UK: Alternative Dispute Resolution For Energy And Infrastructure Projects - What Are The Alternatives?

Introduction

Energy and infrastructure construction projects take time, are technically complex, are of significant value, and involve a spectrum of participants with different interests. It is inevitable that there will be claims and disputes arising out of these projects. The contractor will ask for more time, more money, or both. Whilst not all claims will become disputes, it would be a rare owner that accepted every claim.

So, acknowledging that claims and disputes are going to arise, what is the best procedure to try and resolve them without having to resort to formal litigation or arbitration proceedings?

Agreeing your dispute resolution provisions – invest time now, save time and money later

Naturally, disputes are the last thing on the parties' minds as they work long and hard to negotiate and agree detailed contract provisions and to close the deal. However, a midnight-hour handshake on an agreement which includes boilerplate or unconsidered dispute resolution provisions is best avoided. Careful thought about the most suitable type of dispute resolution provisions at the outset will pay dividends on large-scale construction contracts. This is because the dispute provisions present the parties with a real opportunity to put in place alternative processes which will allow claims and disputes to be identified quickly, resolved efficiently and, above all, will allow the parties to maintain their focus on the real objective – the completion of the project.

A multitude of alternative dispute resolution processes can be used to try and resolve disputes in advance of formal proceedings.

Alternative methods of dispute resolution – what are they and why should parties use them?

Construction contracts are usually arranged so that, where possible, practical issues, including claims, are dealt with during the currency of the works. As a first step, the claim will be notified to and determined by the owner or its representative (the Engineer or Project Manager). If either party is dissatisfied with that determination, a number of other processes can be pursued to try and resolve the dispute in advance of formal proceedings. Typically, the procedure will involve at least one, but probably a combination, of the following, and the parties may be required to go through one step before they can proceed to the next:

  • Negotiation
  • Conciliation or mediation
  • Adjudication
  • Litigation or arbitration, or, in some instances, expert determination

There are a number of reasons why alternative dispute resolution processes can be advantageous:

  • They encourage the contractor to present sound and supported claims as early as possible. If a contractor knows that in order to establish its claim it is likely to have to go through not one, but a number of processes, it may take more care with claims it advances. The time and cost expended in order to follow the process will go some way toward convincing the contractor not to pursue weak or unmeritorious claims. It is also hoped that the process will encourage the contractor to provide more, rather than less, in the way of support and substantiation of its claims at an early stage.
  • They can be used to test and challenge claims and/or to try to start a more commercial dialogue about resolving them.
  • They encourage the parties to deal with claims and disputes early and cost effectively; further proceedings can be avoided. But there is also another, less obvious, saving. Contractors required to assess claims early, as and when the issues arise, will usually provide a more realistic, less strategic, assessment of their loss. The later the claim the higher the risk that the contractor will become entrenched in its position and develop an unrealistic view of its claim. Owners who fairly engage in the process, and deal with claims as they arise, will maintain the goodwill of the contractor and allow the parties to focus on the successful delivery of the project.
  • They provide the parties with an opportunity to learn more about claims which, if not resolved, may result in formal dispute proceedings. This knowledge is valuable because it enables the parties to adjust their positions and prepare for such proceedings.

So, in the context of the above, what are the various methods and what do they have to offer?

Negotiation

If the parties are willing to make a real attempt to resolve the dispute, this is probably the most simple and cost-effective way of doing so. This method can also help to preserve a good working relationship between the parties, which, on a project that is likely to take a reasonably significant time to complete, is of real value.

If negotiation is to be attempted, parties commonly agree that the discussions should be held by senior management or executives in the respective companies who are not part of the project delivery team and/or are not involved in the day-to-day project work. This is because these individuals often find it easier to see the bigger picture and to view things from a more commercial perspective, rather than being focussed on who is right and who is wrong. This process is completely within the parties' control and the parties do not have to reach an agreement. The other advantage is that, if appropriate steps are taken, the parties can be relatively free in their discussions and can make concessions and/or offers to settle without adversely impacting their position in any later arbitration or litigation if the matter is not resolved. This can be achieved by stating that the discussions and correspondence are 'without prejudice' or, in some jurisdictions, entering into a separate confidentiality agreement covering the negotiations.

Conciliation and Mediation

These terms are often used interchangeably and without consistency. Both describe a dispute resolution method where a neutral third party, the conciliator or mediator, assists the parties to reach a settlement. This process remains non-binding, private and non-discloseable unless and until a settlement is reached, and is particularly useful where direct negotiations are considered unlikely to resolve the issue, whether because the parties' relationship has started to break down or otherwise.

A mediation usually consists of an opening session with both/all parties and the mediator. The parties get to briefly state their case and there are then a series of private meetings between each party and the mediator (caucuses), during which the mediator explores each party's issues and expectations to see if a settlement can be achieved, as this of course is not guaranteed. The mediator cannot discuss what is said in caucus with the other party unless authorised to do so.

The real advantages of this method are that it is relatively cost effective (as compared with the sums the parties may have to spend if the dispute is not resolved) and commercial. A well-run mediation will not focus on who is right and who is wrong, but on the legal, commercial, reputational, etc. risks associated with each party's position and the 'dollar value' of the same.

The other real benefit of mediation is its flexibility. Both the process and terms of any settlement are in the hands of the parties. The settlement can be wide-ranging and can encompass, for example, agreements as to future business.

Adjudication

In adjudication, a neutral adjudicator gives a decision or recommendation on the dispute between the parties, following written and sometimes oral submissions, within a predetermined and usually very short time limit.

The UK provides a statutory right to adjudicate and there is a similar right in other jurisdictions, such as in Australia, New Zealand and Singapore. That means that even where the contract does not provide for it, either of the parties may refer disputes to adjudication, although this is usually a right, rather than an obligation.

Regardless of any statutory rights, any contract may make provision for adjudication. This is now common on international construction projects and will take the form of a dispute board. Dispute boards usually consist of one or three members (though there may be more). They may operate as a dispute review board, which provides a non-binding recommendation, or a dispute adjudication board, which gives an interim binding decision.

Dispute boards can be formed on an ad-hoc basis, solely for the purpose of a particular dispute, or they can be a full-term panel engaged from the commencement of a project and then kept up to date on progress and developments, including by way of periodic site visits.

An adjudicator's decision is or can become binding on the parties. It is not usually final at the time it is given, but may become so in certain circumstances, depending on the contract. However, in most cases, the parties can challenge an adjudicator's decision and take the dispute on to arbitration or litigation.

If the parties accept the adjudicator(s)' decision and do not seek further relief, then adjudication can be a quick and cost-effective way to resolve disputes and avoid formal proceedings. For larger projects where full-term panels are engaged, there is a further time and cost-saving, in that the adjudicators ought to be up-to-speed on the background to and status of the project, and it should not be necessary to spend time rehearsing those details when referring a claim.

The other potential benefit to adjudication is that the process requires the parties to engage with the dispute and to consider, investigate and present their own position and the evidence in support of it. Being forced to do this early means that more, and better quality, information and evidence concerning the claim will be captured.

However, on the flip side, the very short timescales in which adjudication takes place does mean that for some disputes, particularly the large and complex ones, the parties and the panel will not have sufficient time to address the claims in a manner they perhaps deserve. Thought should be given to the disputes likely to arise and the timescales to be imposed when considering any contractual adjudication provision.

A high percentage of disputes referred to dispute boards are thought to be resolved, without further recourse to arbitration or litigation. Thus the trend for adjudication internationally is very likely to continue, not least because the World Bank, other multilateral development banks, the Fédération Internationale Des Ingénieurs-Conseils (or FIDIC) and the International Chamber of Commerce (ICC) all now advocate use of the dispute board process.

Expert Determination

Expert determination is a dispute-resolution process in which an independent individual, who is an expert in the subject matter of the dispute, is appointed by the parties to resolve the matter. The contract may provide for the expert's decision to be final and binding and, if so, it is extremely difficult to overturn the expert's determination. Whilst, for this reason alone, it is not for the faint hearted, the parties can control the timetable and process, and expert determination can therefore be a speedy and cost-effective method of dispute resolution.

How to use alternative dispute resolution

The methods set out above may be used alone or in an agreed combination. However, the dispute resolution process must always end with a procedure which provides for a final and binding resolution of the dispute, such as litigation, arbitration or expert determination.

A multi-tiered dispute resolution provision has a number of advantages, but real thought should be given to the full implications of using such processes. Which are more likely to work in the context of the project, parties and their personalities? Will the processes in fact save time and money, or will the cost and time taken to move through the tiers become disproportionate given the likely type and value of the disputes?

Once the procedures have been chosen, the relevant clause must be clearly and carefully drafted. Each 'tier' must have an express start and end point, and it should be clear when a party has completed a tier and can move on to the next, where progressing through the tiers is a mandatory requirement. This is important, as failure, or perceived failure, to comply with a mandatory process can lead to jurisdictional challenges in later proceedings.

Conclusion

Only a small percentage of disputes end up in litigation or arbitration, so it is clear that alternative dispute resolution methods are working to resolve disputes. However, proper consideration is required at the outset of any contract to assess and put in place the most suitable type of alternative processes for your project. Once they are in place, parties must learn how to operate them to their advantage. The investment needed to get familiar with these processes and to thereafter become adept at using them can pay real dividends in terms of better claim outcomes.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Similar Articles
Relevancy Powered by MondaqAI
 
In association with
Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Related Articles
 
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Mondaq Free Registration
Gain access to Mondaq global archive of over 375,000 articles covering 200 countries with a personalised News Alert and automatic login on this device.
Mondaq News Alert (some suggested topics and region)
Select Topics
Registration (please scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions