can be withdrawn by the promoter from the Separate Account is determined on the basis of total estimated cost of the project multiplied by the abovementioned proportions. The promoter shall be required to follow the aforementioned procedure for each withdrawal until occupation is obtained. Upon the receipt of occupation certificate, the entire balance amount lying in the Separate Account can be withdrawn by the promoter.
  • In case of ongoing projects, the Rules clarify that amounts to be realized from the allottees after the commencement of the Act will be required to be deposited in the Separate Account. However, in case the estimated receivable is less than estimated cost of completion of project, then 100% of amount to be realized from the shall be deposited in the Separate Account. The Rules further provide a comprehensive list of factors to be considered while computing land cost and construction cost, which are as follows. As per the Rules, land cost would include:

    • Acquisition cost, lease charges overhead cost, marketing cost, legal cost and supervision cost;
    • Premium paid to obtain development rights, FSI, additional FSI, fungible FSI, and any other incentive under DCR;
    • Acquisition of TDR;
    • Consideration payable to outgoing developer;
    • Amounts payable to State Government or competent authority or any other statutory authority of the State or Central Government, towards stamp duty, transfer charges, registration fees etc.; and
    • Premium payable as per the ASR for redevelopment of land owned by public authorities.
  • In case the promoter does not incur any cost towards acquisition of the land due to inheritance, gift or otherwise, the cost of land shall be reckoned on basis of the value of the land as ascertained from the ASR prepared under the provisions of the Maharashtra Stamp Act, 1958 as on the date of registration of the project.
  • As per the Rules, construction cost would include:

    • On-site and off-site expenditure for development of project;
    • Payment of taxes, fees, charges, premiums, interest etc.;
    • Principal sum and interest payable to financial institutions, scheduled banks, non-banking financial institutions (NBFCs) or money lenders; and
    • Rehabilitation scheme i.e. expenditure incurred towards clearance of land or encumbrances for temporary transit accommodation, construction of rehabilitation building, overhead cost, ASR linked premium, fees, charges and security deposits to authorities.
  • With reference to point (iii) above, the Rules provide that construction cost shall however not include the sum which the promoter has raised and incurred by way of loan obtained from such banks, NBFCs or money-lenders, for the purpose of purchase of land for the project or for obtaining the development rights over such land.

Restriction on Addition and Alteration of Sanctioned Plan

  • As per the Act, the promoter cannot make any addition or alteration in the approved and sanctioned plans, structural designs, specifications and amenities of the apartment without the previous consent of the allottee. Further, the promoter cannot make any addition or alteration in the approved and sanctioned plans, structural designs and specifications of the building and common areas within the project without the previous written consent of at least two-thirds of the allottees (other than the promoter) who have agreed to take apartments in such building.
  • The Rules have further clarified in this context that the promoter need not obtain written consent of two-thirds of the allottees: (i) for implementation of the proposed plans / specifications which have been disclosed by the promoter in the agreement executed with the allottee, prior to registration of the ongoing project, and (ii) for any alterations or additions or modifications in the sanctioned plans, layout plans and specifications of the buildings or common areas in the real estate project which are made by promoter while complying with any direction or order, etc. issued by the competent authority or statutory authority under any law.

Revocation or Lapse of Registration

  • Under the Act, the registration of a project will lapse in case the promoter does not complete the project within the timelines so declared to the Regulatory Authority.
  • Further, the Regulatory Authority may revoke the registration of a project granted on the basis of:

    • receipt of a complaint;
    • suo moto; or
    • on the recommendation of the competent authority,
    in case the promoter, (a) defaults as to his duties the Act or the rules or regulations made thereunder; (b) violates any terms of the approvals granted for the project; and (c) is involved in any kind of unfair trade practice.
  • In the event the registration lapses or is revoked by the Regulatory Authority, the Regulatory Authority shall:

    • Debar the promoter from accessing the website in relation to the project, specify his name in the list of defaulters on its website and also inform other Regulatory Authorities in other States and Union territories about such cancellation;
    • Facilitate the remaining development works to be carried out with the assistance of the competent authority / the association of allottees (Association) or in any other manner as may be determined by the Regulatory Authority. However, in case of revocation of registration, the Association shall have the first right of refusal for carrying out the remaining development works; and
    • Direct the scheduled bank holding the project back account, to freeze the account and thereafter take such further necessary actions, including consequent de-freezing of the said account, towards facilitating the remaining development works in the manner mentioned above in point (ii).
  • In addition to the consequences of revocation of registration of a project as prescribed under the Act, the Rules prescribe the following additional consequences:

    • Prior to revocation, the Regulatory Authority shall give notice to the competent authority under the Act / Rules as well as to the Association; and
    • While facilitating the remaining development work, the Regulatory Authority shall take such measures as may be required to protect the interest of mortgagees and investors who have been disclosed by the promoter to the Regulatory Authority and are also displayed on its website.
  • The Regulatory Authority shall also give adequate opportunity to be heard to debt and equity investors in the project. Such investors include scheduled banks, housing finance companies, insurance companies, NBFCs operating as asset finance companies, investment companies, loan companies, investment finance companies, infrastructure debt funds, micro finance Institutions, foreign direct investors, private equity funds, REITs inter alia.

Registration Fee

The fee for registering a project is set at INR 10 (ten) per square meter subject to a minimum of INR 50,000 and maximum of INR 1000,000.

Important Definitions

The Rules provide for additional important definitions such as 'Phase of a Real Estate project' and 'Covered parking space' in the follow:

  • "Phase of a project" may consist of a building or a wing of the building in case of building with multiple wings or defined number of floors in a multi-storeyed building/wing.
  • "Covered parking space" means an enclosed or covered area as approved by the Competent Authority as per the applicable Development Control Regulations for parking of vehicles of the allottees which may be in basements and/or stilt and/or podium and/or space provided by mechanised parking arrangements but shall not include a garage and/or open parking.
  • The Rules also permit a promoter to sell covered parking space to an allottee.

Rate of Interest Stipulated

The rate of interest payable by the promoter to the allottee or vice versa, shall be State Bank of India's highest marginal cost of lending rate plus 2%.

Application for Formation and Registration of Association of Allottees by Promoter

The promoter is required to observe the following timelines for filing an application for registration of the Association (being a society, company or any other legal entity) or an apex body in the form of a federation or holding entity (Apex Body):

  • In case of a single building: the promoter is required to submit an application for formation of an Association within 3 (three) months of 51% of total allottees having booked an apartment in such a building or a wing; and
  • In case of various buildings in a large layout: the promoter is required to submit an application for formation of an Apex Body of separate and independent associations within 3 (three) months from receiving the occupancy certificate for the last building constructed in the layout.

If the promoter fails to comply with the aforesaid timelines, then the Regulatory Authority can order the promoter to apply for registration or authorise the allottees to apply for registration.

Conveyance of Title

The promoter is required to observe the following timelines for conveyance of land and building in favour of an Association (being a society, company or any other legal entity) or an Apex Body when no time period has been agreed upon:

  • In case of single building: within 3 (three) months from, (i) the date of issue of occupation certificate; or (ii) having 51% of total number of allottees pay the full consideration to the promoter, whichever is earlier (subject to promoter's rights to dispose of the remaining apartment(s));
  • In case of a building/ wing in a layout:  within, (i) 1 (one) month from the date of registration of association; or (ii) 3 (three) months from the date of receipt of occupation certificate, whichever is earlier (subject to promoter's rights to dispose of remaining apartment(s) and except basements and podiums); and
  • In case of a layout: (where the conveyance pertains to the  entire undivided or inseparable land underneath all buildings along with structure of basement and podiums) within 3 (three) months of, (i) registration of an Apex Body; or (ii) from the receipt of occupation certificate for the last building or wing in the layout, whichever is earlier.

In case of failure by promoter to comply with the aforesaid time lines the Regulatory Authority shall by an order direct the promoter to convey the title to the Association or the Apex Body, as the case may be. The Association shall also be entitled to have a unilateral deemed conveyance in its favour under the provisions of Maharashtra Ownership Flats (Regulation of the Promotion of Construction, Sale, Management and Transfer) Act, 1963.

Compounding of Offence

The Rules also prescribe for compounding of offences committed by the promoter, real estate agent or allottee which are as follows:

  • Promoter:

    • If the promoter fails to comply with order of Regulatory Authority in relation to non-registration of project then instead of an imprisonment term extending up to 3 (three) years, a compounding fee amounting to 5% of the estimated cost of real estate project is applicable, which may extend up to 10%;
    • If the promoter fails to comply with the order of Appellate Authority then  instead of an imprisonment term extending up to 3 (three) years, a compounding fee amounting to 5% of the estimated cost of real estate project is applicable, which may extend up to 10%;
  • Real Estate Agent: If the real estate agent fails to comply with the order of the Appellate Authority then instead of an imprisonment term extending up to 1 (one) year, a compounding fee amounting to 5% of the estimated cost of the plot, apartment or building for which sale or purchase has been facilitated, is applicable, which may extend up to 10%; and
  • Allottee: In case the allottee fails to comply with order of Appellate Authority then instead of an imprisonment term extending up to 1 (one) year, a compounding fee of 5% of the estimated cost of the plot, apartment or building, is applicable, which may extend up to 10%.

Khaitan Comment

Starting 1 May 2017, the Act and the Rules will effectively come into force thus heralding a new era in Maharashtra's real estate and construction sector. The Act and the Rules prescribe stricter timelines with regard delivery and completion of projects, increased onus on promoters to make disclosures as well as provide for a speedy redressal mechanism for consumer grievances.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
In association with
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Check to state you have read and
agree to our Terms and Conditions

Terms & Conditions and Privacy Statement

Mondaq.com (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

Use of www.mondaq.com

You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about Mondaq.com’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.

Disclaimer

Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.

Registration

Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.

Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

If you do not want us to provide your name and email address you may opt out by clicking here .

If you do not wish to receive any future announcements of products and services offered by Mondaq by clicking here .

Information Collection and Use

We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to unsubscribe@mondaq.com with “no disclosure” in the subject heading

Mondaq News Alerts

In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.

Cookies

A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

Log Files

We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.

Links

This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

Surveys & Contests

From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.

Mail-A-Friend

If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.

Security

This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to webmaster@mondaq.com.

Correcting/Updating Personal Information

If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to EditorialAdvisor@mondaq.com.

Notification of Changes

If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

How to contact Mondaq

You can contact us with comments or queries at enquiries@mondaq.com.

If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at problems@mondaq.com and we will use commercially reasonable efforts to determine and correct the problem promptly.