Introduction

Mixed use development is part of the Queensland landscape in a range of contexts and densities. Legislation has developed in Queensland to provide flexibility for projects that integrate different uses and operating environments in one or more buildings, often with progressive development and staging and over more than one market cycle.

The seismic shift in thinking in Queensland came with new subdivision formats under the Land Title Act 1994 and the commencement of the Body Corporate and Community Management Act 1997 (BCCMA). Further changes made in 2005 (which we were specifically consulted on in an industry representative role and drafted in consultation with Government) reinforced and clarified connections between volumetric development and community titled formats.

The tools exist to facilitate mixed use projects, but achieving optimal results requires an understanding of how to best use them and how to deal with the limitations that still exist. In a series of articles beginning with this Update, we will look at tenure and governance for projects in various contexts, and address the interaction of legal structure with planning, delivery, operational and commercial objectives.

In this article we look at principles and issues for mixed use residential projects using a building management statement (BMS) overlay with community titles schemes (Schemes). This structure is common to mixed use residential projects where apartments, in one or more buildings, sit with other uses - retail, short term accommodation, hotel, or commercial.

The BMS structure is often seen as another "body corporate" overlay. The opportunity to tailor a structure to meet project objectives, mitigate risk and enhance outcomes for owners and occupiers can be lost with that perspective. Ensuring these arrangements are fit for purpose is also important in protecting asset values and market reputation.

Pick your structure

There are a number of options for structuring a mixed use apartment project but in general a decision needs to be made at the outset about using Scheme formats exclusively or integrating them within a BMS framework. Tenure and governance can involve a range of subdivision formats and associated instruments – one or more BMS documents, one or more Schemes or combinations of all of these, tailored to project contexts, development and operating requirements.

The following table summarises options for a residential project involving other uses and whether staged or developed in in one or more buildings. Combinations of these options may be adopted depending on the size and complexity of the project.

Development Scenario Governance Option Comment
Multiple Buildings – Mixed use Project

Project may involve:

  • Multiple buildings on common podium or other structures (basements, plaza).
  • Uses allocated to separate buildings (e.g. a hotel tower and a residential tower).
  • Multiple Buildings each containing mixes of uses (e.g. building 1 has hotel and residential and building 2 has commercial, retail and residential).
  • Multiple Buildings with homogenous uses (e.g. apartments in multiple buildings) with other uses in different areas of site (e.g. retail at ground or plaza levels).
Primary BMS

Applies to the lots on initial and subsequent subdivision to define use areas in the Project.

Primary BMS provides whole of site governance.

Secondary governance and tenure can be through Schemes or a secondary BMS. This depends on the interface between uses, buildings and the site as a whole.

Residential (or other) uses within each building or buildings may be established under a Scheme structure (including a layered arrangement of Schemes).

Scheme land within a building or buildings is a lot to which the Primary BMS applies.

Scheme arrangements are tailored to specific development requirements - staging or subsidiary Schemes. Co-located uses remain as lots the Primary BMS level or to be further configured and with autonomous internal management.

A secondary BMS may also be used to address relationships between different uses in one or more buildings.

Mixed Uses within a building may be structured with reference to that building alone or as part of a use spread over multiple buildings (e.g. retail uses in multiple buildings or a common plaza or podium area).

Contiguity requirements of the Land Title Act need to be accounted for in establishing a Primary BMS structure.

Primary BMS

Primary BMS – key features:

Tailored to achieve balance between reciprocal rights, operating needs and autonomy.

Accounts for staging and interim or transitioning uses during and after construction.

Facilitate changes in uses to meet market changes during development.

Flexibility to address services and facilities use on a whole of project basis and as between parts of a project and to establish appropriate facilities management arrangements. Allows distinction between commercial facility management requirements and Scheme caretaking.

Can discriminate between owners and uses to maintain autonomy.

More flexibility for project level management and administration –can dictate level of owner involvement on particular issues in decision making.

More flexible cost contribution and sharing arrangements which are not limited by BCCMA.

Ability to bind bodies corporates to management group decisions.

More commercially appropriate dispute resolution – disputes are not trapped in the BCCMA regime.

A secondary BMS for part of a project offers similar benefits to Primary BMS when used to regulate subsidiary uses.
Scheme structures used as required within overall project and to quarantine Scheme management issues while committing to project level or building arrangements.

Market familiarity with Scheme structure is preserved without undue constraint on development and operating requirements.

Mixed Use - Stand Alone Building

Standalone building with mixed uses (e.g. commercial, residential, hotel etc.)

Single BMS Framework and Scheme

As with multi-building project a BMS integrates uses in a single building while balancing essential reciprocal rights with autonomy for internal management of particular uses as required.

A Scheme structure applies for the residential components tailored to suit specific development requirements (for example any staging or subsidiary Scheme requirements).

Single BMS Framework and Scheme

Similar flexibility and advantages to those set out above apply in managing the interface between different uses in a single building.

An alternative to the BMS framework would be a layered arrangement of Schemes in the building with a principal scheme body corporate. However, this will involve putting retail, commercial and hotel uses (for example) into separate Schemes and regulation modules all under the BCCMA regulatory framework which may not be appropriate or optimal for those assets.

Apartments - Single Building

A residential apartment tower or low or midrise residential project in attached built form.

Scheme Structure

In a single residential apartment tower, a Scheme structure is used, tailored to suit specific development requirements (for example any staging or subsidiary scheme requirements).

Limited non-residential uses can be accommodated within a single Scheme structure (e.g. limited retail at ground level). Once non-residential uses expand the scope for a single Scheme to accommodate those different uses becomes limited.

Scheme Structure

A Scheme is the applicable format in general.

In projects involving mixes of multi-level / attached / semi attached or detached residential product in a Scheme structure, differentiation may be made between built form by use of additional Schemes – either linked or stand alone depending on project configuration.

There are high density easements and/or BMS arrangements that can be adopted for smaller projects.

Residential only – Multi Stage and Mixed Format

May involve multiple buildings in stages with a mix of density

  • medium density in town homes or low to midrise product and higher density apartments in higher rise buildings.

Development may be staged and facilities may be shared or quarantined to particular stages or owners.

CTS Structure

In a multi-staged residential project, a Scheme structure can be used, tailored to suit specific development requirements for staging and subsidiary Schemes - created to reflect differing product mix and / or subdivision formats.

Forecast development parameters can be embedded in the Scheme structure to preserve development rights. Limited non-residential uses can be accommodated in any stage under the Scheme structure or in subsidiary Schemes.

In a multi-building project, a BMS or easements might also be considered to achieve an allocation of rights between stages.

Tilting requirements where mixed subdivision plan formats are used for different product have to be accounted for in the Scheme structure and may necessitate use of a layered arrangement of Schemes - relevant to mixes of high and medium density development in a project (apartments, town houses and detached dwellings with private yards or courtyards).

CTS Structure

Generally a Scheme structure will be appropriate although a BMS can be considered to provide overarching rights between components and non-Scheme development may also be incorporated using a BMS or easements or on proximity.

Particular facilities and amenities might be provided by way of exclusive use allocations of common property or body corporate assets to particular groups of owners – for example, a particular recreation facility may be allocated to owners in a particular building or stage on an exclusive use basis.

A single Scheme may be progressively expanded or there may be multiple Schemes if staging profile warrants – for example in a large scale community style development having a principal Scheme may be beneficial for purpose of:

  • separation of common property and facilities through exclusive use allocations among subsidiary Schemes; and
  • Allocation of body corporate assets held at principal Scheme level.

Important Matters for tenure and governance under a BMS framework

There are a number of critical matters to be considered in structuring tenure and governance arrangements using a BMS framework with one or more residential Schemes. These matters feed into the project delivery and sale arrangements, especially for the sale of apartments off the plan, letting of retail and commercial areas and appropriate recognition of the operational requirements for different uses. Too often these factors are not considered or are not addressed adequately.

Understanding content requirements

The BMS offers tailored arrangements but content limitations under legislation must be observed. The BMS is a registered instrument. It identifies lots to which it applies and attracts indefeasibility. Covenants in a BMS benefit and burden the lots and bind and benefit successors in title where they run with the lots.

Achieving optimal leverage and development outcomes means understanding the scope of the covenants that will run with title, how legislative content restrictions operate and how development and operating arrangements can be accommodated. The BMS is an overarching governance framework for a project and has to be able to be implemented and administered for the lifecycle of the project.

Potential owners and occupiers of all components expect security of tenure and undertake due diligence on rights and obligations. Deficiencies in BMS arrangements will adversely impact marketability and value assessments for project assets. Fixing deficiencies retrospectively or in the middle of a sales campaign has potential consequences for disclosure and certainty of contractual enforcement. Accordingly, the ability to "design" BMS arrangements that are legally and commercially certain is crucial to both disposal and to operating phases of a project. Establishing BMS content with reference to off the plan sales disclosure while reserving development options is an essential part of framing the BMS.

An appropriate BMS framework

The BMS is not intended to replicate a body corporate structure.

A properly drawn BMS will avoid administrative duplication and secure appropriate reciprocal rights and obligations to allow the project to function cohesively but with required autonomy for each use. This is particularly important in terms of the different approaches to asset management, maintenance and operation that follow with different use types.

In significant projects, infrastructure will often require appropriate facility management arrangements beyond the scope of residential caretaking arrangements typically associated with stand-alone apartment product. Increasingly, energy supply and management and other services introduce regulatory overlays and providing best practice outcomes requires recognition in the BMS and other tenure structures. This is relevant, for example, for embedded electricity networks and supply arrangements but also communications infrastructure and other services. A BMS allows these matters to be implemented across project components, including at Scheme level, provided the impact of subdivision and management arrangements is properly accounted for. Provisions in the Land Title Act concerning BMS management group decisions binding bodies corporate (despite limitations on delegation under the BCCMA) also need to be considered in framing facility management arrangements and the role of the BMS management group.

While assessment of building costs, maintenance programs and forecast capital expenditure requirements can and should inform the BMS and its administration, replication of the Scheme contribution structure under a BMS will not be appropriate or necessary in many cases. Commercial and other non-residential owners may not fund capital expenditure from recurrent periodic contributions built up over time. Requiring them to do so may create conflict and adversely impact return metrics, values and complicate cost recovery in leases. In TOD developments, operating transport infrastructure usually requires specific controls and requirements that would not be consistent with a "residential" contribution regime.

Cost allocations at BMS levels may flow through to underlying Schemes and the BMS cost regime will be a key part of determining statutory disclosure to residential buyers. Poorly thought out BMS arrangements can be the source of changes to disclosed material that may trigger termination grounds under off the plan apartment sales.

Decision making and the management group structure also needs careful consideration. The management group under a BMS does not have to regulate or decide matters about every aspect of the project. The scope for management group decision making should be limited to the core reciprocal rights arrangements and respect autonomy for internal management for different uses, including the role of the body corporate for a residential Scheme. Decision making can be more flexibly dealt with than under a Scheme structure where voting entitlements and processes are prescribed more narrowly. For example, decisions on certain matters may be preserved to a particular owner as may be the case where operating transport infrastructure and crown land is involved or where a particular facility, although shared, is critical to a particular owner (e.g. a loading dock or parking area).

The management group can also be a vehicle for binding bodies corporate to decisions about matters where they would otherwise not be empowered to delegate functions under the BCCMA (as a result of provisions in the Land Title Act). This is, for example, relevant to establishing and preserving facility management arrangements; a level of delegation to a facilities manager may of mitigate issues that can arise where infrastructure requirements are beyond the scope of the body corporate committee or onsite manager to handle or where requiring multiple bodies corporate to concur about a service requirement for infrastructure is inefficient. Facilities management rights may themselves become an asset of the project.

Understanding the operation of term limitation provisions for body corporate contracts in this context is however important as bodies corporate will still be a party to facility management arrangements as owners established through the agency of the BMS management group. Such arrangements are also required to be the subject of disclosure and planning for these arrangements at the outset is relevant to ensuring disclosure to buyers is accurate. Even if precise contract terms are not fixed or known when the BMS is initially drafted, the scope for these arrangements can be anticipated both contractually and form a cost view point.

Dispute resolution is potentially more flexible under a BMS. Using a layered arrangement of Schemes brings with it the BCCMA framework for dispute resolution. While disputes as defined under the BCCMA do not extend to all types of commercial matters, a BMS offers the ability to prescribe alternative or multiple dispute mechanisms which may be more suitable to the relationships between different owners in a mixed use project.

Tenure and Planning Road Map

The BMS must work within the requirements of titling legislation and must compliment planning approvals. The BMS can be a mechanism that provides security for planning objectives and outcomes to meet assessing authority requirements. This can range from securing access and essential infrastructure and facility rights for a use to mitigating perceived amenity impacts. The BMS should be developed as part of the architectural and planning concept and in conjunction with the approvals process.

In significant mixed use projects the interaction between public and private open space and other publicly accessible areas is often critical to approvals and satisfying assessing authority requirements. The BMS can assist in addressing these matters and providing a balanced solution that preserves commercial objectives. For example, public cross links and access through sites can be preserved through an internal BMS covenant matching approval conditions requiring access to be maintained and preventing any owner limiting access to designated areas. The combination of a planning approval condition and BMS term may be a better solution (from an assessing authority view point) than a public thoroughfare easement because that type of easement by legislation requires maintenance responsibility to be borne by the Council.

In other scenarios, the design and subdivision requirements of the project may impact dedications and require consideration of the interaction of BMS provisions with other instruments including covenants and easements. In circumstances where transport land is involved (as defined under the Transport Infrastructure Act 1994 – which includes busways, rail corridor land and other transport related land and facilities) a BMS can be registered over freehold and crown land. Integration of private and public facilities may involve acceptance of volumetrically defined areas to fit with optimal design and operating requirements. This can raise issues for assessing authorities who often have preconceived ideas about the format and configuration of dedicated areas and infrastructure, and in some cases, about the use of infrastructure as a shared service as opposed to requiring separate infrastructure to be provided for each use.

Subdivisional requirements and future development

Preconditions apply to registration of a BMS. At least one volumetric lot and one standard format balance lot must be in existence at registration. As such the BMS is inextricably linked to the subdivision sequence for a project. Allocating balance lots (containing surface, airspace and subsurface areas not incorporated in other volumetric lots) can be a critical part of controlling development and operating rights and arrangements.

The BMS must be drafted with a clear understanding of the subdivision pattern and the timing for establishment of tenures, particularly Schemes for residential components and any secondary BMS for a particular building (if applicable). If this is not adequately accommodated there may be flow on effects for establishing Schemes and for sales of interests in the project. For example, a BMS may anticipate the creation of a development lot to be subsequently included in a Scheme as a stage of development. In turn, this needs to be reflected in forecasts for development in the community management statement for the Scheme. There are different timing points at which this could occur (on Scheme establishment or subsequently) which could affect development rights in that Scheme and cost contributions of owners and disclosure in the pre-sales phase.

Each lot to which a BMS applies must be a lot entirely or partly contained in, or entirely or partly containing, 1 or more buildings. However, a BMS may also apply to lots that don't meet this criteria if the lot is the subject of a building development approval – being a development approval or compliance permit, under the Sustainable Planning Act 2009, for development relating to a proposed building or buildings. Vacant lots for future development or lots within Buildings can be brought within the BMS framework and a coherent future development regime can be embedded in the document. Where a large project involves future re-development of already improved land but approvals are not finalised for that redevelopment, those lots may still be made the subject of the BMS so as to preserve rights that may be required for the future development – for example, future access or shared services and facility rights.

In a staged project, future development provisions in a BMS will marry with planning approvals and subdivision sequencing. It is important from a pre-sales disclosure view point that future development provisions at BMS level are reflected and linked appropriately to the forecasts of development in any community management statement for a relevant Scheme. Disconnects in that regard may affect a developer's rights to control staged development or create inconsistencies that trigger further disclosure unnecessarily.

The BMS may provide certainty required to allow for accelerated title creation (and disposal) for use segments in a project which can have significant commercial implications. For example, we have been involved in major mixed use projects where title is created and transferred before construction and contemporaneous development rights secured - site integrity is maintained for assessing authority requirements.

The BMS can be used to preserve areas for shared and future uses, to change conditions of access and availability during development - for example, to allow interim use of an area for or during construction, to allow multi-use of a facility such as allocating parking rights to different time periods, to transition use arrangements as development is completed, including parking and other facilities access and to allow for progressive delivery of stages within buildings or across buildings. Contributions to costs for facilities and areas can be staggered accordingly and to mitigate cost imposts on owners in bodies corporates pending development completion.

Rights to introduce or change uses in a project can also be enhanced by using a BMS to regulate types of development and stages of development. The BCCMA provisions that require notification of use changes in forecast development do not apply to lots under a BMS that are not part of a Scheme. This allows for a more flexible relationship between proposed uses, disclosure of use intents in pre-sales and changes to planning approvals over time.

Conclusion

A properly considered tenure and governance framework will work with and form part of project planning, delivery and disposal arrangements and support asset values and operation for the lifecycle of the Project. We work with developers and consultant teams to provide this framework and manage implementation under it.

Norton Rose Fulbright have been involved with volumetric and Scheme formats since they were introduced in Queensland legislation and have consulted to Government and for industry on legislative changes and policy for 20 years. A hallmark of our project work is the establishment of robust yet flexible project arrangements that tie concept, planning, construction, design, disposal and operation together coherently.

Our project book includes some of the most innovative and dynamic developments in Queensland's urban fabric, both competed and currently being constructed. We bring that knowledge and expertise to every project we work on. For more information about the issues in this article or any other aspect of mixed use and Scheme development in Queensland please contact Matthew Derrick. For enquiries about similar development issues for Projects in other Australian States you can contact our other listed Partners.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

 
Some comments from our readers…
“The articles are extremely timely and highly applicable”
“I often find critical information not available elsewhere”
“As in-house counsel, Mondaq’s service is of great value”

Related Topics
 
Related Articles
 
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Register for Access and our Free Biweekly Alert for
This service is completely free. Access 250,000 archived articles from 100+ countries and get a personalised email twice a week covering developments (and yes, our lawyers like to think you’ve read our Disclaimer).
 
Email Address
Company Name
Password
Confirm Password
Position
Mondaq Topics -- Select your Interests
 Accounting
 Anti-trust
 Commercial
 Compliance
 Consumer
 Criminal
 Employment
 Energy
 Environment
 Family
 Finance
 Government
 Healthcare
 Immigration
 Insolvency
 Insurance
 International
 IP
 Law Performance
 Law Practice
 Litigation
 Media & IT
 Privacy
 Real Estate
 Strategy
 Tax
 Technology
 Transport
 Wealth Mgt
Regions
Africa
Asia
Asia Pacific
Australasia
Canada
Caribbean
Europe
European Union
Latin America
Middle East
U.K.
United States
Worldwide Updates
Registration (you must scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions