India: Extension Of Mining Lease By Operation Of Law- Who Is Entitled?

The Supreme Court Of India Restores Faith Of The Mining Industry

This article provides a critique of the Hon'ble Supreme Court of India's landmark judgment dated 4 April 2016, its impact on the unsettled positions in mining laws and implications on the anguished mining industry.

  1. BACKGROUND

The Hon'ble Supreme Court of India, in Common Cause vs .Union of India1, vide its order dated 16 May 2014, inter-alia restrained 102 mining leaseholders from carrying on any mining operations on the ground that the leaseholders were not in possession of the requisite clearances and approvals for carrying mining operations ('16 May 2014 Suspension Order'). However, liberty was granted to the leaseholders to move the Hon'ble Supreme Court to revoke the 16 May 2014 Suspension Order after obtaining the requisite clearances and approvals for carrying mining operations. Pursuant to the liberty granted, several leaseholders moved the Hon'ble Supreme Court of India for lifting the 16 May 2014 Suspension Order. The Hon'ble Supreme Court noted that the vital factual-legal issue is "Whether or not the applicant-leaseholders are possessed of subsisting mining leases"2 ('subsisting lease issue') as only then the requisite clearances and approvals would be meaningful and hence, it laid down parameters for determining whether a mining lease is subsisting. The legislative intervening factor being the Mines and Minerals(Development and Regulation)Amendment Act, 2015 dated 12 January 2015 ('12 January 2015 MMDRA') was the prime reason for framing of the subsisting lease issue as several leaseholders would now seek the benefit of extension of the mining lease by operation of law up to 31 March 2030 (in case of captive purpose mining) and up to 31 March 2020 (in case of other than captive purpose mining) under the newly inserted Sections 8A(5) and 8A(6), respectively3. Furthermore, Section 8A (9) of the 12 January 2015 MMDRA, provided for exceptions to Sections 8A (5) and 8A (6), being a mining lease granted before 12 January 2015, for which "renewal has been rejected", or which has "been determined", or "lapsed". Hence, the determination of the subsisting lease issue including the parameters for a subsisting lease would have a two-fold impact on: (a) Whether the 16 May 2014 Suspension Order if revoked would be meaningful and (b) Whether the lease holders would be entitled to the extension of the lease as envisaged under Section 8A of the 12 January 2015 MMDRA.

Consequently, on 4 April 2016, the much awaited occasion was set for the Hon'ble Supreme Court of India to: (a) delve into interpretation of Section 8A of the 12 January 2015 MMDRA on extension of mining lease by operation of law which incidentally led to: (i) chronological re-iteration of the provisions of law, amendments and judicial interpretations with regard to renewals under the old Section 8 (pre-the 12 January 2015 MMDRA), and (ii) interpretation of Section 4A (4) of the Minerals(Development and Regulation)Act, 1957 ('MMDR Act, 1957') on lapsing of mining lease and (b) be the guiding light for transition from the old Section 8 to the newly inserted Section 8A of the 12 January 2015 MMDRA.

  1. KEY HIGHLIGHTS OF THE JUDGMENT DATED 4 APRIL 2016

The Hon'ble Supreme Court of India has given a clear, comprehensive and praise-worthy judgment on 4 April 2016 and has shed light on the unsettled positions in mining laws affecting the mining industry. The key highlights of the judgment dated 4 April 2016 in Common Cause vs .Union of India 4 and Prafulla Samantra & Anr. vs. Union of India & Ors.5 Matters are summarized as follows6:

(A) Subsisting Lease (to) Benefit from Section 8A of the 12 January 2015 MMDRA

  1. Mining lease period or renewal period is in currency on 12 January 2015:
  1. A leaseholder would have a subsisting mining lease, if the period of the original grant was still in currency on 12 January 2015.7
  2. A leaseholder whose original lease had expired prior to 12 January 2015 but the original lease having been renewed, the renewal period was still in currency on 12 January 2015.8
  1. Renewal Application:
  1. A leaseholder whose renewal of the mining lease already extends to a period beyond 31 March 2030/31 March 2020, the lease period of such leaseholders, would continue up to the actual period contemplated by the renewal order.9 A leaseholder whose period of renewal would expire after 12 January 2015, but before 31 March 2030/31 March 2020, the lease period would stand extended up to 31 March 2030/31 March 2020 (in the case of captive/non-captive mines, respectively).10
  2. A leaseholder would have the benefit of treating the original lease period as of fifty years. Accordingly, even during the renewal period, if the period of the mining lease would get extended (beyond the renewal period) by treating the original lease as of fifty years, the leaseholder would be entitled to such benefit.11
  3. A leaseholder who had not moved an application for renewal of a mining lease (which was due to expire, prior to 12 January 2015), at least twelve months before the existing lease was due to expire, under the provisions of the unamended MMDR Act, 1957 and the Mineral Concession Rules, 1960 is not a valid/subsisting leaseholder, after the expiry of the lease period.
  4. A leaseholder who has moved an application for renewal (of the original/first or subsequent renewal) of a mining lease, at least twelve months before the existing lease was due to expire, and on consideration such an application has been rejected, then the same is not a valid/subsisting leaseholder as per the exception created under Section 8A (9).
  5. A leaseholder who has moved an application for "first renewal" of the original mining lease, at least twelve months before the original lease was due to expire, and such application has not been rejected, the same is a valid leaseholder having a subsisting right to carry on mining operations, till the expiry of two years after 18 July 2014, i.e., up to 17 July 2016, as is apparent from a conjoint reading of the unamended and amended Rule 24A of the Mineral Concession Rules, 1960.12
  6. A leaseholder who had moved a second (third or subsequent) renewal application under Section 8(3) of the unamended MMDR Act, at least twelve months before the renewed lease was due to expire, and whose application had not been considered and rejected (though not entitled to any benefit under the unamended Section 8A of the MMDR Act and the amended Rule 24A(6) of the Mineral Concession Rules) up to 12 January 2015, would still have the benefit of sub-sections (5) and (6) of Section 8A of the 12 January 2015 MMDRA.13

(B) No automatic Lapsing under Section 4A (4) of the MMDRA, 1957 read with Rule 28, Mineral Concession Rules, 1960

  1. Unless an order is passed by the State Government declaring, that a mining lease has lapsed, the mining lease would be deemed to be subsisting up to the date of expiry of the lease period provided by the lease document. 14
  2. Wherein an application has been filed by a leaseholder, when she is not in a position to (or for actually not) carrying on mining operations, for a continuous period of two years, the lease period will not be deemed to have lapsed, till an order is passed by the State Government on such application. Where no order has been passed, the lease shall be deemed to have been extended beyond the original lease period, for a further period of two years.15
  3. A leaseholder having suffered a lapse, is disentitled to any benefit of the 12 January 2015 MMDRA, because of the express exclusion contemplated under Section 8A (9). 16

The conclusions and findings of the Hon'ble Supreme Court of India, particularly on what will be construed to be a subsisting lease (to) benefit from the extension of mining lease under Section 8A of the 12 January 2015 MMDRA and the requirement of an order to be passed for a precious right of mining to lapse under Section 4A of the MMDRA, 1957, have restored the faith of the mining industry in the judiciary and diluted the myth that bias towards environment protection will cost the mining industry its legally entitled due. Furthermore, the State Authorities should now be able to implement the benefit under Section 8A of the 12 January 2015 MMDRA.

  1. UNDERLYING APPRAOCH AND PARAMOUNT CONSIDERATIONS IN THE JUDGMENT DATED 4 APRIL 2016

In view of the foregoing conclusions and findings, it is interesting to understand and analyze the approach adopted by the Apex Court as follows:

  1. Law First- Approach

The Hon'ble Supreme Court of India was mindful that the subsisting lease issue will not only impact the applicant-leaseholders in Orissa who had moved the Court pursuant to the liberty given to them vide the 16 May 2014 Suspension Order but will impact the entire mining industry in the country. Hence, it seems to have decided to interpret the letter of the law without complicating the same by applying the facts while interpreting the law and left the application of complicated leaseholder peculiar facts for later.

  1. Supreme Pedestal to Principles of Natural Justice

The finding of the Hon'ble Supreme Court of India that: "It is not possible for us to accept, that vital vested rights in a leaseholder, can be curtailed without affording him an opportunity to repudiate the impression(s) of the competent authority, namely, that the leaseholder could not have (or had actually not) carried out mining operations, for a continuous period of two years"17 has in unequivocal terms re-affirmed the rule of law and the non-negotiable compliance with the principles of natural justice by the State.

  1. Judiciary recognizes  the Legislature's Intention to Support the Executive

The Hon'ble Supreme Court of India gave due importance to the legislative intent behind the 12 January 2015 MMDRA by noting that: "The purpose for which the instant amendment came to be made by the Parliament, whereby the amended Section 8A was inserted into the MMDR Act reveals, that past litigation resulting in different interpretations of the provisions of the MMDR Act, and the alleged hardship caused to the mining industry, due to second and subsequent renewals remaining pending with the State Government without any decision, had occasioned the passing of the instant amendment."18 Hence, the Hon'ble Supreme Court of India gave due importance to the Legislature's intention to support the Executive in addressing the predicament of pending (second and subsequent) applications under the old Section 8 of the MMDR Act, 1957, by explicitly laying down parameters for being entitled to the extension of mining lease by Section 8A of the 12 January 2015 MMDRA.

  1. No injustice by the operation of Law?

The Hon'ble Supreme Court of India has held that: A leaseholder who had moved a second (third or subsequent) renewal application under Section 8(3) of the unamended MMDR Act, 1957 within the prescribed time period and whose application had not been considered and rejected (though not entitled to any benefit under the unamended Section 8 A of the MMDR Act, 1957 and the amended Rule 24 A (6) of the Mineral Concession Rules, 1960' 19) up to 12 January 2015, would still have the benefit of sub-sections (5) and (6) of Section 8A. 20 Hence, the Hon'ble Supreme Court appears to have saved injustice by operation of law for those whose (second and subsequent) renewal applications which were in a limbo during the period from 18 July 2014 (date of legislative amendment) to 12 January 2015, by holding that such applicants are entitled to the extension of the mining lease under Section 8A.

However, there may be confusion as the Hon'ble Supreme Court of India also expressed its view that: "all second renewals which were assumed to be subsisting by State Governments, would expire with effect from the date of the judgment in the Goa Foundation case, i.e., 21.4.2014, and expressly, with effect from 18.7.2014, when the second proviso to Rule 24A (6) provided accordingly. Unless of course, the Government had passed an express order in writing, as mandated under Section 8(3) of the MMDR Act, extending the subsisting mining lease by a second or subsequent renewal." 21

  1. CONCLUSION & WHAT NEXT?

Although the Law-first Approach is praise-worthy as it benefits all the mining industry stakeholders to understand the law, however, much more is awaited from the Hon'ble Supreme Court of India as follows:

  1. Application of complicated leaseholder peculiar facts will shed clarity on how to apply the law on facts and set factual instances for other to follow.  In the meantime, the State authorities or the leaseholders will be (dis)advantaged due to ambiguity on whether a mining lease is subsisting or not in absence of a factual example by the Hon'ble Supreme Court of India.
  1. Mercy on the already anguished mining industry due to the approaching cut-off date of 31 March 2030/31 March 2020 (as applicable) for entitlement of the extension of mining lease under Section 8A, who as on date is losing time in litigation proceedings.
  1. Balancing idle natural resources versus illegally utilized resources.
  1. Balancing the revenue generated from mining operations benefitting the economy versus protection of the environment.

Common Cause vs .Union of India 22 and Prafulla Samantra & Anr. vs. Union of India & Ors. 23 matters are still pending before the Hon'ble Supreme Court of India and the final judgment disposing the matters will hopefully be in time and provide holistic answers to the mining industry stakeholders.

Footnotes

1 (2014) 14 SCC 155.

2 Supreme Court Judgment dated 4 April 2016 in Common Cause vs .Union of India [Writ Petition (Civil) No. 114 of 2014] and Prafulla Samantra & Anr. vs. Union of India & Ors., [Writ Petition (Civil) No 194 of 2014], Paras 4 and 7, available at: http://supremecourtofindia.nic.in/FileServer/2016-04-04_1459763492.pdf (last visited on 16 May 2016)  

3 Section 8(A) of the 12 January 2015 MMDRA: Period of grant of a mining lease for minerals other than coal, lignite and atomic minerals. —

(1) The provisions of this section shall apply to minerals other than those specified in Part A and Part B of the First Schedule.

(2) On and from the date of the commencement of the Mines and Minerals (Development and Regulation) Amendment Act, 2015, all mining leases shall be granted for the period of fifty years.

(3) All mining leases granted before the commencement of the Mines and Minerals (Development and Regulation) Amendment Act, 2015 shall be deemed to have been granted for a period of fifty years.

(4) On the expiry of the lease period, the lease shall be put up for auction as per the procedure specified in this Act.

(5) Notwithstanding anything contained in sub-sections (2), (3) and sub-section (4), the period of lease granted before the date of commencement of the Mines and Minerals (Development and Regulation) Amendment Act, 2015, where mineral is used for captive purpose, shall be extended and be deemed to have been extended up to a period ending on the 31st March, 2030 with effect from the date of expiry of the period of renewal last made or till the completion of renewal period, if any, or a period of fifty years from the date of grant of such lease, whichever is later, subject to the condition that all the terms and conditions of the lease have been complied with.

(6) Notwithstanding anything contained in sub-sections (2), (3) and sub-section (4), the period of lease granted before the date of commencement of the Mines and Minerals (Development and Regulation) Amendment Act, 2015, where mineral is used for other than captive purpose, shall be extended and be deemed to have been extended up to a period ending on the 31st March, 2020 with effect from the date of expiry of the period of renewal last made or till the completion of renewal period, if any, or a period of fifty years from the date of grant of such lease, whichever is later, subject to the condition that all the terms and conditions of the lease have been complied with.

(7) Any holder of a lease granted, where mineral is used for captive purpose, shall have the right of first refusal at the time of auction held for such lease after the expiry of the lease period.

(8) Notwithstanding anything contained in this section, the period of mining leases, including existing mining leases, of Government companies or corporations shall be such as may be prescribed by the Central Government.

(9) The provisions of this section, notwithstanding anything contained therein, shall not apply to a mining lease granted before the date of commencement of the Mines and Minerals (Development and Regulation) Amendment Act, 2015, for which renewal has been rejected, or which has been determined, or lapsed.

4 [Writ Petition (Civil) No. 114 of 2014].

5 [Writ Petition (Civil) No 194 of 2014].

6 Supra Note 2, Para 32.

7 Supra Note 2, Para 32 (i)

8 Supra Note 2, Para 32 (i)

9 Supra Note 2, Para 32 (vi)

10 Supra Note 2, Para 32 (vi)

11 Supra Note 2, Para 32 (vi)

12 Supra Note 2, Para 32 (iv)

13 Supra Note 2, Para 32 (v)

14 Supra Note 2, Para 32 (vii)

15 Supra Note 2, Para 32 (vii)

16 Supra Note 2, Para 32 (vii)

17 Supra Note 2, Para 30

18 Supra Note 2, Para 25

19 Section 8 prior to 12 January 2015 MMDRA [Unamended Section 8 A]:

Periods for which mining leases may be granted or renewed.—

(1) The maximum period for which a mining lease may be granted shall not exceed thirty years: Provided that the minimum period for which any such mining lease may be granted shall not be less than twenty years;

(2) A mining lease may be renewed for a period not exceeding twenty years.

(3) Notwithstanding anything contained in sub-section (2), if the State Government is of opinion that in the interests of mineral development it is necessary so to do, it may, for reasons to be recorded, authorise the renewal of a mining lease in respect of minerals not specified in Part-A and Part-B of the First Schedule for a further period or periods not exceeding twenty years in each case.

(4) Notwithstanding anything contained in sub-section (2) and sub-section (3), no mining lease granted in respect of mineral specified in Part-A or Part-B of the First Schedule shall be renewed except with the previous approval of the Central Government.

Rule 24 A (6) post 18 July 2014 Amendment (inserted codifying the judgment in Goa Foundation vs. Union of India, (2014) 6 SCC 590 dated 21 April 2014) and as on 12 January 2015 [Amended Rule 24 A (6)]:

xxx xxx xxx

(6) If an application for first renewal of a mining lease made within the time referred to in sub-rule (1) is not disposed of by the State Government before the date of expiry of the lease, the period of that lease shall be deemed to have been extended by a further period of two years or till the State Government passes order thereon, whichever is earlier: Provided that the leases where applications for first renewal of mining lease have been made to the State Government and which have not been disposed of by the State Government before the date of expiry of lease and are pending for disposal as on the date of the notification of this amendment, shall be deemed to have been extended by a further period of two years from the date of coming into force of this amendment or till the State Government passes order thereon or the date of expiry of the maximum period allowed for first renewal, whichever is the earliest: Provided further that the provisions of this sub-rule shall not apply to renewal under sub-section (3) of Section 8 of the Mines and Minerals (Development and Regulation) Act, 1957.

Rule 24 A (6) prior to 18 July 2014 Amendment:

Renewal of mining lease. —(1) An application for the renewal of a mining lease shall be made to the State Government in Form J, at least twelve months before the date on which the lease is due to expire, through such officer or authority as the State Government may specify in this behalf.

(2) The renewal or renewals of a mining lease granted in respect of a mineral specified in Part A and Part B of the First Schedule to the Act may be granted by the State Government with the previous approval of the Central Government.

(3) The renewal or renewals of a mining lease granted in respect of a mineral not specified in Part A and Part B of the First Schedule to the Act may be granted by the State Government: Provided that before granting approval for second or subsequent renewal of a mining lease, the State Government shall seek a report from the Controller General, Indian Bureau of Mines, as to whether it would be in the interest of mineral development to grant the renewal of the mining lease.

Provided further that in case a report is not received from Controller General, Indian Bureau of Mines in a period of three months of receipt of the communication from the State Government, it would be deemed that the Indian Bureau of Mines has no adverse comments to offer regarding the grant of the renewal of mining lease.

(4) An application for the renewal of a mining lease shall be disposed of within a period of six months from the date of its receipt.

(5) If an application is not disposed of within the period specified in sub-rule (4) it shall be deemed to have been refused.

(6) If an application for renewal of a mining lease made within the time referred to in sub-rule (1) is not disposed of by the State Government before the date of expiry of the lease, the period of that lease shall be deemed to have been extended by a further period till the State Government passes order thereon.

20 Supra Note 2, Para 32 (v)

21 Supra Note 2, Para 14

22 [Writ Petition (Civil) No. 114 of 2014]

23 [Writ Petition (Civil) No 194 of 2014]

The content of this document do not necessarily reflect the views/position of Khaitan & Co but remain solely those of the author(s). For any further queries or follow up please contact Khaitan & Co at legalalerts@khaitanco.com

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
 
In association with
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration
Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:
  • To allow you to personalize the Mondaq websites you are visiting.
  • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our information providers who provide information free for your use.
  • Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.
    If you do not want us to provide your name and email address you may opt out by clicking here
    If you do not wish to receive any future announcements of products and services offered by Mondaq you may opt out by clicking here

    Terms & Conditions and Privacy Statement

    Mondaq.com (the Website) is owned and managed by Mondaq Ltd and as a user you are granted a non-exclusive, revocable license to access the Website under its terms and conditions of use. Your use of the Website constitutes your agreement to the following terms and conditions of use. Mondaq Ltd may terminate your use of the Website if you are in breach of these terms and conditions or if Mondaq Ltd decides to terminate your license of use for whatever reason.

    Use of www.mondaq.com

    You may use the Website but are required to register as a user if you wish to read the full text of the content and articles available (the Content). You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these terms & conditions or with the prior written consent of Mondaq Ltd. You may not use electronic or other means to extract details or information about Mondaq.com’s content, users or contributors in order to offer them any services or products which compete directly or indirectly with Mondaq Ltd’s services and products.

    Disclaimer

    Mondaq Ltd and/or its respective suppliers make no representations about the suitability of the information contained in the documents and related graphics published on this server for any purpose. All such documents and related graphics are provided "as is" without warranty of any kind. Mondaq Ltd and/or its respective suppliers hereby disclaim all warranties and conditions with regard to this information, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. In no event shall Mondaq Ltd and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use or performance of information available from this server.

    The documents and related graphics published on this server could include technical inaccuracies or typographical errors. Changes are periodically added to the information herein. Mondaq Ltd and/or its respective suppliers may make improvements and/or changes in the product(s) and/or the program(s) described herein at any time.

    Registration

    Mondaq Ltd requires you to register and provide information that personally identifies you, including what sort of information you are interested in, for three primary purposes:

    • To allow you to personalize the Mondaq websites you are visiting.
    • To enable features such as password reminder, newsletter alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
    • To produce demographic feedback for our information providers who provide information free for your use.

    Mondaq (and its affiliate sites) do not sell or provide your details to third parties other than information providers. The reason we provide our information providers with this information is so that they can measure the response their articles are receiving and provide you with information about their products and services.

    Information Collection and Use

    We require site users to register with Mondaq (and its affiliate sites) to view the free information on the site. We also collect information from our users at several different points on the websites: this is so that we can customise the sites according to individual usage, provide 'session-aware' functionality, and ensure that content is acquired and developed appropriately. This gives us an overall picture of our user profiles, which in turn shows to our Editorial Contributors the type of person they are reaching by posting articles on Mondaq (and its affiliate sites) – meaning more free content for registered users.

    We are only able to provide the material on the Mondaq (and its affiliate sites) site free to site visitors because we can pass on information about the pages that users are viewing and the personal information users provide to us (e.g. email addresses) to reputable contributing firms such as law firms who author those pages. We do not sell or rent information to anyone else other than the authors of those pages, who may change from time to time. Should you wish us not to disclose your details to any of these parties, please tick the box above or tick the box marked "Opt out of Registration Information Disclosure" on the Your Profile page. We and our author organisations may only contact you via email or other means if you allow us to do so. Users can opt out of contact when they register on the site, or send an email to unsubscribe@mondaq.com with “no disclosure” in the subject heading

    Mondaq News Alerts

    In order to receive Mondaq News Alerts, users have to complete a separate registration form. This is a personalised service where users choose regions and topics of interest and we send it only to those users who have requested it. Users can stop receiving these Alerts by going to the Mondaq News Alerts page and deselecting all interest areas. In the same way users can amend their personal preferences to add or remove subject areas.

    Cookies

    A cookie is a small text file written to a user’s hard drive that contains an identifying user number. The cookies do not contain any personal information about users. We use the cookie so users do not have to log in every time they use the service and the cookie will automatically expire if you do not visit the Mondaq website (or its affiliate sites) for 12 months. We also use the cookie to personalise a user's experience of the site (for example to show information specific to a user's region). As the Mondaq sites are fully personalised and cookies are essential to its core technology the site will function unpredictably with browsers that do not support cookies - or where cookies are disabled (in these circumstances we advise you to attempt to locate the information you require elsewhere on the web). However if you are concerned about the presence of a Mondaq cookie on your machine you can also choose to expire the cookie immediately (remove it) by selecting the 'Log Off' menu option as the last thing you do when you use the site.

    Some of our business partners may use cookies on our site (for example, advertisers). However, we have no access to or control over these cookies and we are not aware of any at present that do so.

    Log Files

    We use IP addresses to analyse trends, administer the site, track movement, and gather broad demographic information for aggregate use. IP addresses are not linked to personally identifiable information.

    Links

    This web site contains links to other sites. Please be aware that Mondaq (or its affiliate sites) are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of these third party sites. This privacy statement applies solely to information collected by this Web site.

    Surveys & Contests

    From time-to-time our site requests information from users via surveys or contests. Participation in these surveys or contests is completely voluntary and the user therefore has a choice whether or not to disclose any information requested. Information requested may include contact information (such as name and delivery address), and demographic information (such as postcode, age level). Contact information will be used to notify the winners and award prizes. Survey information will be used for purposes of monitoring or improving the functionality of the site.

    Mail-A-Friend

    If a user elects to use our referral service for informing a friend about our site, we ask them for the friend’s name and email address. Mondaq stores this information and may contact the friend to invite them to register with Mondaq, but they will not be contacted more than once. The friend may contact Mondaq to request the removal of this information from our database.

    Emails

    From time to time Mondaq may send you emails promoting Mondaq services including new services. You may opt out of receiving such emails by clicking below.

    *** If you do not wish to receive any future announcements of services offered by Mondaq you may opt out by clicking here .

    Security

    This website takes every reasonable precaution to protect our users’ information. When users submit sensitive information via the website, your information is protected using firewalls and other security technology. If you have any questions about the security at our website, you can send an email to webmaster@mondaq.com.

    Correcting/Updating Personal Information

    If a user’s personally identifiable information changes (such as postcode), or if a user no longer desires our service, we will endeavour to provide a way to correct, update or remove that user’s personal data provided to us. This can usually be done at the “Your Profile” page or by sending an email to EditorialAdvisor@mondaq.com.

    Notification of Changes

    If we decide to change our Terms & Conditions or Privacy Policy, we will post those changes on our site so our users are always aware of what information we collect, how we use it, and under what circumstances, if any, we disclose it. If at any point we decide to use personally identifiable information in a manner different from that stated at the time it was collected, we will notify users by way of an email. Users will have a choice as to whether or not we use their information in this different manner. We will use information in accordance with the privacy policy under which the information was collected.

    How to contact Mondaq

    You can contact us with comments or queries at enquiries@mondaq.com.

    If for some reason you believe Mondaq Ltd. has not adhered to these principles, please notify us by e-mail at problems@mondaq.com and we will use commercially reasonable efforts to determine and correct the problem promptly.

    By clicking Register you state you have read and agree to our Terms and Conditions